* This file has been produced with: "AirspaceConverter" Version: 0.3.8 * For info visit: https://www.alus.it/AirspaceConverter * Copyrights(C) 2016-2021 Alberto Realis-Luc, Valerio Messina * * WARNING: * AirspaceConverter is an experimental software. So, please, be aware that the output may contain errors! * The users are kindly requested to report any error or discrepancy found. * * Disclaimer: * The authors of AirspaceConverter assume no liability at all for the previous, actual or future correctness, completeness, functionality or usability * of the data provided in this file and the usage of AirspaceConverter. There exists no obligation at all for the authors to continuously update * or maintain the data provided. The airspace structure in this file and the data contained therein are only intended to serve as a means to facilitate * familiarization with and to illustrate air space structure. This airspace structure file does not replace the pilot's obligation for preflight * planning nor shall it be used as a means of support during flight. In particular, use of the this airspace structure file does not excuse the user * from the responsibility to observe the current issue of any relevant AIP, AIP Supplements, NOTAM and AICs. * The use of this airspace structure and/or waypoints file takes place only at the user's total own risk. * Commercial use of the data provided via this airspace structure and/or waypoints file is strictly prohibited. * The use of AirspaceConverter is only at complete user's own risk. * Any commercial usage of AirspaceConverter is also strictly prohibited if not authorized by its owner. * * Error reports, complaints and suggestions please email to: info@alus.it * This file was created on: Sun 21 February 2021 at 06:31:53 UTC AC C AN Chitose PCA-1 AL 700 FT AMSL AH 2000 FT AMSL DP 42:57:08 N 141:42:18 E V D=- V X=42:47.6708 N 141:39.9859 E DB 42:52:05 N 141:43:11 E,42:52:01 N 141:36:37 E DP 42:52:01 N 141:36:37 E DP 42:56:35 N 141:35:58 E DP 42:57:08 N 141:42:18 E AC C AN Chitose PCA-2 AL 3000 FT AMSL AH 6000 FT AMSL DP 42:57:08 N 141:42:18 E V D=- V X=42:47.6708 N 141:39.9859 E DB 42:52:05 N 141:43:11 E,42:52:01 N 141:36:37 E DP 42:52:01 N 141:36:37 E DP 42:56:35 N 141:35:58 E DP 42:57:08 N 141:42:18 E AC C AN Chitose PCA-3 AL 1000 FT AMSL AH 8000 FT AMSL DP 43:03:51 N 141:41:07 E DP 42:57:08 N 141:42:18 E DP 42:56:35 N 141:35:58 E V X=42:45:52 N 141:40:25 E DB 43:03:25 N 141:34:59 E,43:03:52 N 141:40:45 E DP 43:03:52 N 141:40:45 E DP 43:03:51 N 141:41:07 E AC C AN Chitose PCA-4 AL 700 FT AMSL AH 2000 FT AMSL DP 42:42:11 N 141:44:56 E DP 42:35:19 N 141:46:09 E DP 42:34:42 N 141:39:06 E V D=- V X=42:46.5028 N 141:41.5417 E DB 42:42:15 N 141:38:01 E,42:42:11 N 141:44:56 E AC C AN Chitose PCA-5 AL 3000 FT AMSL AH 6000 FT AMSL DP 42:44:01 N 141:44:37 E DP 42:35:19 N 141:46:09 E DP 42:34:42 N 141:39:06 E V D=- V X=42:47:40 N 141:39:59 E DB 42:42:54 N 141:37:56 E,42:43.7712 N 141:44:15 E DP 42:43.7712 N 141:44:15 E DP 42:44:01 N 141:44:37 E AC C AN Chitose PCA-6 AL 1000 FT AMSL AH 8000 FT AMSL DP 42:35:19 N 141:46:09 E V X=42:45.6029 N 141:40:30 E DB 42:28:36 N 141:47:19 E,42:27:52 N 141:40:05 E DP 42:27:52 N 141:40:05 E DP 42:34:42 N 141:39:06 E DP 42:35:19 N 141:46:09 E AC C AN Chitose PCA-7 AL 1500 FT AMSL AH 2000 FT AMSL DP 43:02:57 N 141:48:10 E DP 42:30:48 N 141:53:47 E DP 42:30:21 N 141:52:49 E DP 42:29.9375 N 141:51.8032 E V X=42:45.8678 N 141:40:25 E DB 42:29.9375 N 141:51.8032 E,42:28:36 N 141:47:19 E DP 42:28:36 N 141:47:19 E V D=- V X=42:46:31 N 141:41:33 E DB 42:42:11 N 141:44:56 E,42:50.4847 N 141:45.686 E DP 42:50.4847 N 141:45.686 E DP 42:50:35 N 141:45:30 E DP 42:50:57 N 141:45.1367 E V X=42:47:40 N 141:39:59 E DB 42:50:57 N 141:45.1367 E,42:52:05 N 141:43:11 E DP 42:52:05 N 141:43:11 E DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V D=+ V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E AC C AN Chitose PCA-8 AL 3000 FT AMSL AH 8000 FT AMSL DP 43:02:57 N 141:48:10 E DP 42:30:48 N 141:53:47 E DP 42:30:21 N 141:52:49 E DP 42:29.9375 N 141:51.8032 E V X=42:45.8678 N 141:40:25 E DB 42:29.9375 N 141:51.8032 E,42:28:36 N 141:47:19 E DP 42:28:36 N 141:47:19 E DP 42:44:01 N 141:44:37 E DP 42:44:20 N 141:45.0544 E DP 42:44.6723 N 141:45.4404 E V D=- V X=42:47:40 N 141:39:59 E DB 42:44.6723 N 141:45.4404 E,42:52:05 N 141:43:11 E DP 42:52:05 N 141:43:11 E DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V D=+ V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E AC C AN Chitose PCA-9 AL 4000 FT AMSL AH 8000 FT AMSL V X=42:45:52 N 141:40:25 E DB 43:02:57 N 141:48:10 E,42:31:04 N 141:54:21 E DP 42:31:04 N 141:54:21 E DP 42:30:48 N 141:53:47 E DP 43:02:57 N 141:48:10 E AC C AN Chubu PCA-1 AL 3000 FT AMSL AH 7000 FT AMSL DP 35:09:26 N 136:46:34 E V D=- V X=34:51:29 N 136:48:11 E DB 35:06:28 N 136:47:16 E,35:05:26 N 136:41:26 E DP 35:05:26 N 136:41:26 E DP 35:05:07 N 136:40:34 E V D=+ V X=34:51:29 N 136:48:11 E DB 35:08:01 N 136:39:29 E,35:9.35606 N 136:45:32 E DP 35:9.35606 N 136:45:32 E DP 35:09:26 N 136:46:34 E AC C AN Chubu PCA-10 AL 3000 FT AMSL AH 7000 FT AMSL DP 34:37:18 N 136:54:10 E V X=34:51:29 N 136:48:11 E DB 34:34:20 N 136:54:52 E,34:33.4889 N 136:49:03 E DP 34:33.4889 N 136:49:03 E DP 34:33:29 N 136:48:01 E DP 34:36:29 N 136:47:39 E DP 34:36:29 N 136:47.6903 E DP 34:36:29 N 136:48:38 E V D=- V X=34:51:29 N 136:48:11 E DB 34:36:29 N 136:48:38 E,34:37:18 N 136:54:10 E AC C AN Chubu PCA-2 AL 2500 FT AMSL AH 7000 FT AMSL DP 35:06:28 N 136:47:16 E DP 35:04:36 N 136:47:42 E DP 35:03:33 N 136:41:09 E DP 35:05:07 N 136:40:34 E DP 35:05:14 N 136:40.8527 E DP 35:5.52239 N 136:41:44 E V X=34:51:29 N 136:48:11 E DB 35:5.52239 N 136:41:44 E,35:06:28 N 136:47:16 E AC C AN Chubu PCA-3 AL 1800 FT AMSL AH 7000 FT AMSL DP 35:04:36 N 136:47:42 E DP 35:02:38 N 136:48:10 E DP 35:01:38 N 136:41:52 E DP 35:03:33 N 136:41:09 E DP 35:04:36 N 136:47:42 E AC C AN Chubu PCA-4 AL 1300 FT AMSL AH 5500 FT AMSL DP 35:02:38 N 136:48:10 E DP 34:59:42 N 136:48:52 E DP 34:58:45 N 136:42:56 E DP 35:01:38 N 136:41:52 E DP 35:02:38 N 136:48:10 E AC C AN Chubu PCA-5 AL 800 FT AMSL AH 4000 FT AMSL DP 34:59:42 N 136:48:52 E V D=- V X=34:51:30 N 136:48:19 E DB 34:56:24 N 136:49:39 E,34:55:32 N 136:44:40 E DP 34:55:32 N 136:44:40 E DP 34:55:14 N 136:44:15 E DP 34:58:45 N 136:42:56 E DP 34:59:42 N 136:48:52 E AC C AN Chubu PCA-6 AL 800 FT AMSL AH 4000 FT AMSL DP 34:47:24 N 136:51:47 E DP 34:44:06 N 136:52:34 E DP 34:43:10 N 136:46:48 E V D=- V X=34:51:28 N 136:48.3068 E DB 34:46:47 N 136:46:20 E,34:47:24 N 136:51:47 E AC C AN Chubu PCA-7 AL 1300 FT AMSL AH 5500 FT AMSL DP 34:44:06 N 136:52:34 E DP 34:41:09 N 136:53:15 E DP 34:40:11 N 136:47:10 E DP 34:43:10 N 136:46:48 E DP 34:44:06 N 136:52:34 E AC C AN Chubu PCA-8 AL 1800 FT AMSL AH 7000 FT AMSL DP 34:41:09 N 136:53:15 E DP 34:39:11 N 136:53:43 E DP 34:38:11 N 136:47:26 E DP 34:40:11 N 136:47:10 E DP 34:41:09 N 136:53:15 E AC C AN Chubu PCA-9 AL 2500 FT AMSL AH 7000 FT AMSL DP 34:39:11 N 136:53:43 E V X=34:51:29 N 136:48:11 E DB 34:37:18 N 136:54:10 E,34:36:29 N 136:48.5909 E DP 34:36:29 N 136:48.5909 E DP 34:36:29 N 136:47:39 E DP 34:38:11 N 136:47:26 E DP 34:39:11 N 136:53:43 E AC C AN Fukuoka PCA-1 AL 3000 FT AMSL AH 5000 FT AMSL DP 33:42:52 N 130:24:30 E DP 33:37:40 N 130:28:05 E DP 33:35:40 N 130:23:55 E DP 33:40:52 N 130:20:20 E DP 33:42:52 N 130:24:30 E AC C AN Fukuoka PCA-2 AL 800 FT AMSL AH 5000 FT AMSL DP 33:46:21 N 130:22:07 E DP 33:42:52 N 130:24:30 E DP 33:40:52 N 130:20:20 E DP 33:44:21 N 130:17:57 E DP 33:46:21 N 130:22:07 E AC C AN Hyakuri TCA-1 AL 1300 FT AMSL AH 1800 FT AMSL DP 35:57:32 N 140:29:39 E DP 35:56:26 N 140:30:02 E DP 35:59:30 N 140:16:51 E DP 35:59.5739 N 140:16:55 E DP 35:59.9702 N 140:17.1723 E DP 36:00:23 N 140:17:23 E DP 35:57:32 N 140:29:39 E AC C AN Kagoshima PCA-1 AL 3000 FT AMSL AH 6000 FT AMSL DP 31:48:01 N 130:46:06 E DP 31:45:28 N 130:48:05 E DP 31:43:17 N 130:44:08 E DP 31:45:59 N 130:42:10 E DP 31:48:01 N 130:46:06 E AC C AN Kagoshima PCA-2 AL 3000 FT AMSL AH 6000 FT AMSL DP 31:45:28 N 130:48:05 E DP 31:43:56 N 130:49:17 E DP 31:41:44 N 130:45:21 E DP 31:43:17 N 130:44:08 E DP 31:45:28 N 130:48:05 E AC C AN Kagoshima PCA-3 AL 1800 FT AMSL AH 6000 FT AMSL DP 31:43:56 N 130:49:17 E DP 31:42:16 N 130:50:34 E DP 31:40:04 N 130:46:38 E DP 31:43:17 N 130:44:08 E DP 31:43:56 N 130:49:17 E AC C AN Kagoshima PCA-4 AL 2500 FT AMSL AH 6000 FT AMSL DP 31:42:16 N 130:50:34 E V X=31:38:38 N 130:50:31 E DB 31:39:45 N 130:52:31 E,31:37.4187 N 130:48:36 E DP 31:37.4187 N 130:48:36 E DP 31:37:33 N 130:48:35 E DP 31:40:04 N 130:46:38 E DP 31:42:16 N 130:50:34 E AC C AN Kansai PCA-1 AL 2500 FT AMSL AH 5000 FT AMSL DP 34:38:24 N 135:12:15 E V X=34:37:58 N 135:13:26 E DB 34:38:15 N 135:19:30 E,34:33:02 N 135:12:28 E DP 34:33:02 N 135:12:28 E DP 34:33:06 N 135:12:06 E DP 34:38:24 N 135:12:15 E AC C AN Kansai PCA-2 AL 1500 FT AMSL AH 5000 FT AMSL DP 34:38:15 N 135:19:30 E DP 34:38:09 N 135:24:33 E DP 34:35:20 N 135:25:58 E DP 34:34:08 N 135:25:24 E DP 34:34:15 N 135:20:14 E DP 34:33:13 N 135:19:45 E DP 34:30:44 N 135:16:03 E DP 34:30:53 N 135:15.5374 E DP 34:30.9746 N 135:15.0078 E V D=- V X=34:26:03 N 135:13:58 E DB 34:30.9746 N 135:15.0078 E,34:30:47 N 135:12:01 E DP 34:30:47 N 135:12:01 E DP 34:33:06 N 135:12:06 E DP 34:33:01 N 135:12:38 E DP 34:32.9717 N 135:13.1719 E V X=34:37:58 N 135:13:26 E DB 34:32.9717 N 135:13.1719 E,34:38:15 N 135:19:30 E AC C AN Kansai PCA-3 AL 1000 FT AMSL AH 4000 FT AMSL DP 34:34:08 N 135:25:24 E DP 34:31:47 N 135:24:17 E DP 34:33:13 N 135:19:45 E DP 34:34:15 N 135:20:14 E DP 34:34:08 N 135:25:24 E AC C AN Kansai PCA-4 AL 700 FT AMSL AH 3000 FT AMSL DP 34:31:47 N 135:24:17 E DP 34:28:29 N 135:22:45 E V D=- V X=34:26:03 N 135:13:58 E DB 34:26:37 N 135:19:59 E,34:30:41 N 135:16:14 E DP 34:30:41 N 135:16:14 E DP 34:30:44 N 135:16:03 E DP 34:33:13 N 135:19:45 E DP 34:31:47 N 135:24:17 E AC C AN Kansai PCA-5 AL 700 FT AMSL AH 4000 FT AMSL DP 34:21:19 N 135:12:02 E DP 34:19:43 N 135:09:38 E DP 34:23:47 N 135:05:38 E V D=- V X=34:26:03 N 135:13:58 E DB 34:25:20 N 135:07:58 E,34:21:22 N 135:11:52 E DP 34:21:22 N 135:11:52 E DP 34:21:19 N 135:12:02 E AC C AN Kansai PCA-6 AL 1000 FT AMSL AH 5000 FT AMSL DP 34:19:43 N 135:09:38 E DP 34:18:27 N 135:07:45 E DP 34:22:31 N 135:03:45 E DP 34:23:47 N 135:05:38 E DP 34:19:43 N 135:09:38 E AC C AN Kansai PCA-7 AL 1500 FT AMSL AH 7000 FT AMSL DP 34:18:27 N 135:07:45 E DP 34:16:53 N 135:05:24 E DP 34:20:57 N 135:01:25 E DP 34:22:31 N 135:03:45 E DP 34:18:27 N 135:07:45 E AC C AN Kansai PCA-8 AL 2000 FT AMSL AH 7000 FT AMSL DP 34:16:53 N 135:05:24 E DP 34:14:49 N 135:02:19 E DP 34:18:53 N 134:58:20 E DP 34:20:57 N 135:01:25 E DP 34:16:53 N 135:05:24 E AC C AN Kobe PCA-1 AL 800 FT AMSL AH 4000 FT AMSL DP 34:39:31 N 135:07:40 E DP 34:39:16 N 135:07:34 E DP 34:38.8237 N 135:07:27 E V D=- V X=34:37:58 N 135:13:26 E DB 34:38.8237 N 135:07:27 E,34:35:23 N 135:08:14 E DP 34:35:23 N 135:08:14 E DP 34:35:08 N 135:05:15 E DP 34:39:18 N 135:04:45 E DP 34:39:31 N 135:07:40 E AC C AN Kobe PCA-2 AL 1200 FT AMSL AH 5000 FT AMSL DP 34:39:18 N 135:04:45 E DP 34:35:08 N 135:05:15 E DP 34:34:49 N 135:01:37 E DP 34:39:01 N 135:01:07 E DP 34:39:18 N 135:04:45 E AC C AN Kobe PCA-3 AL 1800 FT AMSL AH 5000 FT AMSL DP 34:39:01 N 135:01:07 E DP 34:34:49 N 135:01:37 E DP 34:34:37 N 134:59:12 E DP 34:38:50 N 134:58:42 E DP 34:39:01 N 135:01:07 E AC C AN Kobe PCA-4 AL 2500 FT AMSL AH 5000 FT AMSL DP 34:38:50 N 134:58:42 E DP 34:34:37 N 134:59:12 E V X=34:37:52 N 135:13:43 E DB 34:34:20 N 134:56:00 E,34:37:49 N 134:55:29 E DP 34:37:49 N 134:55:29 E DP 34:38:35 N 134:55:31 E DP 34:38:50 N 134:58:42 E AC C AN Misawa PCA-1 AL 2000 FT AMSL AH FL200 DP 40:59:10 N 141:20:47 E DP 40:53:10 N 141:29:47 E DP 40:51:51 N 141:29:47 E DP 40:49:10 N 141:24:47 E DP 40:49:10 N 141:07:17 E DP 40:59:10 N 141:07:17 E DP 40:59:10 N 141:20:47 E AC C AN Misawa PCA-2 AL FL200 AH FL230 DP 40:59:10 N 141:20:47 E DP 40:53:10 N 141:29:47 E DP 40:51:51 N 141:29:47 E DP 40:49:10 N 141:24:47 E DP 40:49:10 N 141:07:17 E DP 40:59:10 N 141:07:17 E DP 40:59:10 N 141:20:47 E AC C AN Miyazaki PCA AL 700 FT AMSL AH 2700 FT AMSL DP 31:56:04 N 131:31:12 E DP 31:57:06 N 131:43:52 E DP 31:51:06 N 131:44:30 E V D=- V X=31:52:38 N 131:26.9378 E DB 31:50:04 N 131:31:58 E,31:56:04 N 131:31:12 E AC C AN Nagoya PCA-1 AL 800 FT AMSL AH 4000 FT AMSL DP 35:11:03 N 137:00:57 E DP 35:08:24 N 137:02:38 E DP 35:06:33 N 136:58:18 E DP 35:09:13 N 136:56:37 E DP 35:11:03 N 137:00:57 E AC C AN Nagoya PCA-2 AL 1300 FT AMSL AH 5000 FT AMSL DP 35:08:24 N 137:02:38 E DP 35:05:31 N 137:04:26 E DP 35:5.27054 N 137:04:03 E DP 35:4.87325 N 137:3.30728 E V X=35:15:55 N 136:54:54 E DB 35:4.87325 N 137:3.30728 E,35:03:38 N 137:00:08 E DP 35:03:38 N 137:00:08 E DP 35:06:33 N 136:58:18 E DP 35:08:24 N 137:02:38 E AC C AN Naha PCA-1 AL 4000 FT AMSL AH 10000 FT AMSL DP 26:32:49 N 128:03:14 E DP 26:31:49 N 128:04:11 E DP 26:31:02 N 128:05:03 E V X=26:12:31 N 127:38:34 E DB 26:31:02 N 128:05:03 E,25:42:32 N 127:41:28 E DP 25:42:32 N 127:41:28 E V D=- V X=26:12:31 N 127:38:34 E DB 26:02:32 N 127:39:32 E,26:16:31 N 127:48:49 E DP 26:16:31 N 127:48:49 E DP 26:16:34 N 127:48:45 E DP 26:17:19 N 127:49:22 E DP 26:17.0684 N 127:48.9529 E DP 26:16:53 N 127:48:34 E DP 26:17.4554 N 127:48:16 E DP 26:18:00 N 127:47:54 E DP 26:18:31 N 127:47:30 E DP 26:19.0075 N 127:47.0554 E DP 26:19:17 N 127:46:47 E DP 26:32:49 N 128:03:14 E AC C AN Naha PCA-10 AL 2000 FT AMSL AH 10000 FT AMSL DP 26:33:48 N 128:02:10 E DP 26:31:46 N 127:59:39 E DP 26:30:40 N 128:00:38 E DP 26:23:00 N 127:51:18 E DP 26:23:25 N 127:51:07 E DP 26:23:49 N 127:50.8894 E V D=- V X=26:21:20 N 127:46:04 E DB 26:23:49 N 127:50.8894 E,26:24:59 N 127:42:17 E DP 26:24:59 N 127:42:17 E V X=26:12:31 N 127:38:34 E DB 26:30:55 N 127:44:03 E,26:26.4737 N 127:24:07 E DP 26:26.4737 N 127:24:07 E DP 26:25:59 N 127:23:36 E DP 26:15:35 N 127:35:09 E DP 26:15:52 N 127:35.5414 E DP 26:16.1013 N 127:35:58 E V D=+ V X=26:11:45 N 127:38:45 E DB 26:16.1013 N 127:35:58 E,26:15:20 N 127:42:40 E DP 26:15:20 N 127:42:40 E DP 26:14:29 N 127:41:25 E DP 26:12:41 N 127:44:13 E DP 26:12:15 N 127:44.322 E DP 26:11:48 N 127:44:21 E V X=26:11:45 N 127:38:45 E DB 26:11:48 N 127:44:21 E,26:07:11 N 127:36:25 E DP 26:07:11 N 127:36:25 E DP 25:53:40 N 127:30:59 E DP 25:53:22 N 127:31.921 E DP 25:53.1201 N 127:32:53 E V D=- V X=26:12:31 N 127:38:34 E DB 25:53.1201 N 127:32:53 E,25:52:32 N 127:40:30 E DP 25:52:32 N 127:40:30 E V D=+ V X=26:12:31 N 127:38:34 E DB 25:42:32 N 127:41:28 E,26:11.9184 N 127:05:02 E DP 26:11.9184 N 127:05:02 E DP 26:12:14 N 127:05:13 E DP 26:12:14 N 127:06:53 E V D=- V X=26:23:16 N 127:06:13 E DB 26:21:21 N 127:06:53 E,26:24:21 N 127:08:07 E DP 26:24:21 N 127:08:07 E DP 26:24:31 N 127:07:57 E DP 26:25:34 N 127:08:20 E DP 26:26:33 N 127:08:53 E V D=+ V X=26:12:31 N 127:38:34 E DB 26:26:33 N 127:08:53 E,26:42:25 N 127:34:53 E DP 26:42:25 N 127:34:53 E DP 26:40.2383 N 127:35:53 E DP 26:42:12 N 127:40:47 E DP 26:41:48 N 127:41:00 E DP 26:41:25 N 127:41.255 E V D=- V X=26:44:14 N 127:45.8865 E DB 26:41:25 N 127:41.255 E,26:40:48 N 127:49:58 E V D=+ V X=26:12:31 N 127:38:34 E DB 26:40:48 N 127:49:58 E,26:34.5555 N 128:1.40221 E DP 26:34.5555 N 128:1.40221 E DP 26:33:48 N 128:02:10 E AC C AN Naha PCA-2 AL 2000 FT AMSL AH 10000 FT AMSL DP 26:33:48 N 128:02:10 E DP 26:33.0188 N 128:3.02451 E DP 26:32:49 N 128:03:14 E DP 26:30:40 N 128:00:38 E DP 26:31:46 N 127:59:39 E DP 26:33:48 N 128:02:10 E AC C AN Naha PCA-3 AL 3000 FT AMSL AH 10000 FT AMSL DP 26:27:14 N 127:53.8867 E DP 26:29:14 N 127:51.8867 E DP 26:32:14 N 127:58.885 E DP 26:31:14 N 127:58.885 E DP 26:30:14 N 127:57.885 E DP 26:27:14 N 127:53.8867 E AC C AN Naha PCA-4 AL 3143 FT AMSL AH 10000 FT AMSL DP 26:23:00 N 127:51:18 E V X=26:12:31 N 127:38:34 E DB 26:19:17 N 127:46:47 E,26:17.2239 N 127:48:25 E DP 26:17.2239 N 127:48:25 E V X=26:21:20 N 127:46:04 E DB 26:16:53 N 127:48:34 E,26:23:25 N 127:51.1191 E DP 26:23:25 N 127:51.1191 E DP 26:23:00 N 127:51:18 E AC C AN Naha PCA-5 AL 2246 FT AMSL AH 10000 FT AMSL DP 26:17:19 N 127:49:22 E DP 26:12:06 N 127:45:08 E DP 26:14:29 N 127:41:25 E V D=- V X=26:21:20 N 127:46:04 E DB 26:16:33 N 127:44:28 E,26:17.2208 N 127:49:14 E DP 26:17.2208 N 127:49:14 E DP 26:17:19 N 127:49:22 E AC C AN Naha PCA-6 AL 1000 FT AMSL AH 10000 FT AMSL DP 26:16:34 N 127:48:45 E DP 26:16:00 N 127:49:03 E DP 26:15:24 N 127:49.2685 E V X=26:12:31 N 127:38:34 E DB 26:15:24 N 127:49.2685 E,26:02:32 N 127:39:32 E DP 26:02:32 N 127:39:32 E V D=- V X=26:11:45 N 127:38:45 E DB 26:06:44 N 127:39:08 E,26:12:16 N 127:44.3249 E DP 26:12:16 N 127:44.3249 E DP 26:12:41 N 127:44:13 E DP 26:12:06 N 127:45:08 E DP 26:16:34 N 127:48:45 E AC C AN Naha PCA-7 AL 1000 FT AMSL AH 10000 FT AMSL DP 26:16:33 N 127:44:28 E V D=- V X=26:11:49 N 127:38:48 E DB 26:15:20 N 127:42:40 E,26:16:41 N 127:39:48 E DP 26:16:41 N 127:39:48 E DP 26:19:53 N 127:40:46 E DP 26:19.4543 N 127:40.9039 E DP 26:19:03 N 127:41:07 E V X=26:21:20 N 127:46:04 E DB 26:19:03 N 127:41:07 E,26:16:33 N 127:44:28 E AC C AN Naha PCA-8 AL 700 FT AMSL AH 10000 FT AMSL V D=- V X=26:11:45 N 127:38:45 E DB 26:16:41 N 127:39:48 E,26:15.8533 N 127:35.5214 E DP 26:15.8533 N 127:35.5214 E DP 26:15:35 N 127:35:09 E DP 26:25:59 N 127:23:36 E DP 26:26:37 N 127:24:17 E DP 26:27:11 N 127:25:01 E V D=+ V X=26:12:31 N 127:38:34 E DB 26:27:11 N 127:25:01 E,26:30:55 N 127:44:03 E DP 26:30:55 N 127:44:03 E V D=- V X=26:21:20 N 127:46:04 E DB 26:24:59 N 127:42:17 E,26:20.0877 N 127:40.6851 E DP 26:20.0877 N 127:40.6851 E DP 26:19:53 N 127:40:46 E DP 26:16:41 N 127:39:48 E AC C AN Naha PCA-9 AL 700 FT AMSL AH 10000 FT AMSL DP 26:06:44 N 127:39:08 E V X=26:12:31 N 127:38:34 E DB 25:52:32 N 127:40:30 E,25:53:27 N 127:31:40 E DP 25:53:27 N 127:31:40 E DP 25:53:40 N 127:30:59 E DP 26:07:11 N 127:36:25 E DP 26:07:01 N 127:36:53 E DP 26:06:53 N 127:37.3547 E V D=- V X=26:11.7511 N 127:38:45 E DB 26:06:53 N 127:37.3547 E,26:06:44 N 127:39:08 E AC C AN Narita PCA-1 AL 700 FT AMSL AH 4000 FT AMSL V D=- V X=35:45:55 N 140:23:08 E DB 35:40:55 N 140:23:15 E,35:43:37 N 140:28:36 E DP 35:43:37 N 140:28:36 E DP 35:43:52 N 140:28:45 E DP 35:40:08 N 140:31:28 E DP 35:37:24 N 140:25:45 E DP 35:40:55 N 140:23:15 E AC C AN Narita PCA-2 AL 1500 FT AMSL AH 5000 FT AMSL DP 35:37:24 N 140:25:45 E DP 35:40:08 N 140:31:28 E DP 35:37:51 N 140:33:08 E DP 35:35:07 N 140:27:23 E DP 35:37:24 N 140:25:45 E AC C AN Narita PCA-3 AL 2000 FT AMSL AH 6000 FT AMSL DP 35:35:07 N 140:27:23 E DP 35:37:51 N 140:33:08 E DP 35:35:39 N 140:34:43 E DP 35:32:55 N 140:28:58 E DP 35:35:07 N 140:27:23 E AC C AN Narita PCA-4 AL 3000 FT AMSL AH 6000 FT AMSL DP 35:32:55 N 140:28:58 E DP 35:35:39 N 140:34:43 E DP 35:31:34 N 140:37:39 E DP 35:28:49 N 140:31:55 E DP 35:32:55 N 140:28:58 E AC C AN Narita PCA-5 AL 700 FT AMSL AH 6000 FT AMSL DP 35:52:38 N 140:22:25 E DP 35:49:57 N 140:16:47 E DP 35:51:30 N 140:15:39 E DP 35:52:09 N 140:17:02 E DP 35:53:19 N 140:16:11 E DP 35:55:21 N 140:20:26 E DP 35:52:38 N 140:22:25 E AC C AN Narita PCA-6 AL 1500 FT AMSL AH 6000 FT AMSL DP 35:51:30 N 140:15:39 E DP 35:55:04 N 140:13:08 E DP 35:57:43 N 140:18:43 E DP 35:55:21 N 140:20:26 E DP 35:53:19 N 140:16:11 E DP 35:52:09 N 140:17:02 E DP 35:51:30 N 140:15:39 E AC C AN Narita PCA-7 AL 2000 FT AMSL AH 6000 FT AMSL DP 35:55:04 N 140:13:08 E V D=- V X=36:2.07064 N 140:11.5688 E DB 35:57:05 N 140:11:41 E,36:00:23 N 140:17:23 E DP 36:00:23 N 140:17:23 E DP 35:59:50 N 140:19:45 E DP 35:58:37 N 140:20:38 E DP 35:55:04 N 140:13:08 E AC C AN Narita PCA-8 AL 3000 FT AMSL AH 6000 FT AMSL DP 35:57:05 N 140:11:41 E DP 36:01:17 N 140:08:38 E DP 36:03:15 N 140:12:47 E DP 36:03:17 N 140:17:34 E DP 36:02:26 N 140:21:13 E DP 35:57:33 N 140:24:46 E DP 35:52:38 N 140:22:25 E DP 35:57:43 N 140:18:43 E DP 35:58:37 N 140:20:38 E DP 35:59:50 N 140:19:45 E DP 36:00:23 N 140:17:23 E V X=36:02:03 N 140:11.5711 E DB 36:00:23 N 140:17:23 E,35:57:05 N 140:11:41 E AC C AN Osaka PCA-1 AL 700 FT AMSL AH 3000 FT AMSL DP 34:45:19 N 135:32:03 E DP 34:43:35 N 135:34:09 E DP 34:40:38 N 135:30:34 E DP 34:42:23 N 135:28:28 E DP 34:42:29 N 135:28:46 E DP 34:42.6749 N 135:29.2553 E V D=- V X=34:47:04 N 135:26:21 E DB 34:42.6749 N 135:29.2553 E,34:45:19 N 135:32:03 E AC C AN Osaka PCA-2 AL 1100 FT AMSL AH 4000 FT AMSL DP 34:43:35 N 135:34:09 E DP 34:42:50 N 135:35:04 E DP 34:39:53 N 135:31:28 E DP 34:40:38 N 135:30:34 E DP 34:43:35 N 135:34:09 E AC C AN Osaka PCA-3 AL 1300 FT AMSL AH 5000 FT AMSL DP 34:42:50 N 135:35:04 E DP 34:40:05 N 135:38:22 E DP 34:39.9704 N 135:38.3386 E DP 34:39.5682 N 135:38.1745 E V X=34:41:12 N 135:33:04 E DB 34:39.5682 N 135:38.1745 E,34:37:14 N 135:30:28 E DP 34:37:14 N 135:30:28 E DP 34:39:30 N 135:31:57 E DP 34:39:53 N 135:31:28 E DP 34:42:50 N 135:35:04 E AC C AN Osaka PCA-4 AL 3000 FT AMSL AH 5000 FT AMSL DP 34:40:05 N 135:38:22 E DP 34:36:39 N 135:42:30 E DP 34:36:37 N 135:42:29 E DP 34:36:07 N 135:42.0872 E V X=34:41:12 N 135:33:04 E DB 34:36:07 N 135:42.0872 E,34:33:17 N 135:27:52 E DP 34:33:17 N 135:27:52 E V D=- V X=34:41:12 N 135:33:04 E DB 34:37:14 N 135:30:28 E,34:39:41 N 135:38.2235 E DP 34:39:41 N 135:38.2235 E DP 34:40:05 N 135:38:22 E AC C AN Sendai PCA AL 700 FT AMSL AH 4000 FT AMSL DP 38:09:18 N 141:10:13 E DP 38:08:41 N 141:10.2695 E DP 38:07:59 N 141:10:16 E V X=38:08:23 N 140:55:01 E DB 38:07:59 N 141:10:16 E,37:57:01 N 140:59:54 E DP 37:57:01 N 140:59:54 E DP 38:03:24 N 140:55:14 E DP 38:3.42323 N 140:55:48 E DP 38:03:30 N 140:56:22 E V D=- V X=38:08:23 N 140:55:01 E DB 38:03:30 N 140:56:22 E,38:10:52 N 141:00:32 E DP 38:10:52 N 141:00:32 E DP 38:11:15 N 141:04:22 E DP 38:09:18 N 141:10:13 E AC C AN Takamatsu PCA-1 AL 1000 FT AMSL AH 4500 FT AMSL DP 34:16:07 N 134:05:31 E DP 34:17:42 N 134:11:47 E DP 34:13:52 N 134:13:13 E V D=- V X=34:12:51 N 134:00:56 E DB 34:12:17 N 134:06:57 E,34:16.041 N 134:5.60208 E DP 34:16.041 N 134:5.60208 E DP 34:16:07 N 134:05:31 E AC C AN Takamatsu PCA-2 AL 2500 FT AMSL AH 4500 FT AMSL DP 34:17:42 N 134:11:47 E DP 34:19:11 N 134:17:34 E DP 34:15:21 N 134:19:00 E DP 34:13:52 N 134:13:13 E DP 34:17:42 N 134:11:47 E AC C AN Tokyo INTL PCA-1 AL 3000 FT AMSL AH 4000 FT AMSL V X=35:33:12 N 139:46:52 E DC 5 AC C AN Tokyo INTL PCA-10 AL 1000 FT AMSL AH 5000 FT AMSL DP 35:28:25 N 139:53:58 E DP 35:26:15 N 139:55:31 E DP 35:23:47 N 139:50:18 E DP 35:25:57 N 139:48:45 E DP 35:28:25 N 139:53:58 E AC C AN Tokyo INTL PCA-11 AL 1500 FT AMSL AH 6000 FT AMSL DP 35:26:15 N 139:55:31 E DP 35:24:56 N 139:56:27 E DP 35:22:28 N 139:51:14 E DP 35:23:47 N 139:50:18 E DP 35:26:15 N 139:55:31 E AC C AN Tokyo INTL PCA-12 AL 2000 FT AMSL AH 6000 FT AMSL DP 35:24:56 N 139:56:27 E DP 35:22:25 N 139:58:14 E DP 35:19:57 N 139:53:00 E DP 35:22:28 N 139:51:14 E DP 35:24:56 N 139:56:27 E AC C AN Tokyo INTL PCA-13 AL 2500 FT AMSL AH 6000 FT AMSL DP 35:22:25 N 139:58:14 E DP 35:20:48 N 139:59:23 E DP 35:18:20 N 139:54:09 E DP 35:19:57 N 139:53:00 E DP 35:22:25 N 139:58:14 E AC C AN Tokyo INTL PCA-14 AL 3000 FT AMSL AH 6000 FT AMSL DP 35:20:48 N 139:59:23 E DP 35:19:04 N 140:00:36 E DP 35:16:36 N 139:55:22 E DP 35:18:20 N 139:54:09 E DP 35:20:48 N 139:59:23 E AC C AN Tokyo INTL PCA-2 AL 700 FT AMSL AH 4000 FT AMSL DP 35:40:02 N 139:48:46 E DP 35:37:58 N 139:52:35 E DP 35:35:09 N 139:56:05 E DP 35:32:15 N 139:56:06 E V D=- V X=35:33.2197 N 139:46.8715 E DB 35:32:13 N 139:52:53 E,35:38:11 N 139:47:11 E DP 35:38:11 N 139:47:11 E DP 35:40:02 N 139:48:46 E AC C AN Tokyo INTL PCA-3 AL 1000 FT AMSL AH 5000 FT AMSL DP 35:42:09 N 139:50:37 E DP 35:39:49 N 139:54:50 E DP 35:37:01 N 139:58:21 E DP 35:32:15 N 139:58:22 E DP 35:32:15 N 139:56:06 E DP 35:35:09 N 139:56:05 E DP 35:37:58 N 139:52:35 E DP 35:40:02 N 139:48:46 E DP 35:42:09 N 139:50:37 E AC C AN Tokyo INTL PCA-4 AL 1500 FT AMSL AH 6000 FT AMSL DP 35:43:37 N 139:51:53 E DP 35:41:05 N 139:56:23 E DP 35:38:17 N 139:59:53 E DP 35:32:16 N 139:59:55 E DP 35:32:15 N 139:58:22 E DP 35:37:01 N 139:58:21 E DP 35:39:49 N 139:54:50 E DP 35:42:09 N 139:50:37 E DP 35:43:37 N 139:51:53 E AC C AN Tokyo INTL PCA-5 AL 2000 FT AMSL AH 6000 FT AMSL DP 35:45:46 N 139:53:44 E DP 35:42:57 N 139:58:39 E DP 35:40:09 N 140:02:09 E DP 35:32:17 N 140:02:12 E DP 35:32:16 N 139:59:55 E DP 35:38:17 N 139:59:53 E DP 35:41:05 N 139:56:23 E DP 35:43:37 N 139:51:53 E DP 35:45:46 N 139:53:44 E AC C AN Tokyo INTL PCA-6 AL 2500 FT AMSL AH 6000 FT AMSL DP 35:46:10 N 139:54:04 E DP 35:45:23 N 139:55:26 E DP 35:45:55 N 139:57:33 E DP 35:45:02 N 139:59:05 E DP 35:38:18 N 140:04:41 E DP 35:32:17 N 140:04:44 E DP 35:32:17 N 140:02:12 E DP 35:40:09 N 140:02:09 E DP 35:42:57 N 139:58:39 E DP 35:45:46 N 139:53:44 E DP 35:46:10 N 139:54:04 E AC C AN Tokyo INTL PCA-7 AL 3000 FT AMSL AH 6000 FT AMSL DP 35:46:40 N 140:00:57 E DP 35:46:00 N 140:02:16 E DP 35:43:12 N 140:05:47 E DP 35:38:18 N 140:07:08 E DP 35:32:18 N 140:07:11 E DP 35:32:17 N 140:04:44 E DP 35:38:18 N 140:04:41 E DP 35:45:02 N 139:59:05 E DP 35:45:55 N 139:57:33 E DP 35:46:40 N 140:00:57 E AC C AN Tokyo INTL PCA-8 AL 3500 FT AMSL AH 6000 FT AMSL DP 35:48:57 N 139:56:29 E DP 35:46:40 N 140:00:57 E DP 35:45:23 N 139:55:26 E DP 35:46:10 N 139:54:04 E DP 35:48:57 N 139:56:29 E AC C AN Tokyo INTL PCA-9 AL 700 FT AMSL AH 4000 FT AMSL DP 35:30:49 N 139:52:16 E DP 35:28:25 N 139:53:58 E DP 35:25:57 N 139:48:45 E V D=- V X=35:33:12 N 139:46:52 E DB 35:28:12 N 139:47:09 E,35:30:26 N 139:51.99 E DP 35:30:26 N 139:51.99 E DP 35:30:49 N 139:52:16 E AC D AN Aguni INFO ZONE-1 AL GND AH 3000 FT AMSL V D=- V X=26:12:31 N 127:38:34 E DB 26:37:19 N 127:19:39 E,26:31:23 N 127:12:29 E DP 26:31:23 N 127:12:29 E DP 26:30:58 N 127:12:11 E DP 26:31:10 N 127:11:44 E V D=+ V X=26:35:34 N 127:14:25 E DB 26:31:10 N 127:11:44 E,26:37:24 N 127:19.6388 E DP 26:37:24 N 127:19.6388 E DP 26:37:19 N 127:19:39 E AC D AN Aguni INFO ZONE-2 AL GND AH 2000 FT AMSL DP 26:37:19 N 127:19:39 E DP 26:37.2411 N 127:19.7038 E DP 26:36:49 N 127:19:51 E V X=26:35:34 N 127:14:25 E DB 26:36:49 N 127:19:51 E,26:30:58 N 127:12:11 E DP 26:30:58 N 127:12:11 E DP 26:31:23 N 127:12:29 E DP 26:32.2235 N 127:13.2687 E V X=26:12:31 N 127:38:34 E DB 26:32.2235 N 127:13.2687 E,26:37:19 N 127:19:39 E AC D AN Akeno CTR AL GND AH 2500 FT AMSL V X=34:32:00 N 136:40:20 E DC 5 AC D AN Akita CTR AL GND AH 3000 FT AMSL V X=39:36:56 N 140:13:07 E DC 5 AC D AN Amami INFO ZONE AL GND AH 3000 FT AMSL V X=28:25:51 N 129:42:45 E DC 5 AC D AN Aomori CTR AL GND AH 4000 FT AMSL V X=40:44:00 N 140:41:19 E DC 5 AC D AN Asahikawa Civil CTR AL GND AH 4000 FT AMSL V X=43:40:15 N 142:26:51 E DB 43:45:12 N 142:27:54 E,43:42:24 N 142:20:36 E DP 43:42:24 N 142:20:36 E DP 43:42:43 N 142:20:52 E DP 43:45:12 N 142:27:54 E AC D AN Asahikawa Mil CTR AL GND AH 3000 FT AMSL DP 43:45:12 N 142:27:54 E V X=43:47:40 N 142:21:54 E DB 43:42:43 N 142:20:52 E,43:45.5878 N 142:28.207 E DP 43:45.5878 N 142:28.207 E DP 43:45:12 N 142:27:54 E AC D AN Ashiya CTR-1 AL GND AH 6000 FT AMSL DP 33:50:46 N 130:44:33 E V X=33:52:53 N 130:39:06 E DB 33:48:25 N 130:36:13 E,33:51.1517 N 130:44.8364 E DP 33:51.1517 N 130:44.8364 E DP 33:50:46 N 130:44:33 E AC D AN Ashiya CTR-2 AL GND AH 6000 FT AMSL DP 33:50:46 N 130:44:33 E DP 33:50.3374 N 130:44:23 E DP 33:49:58 N 130:44.0845 E V X=33:52:53 N 130:39:06 E DB 33:49:58 N 130:44.0845 E,33:48:25 N 130:36:13 E DP 33:48:25 N 130:36:13 E DP 33:50:46 N 130:44:33 E AC D AN Atsugi CTR-1 AL 1700 FT AMSL AH 6000 FT AMSL DP 35:31:58 N 139:24:51 E DP 35:30:30 N 139:24:51 E V X=35:30.4699 N 139:24.7911 E DB 35:28:12 N 139:22:29 E,35:29:23 N 139:21:26 E DP 35:29:23 N 139:21:26 E DP 35:29.6692 N 139:21.6047 E DP 35:30.0521 N 139:21.8877 E V X=35:27:17 N 139:27:00 E DB 35:30.0521 N 139:21.8877 E,35:31:58 N 139:24:51 E AC D AN Atsugi CTR-2 AL GND AH 6000 FT AMSL V X=35:27.2854 N 139:27:00 E DB 35:31:58 N 139:24:51 E,35:29:23 N 139:21:26 E DP 35:29:23 N 139:21:26 E DP 35:29:18 N 139:21.4725 E DP 35:28.9904 N 139:21:40 E DP 35:28.7019 N 139:21:54 E DP 35:28.4372 N 139:22.1737 E DP 35:28:12 N 139:22:29 E DP 35:30:30 N 139:24:51 E DP 35:31:58 N 139:24:51 E AC D AN Chitose CTR AL GND AH 6000 FT AMSL V X=42:47:40 N 141:39:59 E DC 5 AC D AN Chubu Centrair INTL CTR AL GND AH 3000 FT AMSL V X=34:51:30 N 136:48:19 E DC 5 AC D AN Fukue INFO ZONE AL GND AH 3000 FT AMSL V X=32:39:59 N 128:49:58 E DC 5 AC D AN Fukui INFO ZONE AL GND AH 3000 FT AMSL V X=36:08:34 N 136:13:26 E DC 5 AC D AN Fukuoka CTR AL GND AH 3000 FT AMSL DP 33:40:00 N 130:26:28 E DP 33:40:00 N 130:26:32 E DP 33:40.025 N 130:27:04 E V X=33:35:04 N 130:27:06 E DB 33:40.025 N 130:27:04 E,33:38:00 N 130:22:18 E DP 33:38:00 N 130:22:18 E DP 33:40:52 N 130:20:20 E DP 33:42:52 N 130:24:30 E DP 33:40:00 N 130:26:28 E AC D AN Fukushima INFO ZONE AL GND AH 4000 FT AMSL V X=37:13:39 N 140:25:41 E DC 5 AC D AN Futenma CTR AL GND AH 2246 FT AMSL DP 26:14:29 N 127:41:25 E DP 26:17:08 N 127:45:19 E DP 26:17:17 N 127:45:51 E DP 26:19:05 N 127:49:12 E DP 26:19:04 N 127:50:47 E DP 26:12:06 N 127:45:08 E DP 26:14:29 N 127:41:25 E AC D AN Gifu CTR AL GND AH 6000 FT AMSL V D=- V X=35:15:18 N 136:55:28 E DB 35:20:13 N 136:56:36 E,35:19.0679 N 136:51.4346 E DP 35:19.0679 N 136:51.4346 E V D=+ V X=35:23:40 N 136:52.1726 E DB 35:18:45 N 136:51:03 E,35:20:13 N 136:56:36 E AC D AN Hachijojima INFO ZONE AL GND AH 3000 FT AMSL V X=33:06:54 N 139:47:09 E DC 5 AC D AN Hachinohe CTR AL GND AH 6000 FT AMSL V X=40:33:07 N 141:28:02 E DC 5 AC D AN Hakodate CTR AL GND AH 3000 FT AMSL V X=41:46:12 N 140:49:19 E DC 5 AC D AN Hamamatsu CTR AL GND AH 4000 FT AMSL V X=34:45:01 N 137:42:11 E DC 5 AC D AN Hanamaki INFO ZONE AL GND AH 3000 FT AMSL V X=39:25:43 N 141:08:07 E DC 5 AC D AN Hiroshima CTR AL GND AH 4000 FT AMSL V X=34:26:10 N 132:55:10 E DC 5 AC D AN Hofu CTR AL GND AH 4000 FT AMSL V X=34:02:04 N 131:32:47 E DC 5 AC D AN Hyakuri CTR-1 AL GND AH 3000 FT AMSL DP 36:15:53 N 140:24:33 E V X=36:10:54 N 140:24:53 E DB 36:06:00 N 140:23:39 E,36:15:51 N 140:24:00 E DP 36:15:51 N 140:24:00 E DP 36:15:53 N 140:24:33 E AC D AN Hyakuri CTR-2 AL GND AH 6000 FT AMSL DP 36:15:53 N 140:24:33 E DP 36:15:54 N 140:25.1037 E DP 36:15:52 N 140:25.6562 E V X=36:10:54 N 140:24:53 E DB 36:15:52 N 140:25.6562 E,36:06:00 N 140:23:39 E DP 36:06:00 N 140:23:39 E DP 36:15:53 N 140:24:33 E AC D AN Iki INFO ZONE AL GND AH 3000 FT AMSL V X=33:44:57 N 129:47:09 E DC 5 AC D AN Iruma CTR AL GND AH 6000 FT AMSL DP 35:46:26 N 139:28:12 E DP 35:46:40 N 139:21:49 E DP 35:54:07 N 139:20:22 E DP 35:54:22 N 139:20.6872 E DP 35:54.636 N 139:21:08 E V X=35:50:31 N 139:24:38 E DB 35:54.636 N 139:21:08 E,35:46:26 N 139:28:12 E AC D AN Iwakuni ATA AL GND AH 3000 FT AMSL V X=34:08:42 N 132:14:49 E DC 5 AC D AN Iwami INFO ZONE AL GND AH 3000 FT AMSL V X=34:40:35 N 131:47:25 E DC 5 AC D AN Iwoto CTR AL GND AH 5000 FT AMSL V X=24:47:03 N 141:19:22 E DC 5 AC D AN Izumo INFO ZONE AL GND AH 3000 FT AMSL V X=35:24:49 N 132:53:24 E DC 5 AC D AN Kadena CTR-1 AL GND AH 3143 FT AMSL V X=26:21:20 N 127:46:04 E DB 26:16:32 N 127:44:26 E,26:17:29 N 127:49.6511 E DP 26:17:29 N 127:49.6511 E DP 26:17:14 N 127:49:14 E DP 26:19:04 N 127:50:47 E DP 26:19:05 N 127:49:12 E DP 26:17:17 N 127:45:51 E DP 26:17:08 N 127:45:19 E DP 26:16:32 N 127:44:26 E AC D AN Kadena CTR-2 AL 2246 FT AMSL AH 3143 FT AMSL DP 26:16:32 N 127:44:26 E DP 26:17:08 N 127:45:19 E DP 26:17:17 N 127:45:51 E DP 26:19:05 N 127:49:12 E DP 26:19:04 N 127:50:47 E DP 26:17:14 N 127:49:14 E DP 26:16.9691 N 127:48:50 E V X=26:21:20 N 127:46:04 E DB 26:16.9691 N 127:48:50 E,26:16:32 N 127:44:26 E AC D AN Kagoshima CTR AL GND AH 3000 FT AMSL V X=31:48:12 N 130:43:10 E DC 5 AC D AN Kanazawa-Komatsu CTR AL GND AH 6000 FT AMSL V X=36:23:38 N 136:24:27 E DC 5 AC D AN Kanoya CTR-1 AL GND AH 5000 FT AMSL V X=31:22:05 N 130:50:17 E DC 5 AC D AN Kanoya CTR-2 AL 5000 FT AMSL AH 6000 FT AMSL V X=31:22:05 N 130:50:17 E DB 31:26:47 N 130:52:18 E,31:17.1409 N 130:49.3583 E DP 31:17.1409 N 130:49.3583 E DP 31:17:11 N 130:49:06 E DP 31:25:29 N 130:46:00 E DP 31:25:33 N 130:46:03 E DP 31:26:47 N 130:52:18 E AC D AN Kansai CTR AL GND AH 3000 FT AMSL V X=34:26:03 N 135:13:58 E DC 5 AC D AN Kasumigaura CTR AL GND AH 3000 FT AMSL V X=36:02:05 N 140:11:34 E DC 5 AC D AN Kikaigashima INFO ZONE AL GND AH 3000 FT AMSL V X=28:19:17 N 129:55:41 E DC 5 AC D AN Kitadaito INFO ZONE AL GND AH 3000 FT AMSL DP 25:55:36 N 131:14:12 E DP 25:56.0353 N 131:14.0861 E DP 25:56:29 N 131:14:03 E V X=25:56:41 N 131:19:37 E DB 25:56:29 N 131:14:03 E,25:51:53 N 131:21:14 E DP 25:51:53 N 131:21:14 E DP 25:55:36 N 131:14:12 E AC D AN Kitakyushu CTR AL GND AH 3000 FT AMSL DP 33:45:53 N 131:00:37 E DP 33:46.0054 N 131:00:06 E DP 33:46.1725 N 130:59:36 E V X=33:50:44 N 131:02:06 E DB 33:46.1725 N 130:59:36 E,33:45:57 N 131:03:54 E DP 33:45:57 N 131:03:54 E DP 33:46:03 N 131:03:23 E DP 33:46:06 N 131:2.84045 E V D=- V X=33:41:06 N 131:02:25 E DB 33:46:06 N 131:2.84045 E,33:45:53 N 131:00:37 E AC D AN Kobe CTR-1 AL GND AH 2000 FT AMSL DP 34:41:20 N 135:17:56 E V X=34:37.9715 N 135:13:26 E DB 34:40:35 N 135:08:15 E,34:41:20 N 135:17:56 E AC D AN Kobe CTR-2 AL GND AH 2500 FT AMSL V X=34:37.9686 N 135:13:26 E DB 34:41:20 N 135:17:56 E,34:40:35 N 135:08:15 E DP 34:40:35 N 135:08:15 E DP 34:41:20 N 135:17:56 E AC D AN Kochi CTR AL GND AH 3000 FT AMSL V X=33:32:46 N 133:40:10 E DC 5 AC D AN Komatsushima CTR AL GND AH 3000 FT AMSL V D=- V X=34:07:56 N 134:36:33 E DB 34:03:06 N 134:33:13 E,34:03:46 N 134:41.0028 E DP 34:03:46 N 134:41.0028 E V D=+ V X=34:00:19 N 134:37:35 E DB 34:04:29 N 134:40:55 E,34:03:00 N 134:32:30 E DP 34:03:00 N 134:32:30 E DP 34:03:06 N 134:33:13 E AC D AN Kozushima INFO ZONE AL GND AH 3000 FT AMSL V X=34:11:22 N 139:08:01 E DC 5 AC D AN Kumamoto CTR AL GND AH 3000 FT AMSL V X=32:50:14 N 130:51:19 E DC 5 AC D AN Kumejima INFO ZONE AL GND AH 3000 FT AMSL DP 26:23:54 N 126:47:54 E DP 26:19:45 N 126:47:54 E DP 26:19.49 N 126:47:46 E DP 26:19.1045 N 126:47:31 E V X=26:21:49 N 126:42:50 E DB 26:19.1045 N 126:47:31 E,26:23:54 N 126:47:54 E AC D AN Kushiro CTR AL GND AH 3000 FT AMSL V X=43:02:27 N 144:11:35 E DC 5 AC D AN Maizuru CTR AL GND AH 4000 FT AMSL V X=35:29:25 N 135:22:38 E DC 4 AC D AN Matsumoto INFO ZONE AL GND AH 5000 FT AMSL V X=36:10:00 N 137:55:22 E DC 5 AC D AN Matsushima CTR AL GND AH 5000 FT AMSL V X=38:24:11 N 141:12:43 E DC 5 AC D AN Matsuyama CTR AL GND AH 3000 FT AMSL V X=33:49:38 N 132:41:59 E DC 5 AC D AN Memambetsu CTR AL GND AH 3000 FT AMSL V X=43:52:50 N 144:09:51 E DC 5 AC D AN Metabaru CTR AL GND AH 3000 FT AMSL V X=33:19:31 N 130:24:49 E DC 5 AC D AN Miho CTR AL GND AH 3500 FT AMSL V X=35:29:36 N 133:14:21 E DC 5 AC D AN Minamidaito INFO ZONE AL GND AH 3000 FT AMSL DP 25:55:36 N 131:14:12 E DP 25:51:53 N 131:21:14 E DP 25:51.4737 N 131:21.3394 E DP 25:51:02 N 131:21:23 E V X=25:50:48 N 131:15:49 E DB 25:51:02 N 131:21:23 E,25:55:36 N 131:14:12 E AC D AN Misawa CTR AL GND AH 6000 FT AMSL V X=40:42:11 N 141:22:06 E DC 5 AC D AN Miyagi CTR AL GND AH 5000 FT AMSL DP 38:12:16 N 141:01:20 E V X=38:14:08 N 140:55:23 E DB 38:12:36 N 140:49:17 E,38:12:16 N 141:01:20 E AC D AN Miyakejima INFO ZONE AL GND AH 3000 FT AMSL V X=34:04:25 N 139:33:37 E DC 5 AC D AN Miyako AL GND AH 3000 FT AMSL V X=24:46:58 N 125:17:42 E DC 5 AC D AN Miyazaki CTR AL GND AH 3000 FT AMSL V X=31:52:38 N 131:26:55 E DC 5 AC D AN Monbetsu INFO ZONE AL GND AH 3000 FT AMSL V X=44:18:15 N 143:24:15 E DC 5 AC D AN Nagasaki CTR AL GND AH 3000 FT AMSL V X=32:55:01 N 129:54:49 E DC 5 AC D AN Nagoya CTR AL GND AH 3000 FT AMSL DP 35:11:03 N 137:00:57 E DP 35:09:13 N 136:56:37 E V X=35:15:18 N 136:55:28 E DB 35:10:19 N 136:55:56 E,35:12:10 N 137:00:14 E DP 35:12:10 N 137:00:14 E DP 35:11:03 N 137:00:57 E AC D AN Naha CTR-1 AL GND AH 2000 FT AMSL DP 26:15:19 N 127:42:39 E DP 26:14:29 N 127:41:25 E V X=26:11:45 N 127:38:45 E DB 26:12:42 N 127:44:13 E,26:15:19 N 127:42:39 E AC D AN Naha CTR-2 AL GND AH 700 FT AMSL V D=- V X=26:11:45 N 127:38:45 E DB 26:16:41 N 127:39:48 E,26:15.8533 N 127:35.5214 E DP 26:15.8533 N 127:35.5214 E DP 26:15:35 N 127:35:09 E DP 26:25:59 N 127:23:36 E DP 26:26:37 N 127:24:17 E DP 26:27:11 N 127:25:01 E V D=+ V X=26:12:31 N 127:38:34 E DB 26:27:11 N 127:25:01 E,26:30:55 N 127:44:03 E DP 26:30:55 N 127:44:03 E V D=- V X=26:21:20 N 127:46:04 E DB 26:24:59 N 127:42:17 E,26:20.0877 N 127:40.6851 E DP 26:20.0877 N 127:40.6851 E DP 26:19:53 N 127:40:46 E DP 26:16:41 N 127:39:48 E AC D AN Nakashibetsu INFO ZONE AL GND AH 3000 FT AMSL V X=43:34:39 N 144:57:36 E DC 5 AC D AN Nankishirahama INFO ZONE AL GND AH 3000 FT AMSL V X=33:39:44 N 135:21:52 E DC 5 AC D AN Narita CTR AL GND AH 3000 FT AMSL DP 35:48:26 N 140:17:49 E DP 35:49:57 N 140:16:47 E DP 35:52:38 N 140:22:25 E V X=35:45:55 N 140:23:08 E DB 35:50:54 N 140:23:41 E,35:48:03 N 140:17:33 E DP 35:48:03 N 140:17:33 E DP 35:48:26 N 140:17:49 E AC D AN New Chitose CTR AL GND AH 3000 FT AMSL V X=42:46:31 N 141:41:33 E DB 42:50:35 N 141:45:30 E,42:43.3227 N 141:36.3229 E DP 42:43.3227 N 141:36.3229 E V D=- V X=42:47:40 N 141:39:59 E DB 42:43:36 N 141:36:03 E,42:50:35 N 141:45:30 E AC D AN New Ishigaki CTR AL GND AH 3000 FT AMSL V X=24:23:47 N 124:14:42 E DC 5 AC D AN Niigata CTR AL GND AH 3000 FT AMSL V X=37:57:21 N 139:06:42 E DC 5 AC D AN Niijima INFO ZONE AL GND AH 3000 FT AMSL V X=34:22:10 N 139:16:07 E DC 5 AC D AN Noto INFO ZONE AL GND AH 4000 FT AMSL V X=37:17:36 N 136:57:44 E DC 5 AC D AN Nyutabaru INFO ZONE AL GND AH 6000 FT AMSL V X=32:05:01 N 131:27:05 E DC 5 AC D AN Obihiro CTR AL GND AH 3000 FT AMSL V X=42:44:00 N 143:13:02 E DC 5 AC D AN Odate-Noshiro INFO ZONE AL GND AH 3000 FT AMSL V X=40:11:31 N 140:22:18 E DC 5 AC D AN Oita CTR AL GND AH 3000 FT AMSL V X=33:28:46 N 131:44:14 E DC 5 AC D AN Okayama CTR AL GND AH 3000 FT AMSL V X=34:45:25 N 133:51:19 E DC 5 AC D AN Okierabu INFO ZONE AL GND AH 3000 FT AMSL V X=27:25:54 N 128:42:20 E DC 5 AC D AN Oki INFO ZONE AL GND AH 3000 FT AMSL V X=36:10:42 N 133:19:24 E DC 5 AC D AN Ominato CTR AL GND AH 3000 FT AMSL V X=41:13:58 N 141:07:56 E DC 5 AC D AN Osaka CTR AL GND AH 3000 FT AMSL V X=34:47:04 N 135:26:21 E DC 5 AC D AN Osaka-Yao CTR-1 AL GND AH 1300 FT AMSL V X=34:35:48 N 135:36:02 E DC 5 AC D AN Osaka-Yao CTR-2 AL 1300 FT AMSL AH 2000 FT AMSL V X=34:35.8014 N 135:36.0247 E DB 34:40:23 N 135:38:27 E,34:37:21 N 135:30:16 E DP 34:37:21 N 135:30:16 E DP 34:37.2404 N 135:30:28 E DP 34:37.0565 N 135:30:56 E V D=- V X=34:41:12 N 135:33:04 E DB 34:37.0565 N 135:30:56 E,34:40:23 N 135:38:27 E AC D AN Oshima INFO ZONE AL GND AH 3000 FT AMSL V X=34:46:55 N 139:21:37 E DC 5 AC D AN Ozuki CTR AL GND AH 5000 FT AMSL V X=34:02:49 N 131:03:08 E DC 5 AC D AN Rishiri INFO ZONE AL GND AH 3000 FT AMSL V X=45:14:31 N 141:11:15 E DC 5 AC D AN Saga INFO ZONE AL GND AH 3000 FT AMSL V X=33:08:59 N 130:18:08 E DC 5 AC D AN Sapporo Okadama CTR AL GND AH 4000 FT AMSL V X=43:07:03 N 141:22:53 E DC 5 AC D AN Sendai CTR AL GND AH 3000 FT AMSL V X=38:8.38839 N 140:55.0235 E DB 38:12:18 N 140:58:57 E,38:12:32 N 140:51:29 E DP 38:12:32 N 140:51:29 E DP 38:12:18 N 140:58:57 E AC D AN Shimofusa CTR-1 AL GND AH 3500 FT AMSL DP 35:48:04 N 140:06:54 E DP 35:45:23 N 139:55:26 E DP 35:45.7047 N 139:55:13 E DP 35:46:07 N 139:54.9882 E V X=35:47:56 N 140:00:44 E DB 35:46:07 N 139:54.9882 E,35:48:04 N 140:06:54 E AC D AN Shimofusa CTR-2 AL GND AH 2000 FT AMSL V X=35:47:56 N 140:00:44 E DB 35:48:04 N 140:06:54 E,35:45.2044 N 139:55:34 E DP 35:45.2044 N 139:55:34 E DP 35:45:23 N 139:55:26 E DP 35:48:04 N 140:06:54 E AC D AN Shimojishima CTR AL GND AH 3000 FT AMSL V D=- V X=24:46:58 N 125:17:42 E DB 24:50:43 N 125:14:03 E,24:46.2874 N 125:12.2398 E DP 24:46.2874 N 125:12.2398 E DP 24:45:52 N 125:12:21 E DP 24:45.5844 N 125:11.9682 E V D=+ V X=24:49:36 N 125:08:41 E DB 24:45.5844 N 125:11.9682 E,24:50:52 N 125:14:01 E DP 24:50:52 N 125:14:01 E DP 24:50:43 N 125:14:03 E AC D AN Shizuoka INFO ZONE AL GND AH 3000 FT AMSL V X=34:47:46 N 138:11:22 E DB 34:46:50 N 138:17:21 E,34:44.0551 N 138:7.28519 E DP 34:44.0551 N 138:7.28519 E DP 34:44:23 N 138:06:55 E DP 34:44.8848 N 138:6.92499 E V D=- V X=34:44:50 N 137:42:36 E DB 34:44.8848 N 138:6.92499 E,34:50:11 N 138:06:03 E DP 34:50:11 N 138:06:03 E DP 34:50:29 N 138:06:16 E DP 34:46:50 N 138:17:21 E AC D AN Shonai INFO ZONE AL GND AH 3000 FT AMSL V X=38:48:44 N 139:47:14 E DC 5 AC D AN Soumagahara CTR AL GND AH 4000 FT AMSL V X=36:26:05 N 138:57:11 E DB 36:31:01 N 138:56:06 E,36:25:46 N 138:50.9694 E DP 36:25:46 N 138:50.9694 E DP 36:26:05 N 138:50:59 E DP 36:26:05 N 138:53:28 E DP 36:26:26 N 138:53:28 E DP 36:26.7713 N 138:53.5378 E V X=36:26:05 N 138:57:11 E DB 36:26.7713 N 138:53.5378 E,36:29:03 N 138:56:32 E DP 36:29:03 N 138:56:32 E DP 36:31:01 N 138:56:06 E AC D AN Tachikawa CTR AL GND AH 3000 FT AMSL DP 35:46:26 N 139:28:12 E V X=35:42:39 N 139:24:11 E DB 35:38:45 N 139:28:01 E,35:37:41 N 139:23:35 E DP 35:37:41 N 139:23:35 E DP 35:46:40 N 139:21:49 E DP 35:46:26 N 139:28:12 E AC D AN Takamatsu CTR AL GND AH 3000 FT AMSL V X=34:12:51 N 134:00:56 E DC 5 AC D AN Tanegashima INFO ZONE AL GND AH 3000 FT AMSL V X=30:36:18 N 130:59:30 E DC 5 AC D AN Tarama INFO ZONE AL GND AH 3000 FT AMSL V X=24:39:14 N 124:40:31 E DC 5 AC D AN Tateyama CTR AL GND AH 2000 FT AMSL V X=34:59:15 N 139:49:55 E DC 5 AC D AN Tokachi CTR AL GND AH 1500 FT AMSL V X=42:53:25 N 143:09:30 E DC 5 AC D AN Tokunoshima INFO ZONE AL GND AH 3000 FT AMSL V X=27:50:11 N 128:52:53 E DC 5 AC D AN Tokushima CTR AL GND AH 5000 FT AMSL V X=34:07:56 N 134:36:33 E DC 5 AC D AN Tokyo INTL Haneda CTR AL GND AH 3000 FT AMSL V X=35:33:12 N 139:46:52 E DC 5 AC D AN Tottori INFO ZONE AL GND AH 3000 FT AMSL V X=35:31:48 N 134:09:54 E DC 5 AC D AN Toyama CTR AL GND AH 3000 FT AMSL V X=36:38:54 N 137:11:15 E DC 5 AC D AN Tsuiki CTR-1 AL GND AH 4000 FT AMSL DP 33:44:19 N 130:57:50 E DP 33:44.6581 N 130:58:11 E DP 33:44:58 N 130:58:35 E V X=33:41:06 N 131:02:25 E DB 33:44:58 N 130:58:35 E,33:45:50 N 131:04:23 E DP 33:45:50 N 131:04:23 E DP 33:44:19 N 130:57:50 E AC D AN Tsuiki CTR-2 AL GND AH 6000 FT AMSL DP 33:44:19 N 130:57:50 E V X=33:41:06 N 131:02:25 E DB 33:45:50 N 131:04:23 E,33:43.9748 N 130:57.4872 E DP 33:43.9748 N 130:57.4872 E DP 33:44:19 N 130:57:50 E AC D AN Tsushima INFO ZONE AL GND AH 3000 FT AMSL V X=34:17:06 N 129:19:50 E DC 5 AC D AN Utsunomiya CTR AL GND AH 4000 FT AMSL V X=36:31:00 N 139:52:00 E DC 5 AC D AN Wakkanai INFO ZONE AL GND AH 3000 FT AMSL V X=45:24:16 N 141:48:08 E DC 5 AC D AN Yaizu-Shizuhama CTR AL GND AH 6000 FT AMSL DP 34:45:29 N 138:22:28 E DP 34:46:02 N 138:19:46 E V X=34:48:46 N 138:17.885 E DB 34:48:40 N 138:11:48 E,34:45:29 N 138:22:28 E AC D AN Yakushima INFO ZONE AL GND AH 3000 FT AMSL V X=30:23:08 N 130:39:33 E DC 5 AC D AN Yamagata INFO ZONE AL GND AH 3000 FT AMSL V X=38:24:43 N 140:22:16 E DC 5 AC D AN Yamaguchi-Ube INFO ZONE AL GND AH 3000 FT AMSL V X=33:55:48 N 131:16:43 E DC 5 AC D AN Yokota ATA AL GND AH 3000 FT AMSL DP 35:49:54 N 139:21:11 E V X=35:44:55 N 139:20:55 E DB 35:40:14 N 139:23:05 E,35:49:55 N 139:20:38 E DP 35:49:55 N 139:20:38 E DP 35:49:54 N 139:21:11 E AC D AN Yonagunijima INFO ZONE AL GND AH 3000 FT AMSL V X=24:28:03 N 122:58:47 E DC 5 AC D AN Yoron INFO ZONE AL GND AH 3000 FT AMSL DP 27:02:14 N 128:18:31 E DP 27:02:41 N 128:18.4748 E DP 27:03:08 N 128:18.5015 E V X=27:02:38 N 128:24:06 E DB 27:03:08 N 128:18.5015 E,26:57:39 N 128:24:41 E DP 26:57:39 N 128:24:41 E DP 26:58.6358 N 128:23:33 E DP 26:59.5685 N 128:22.3523 E V D=- V X=26:21:24 N 127:46:07 E DB 26:59.5685 N 128:22.3523 E,27:02:14 N 128:18:31 E AC D AN Zama/Kastner CTR AL GND AH 1700 FT AMSL DP 35:33:30 N 139:24:51 E DP 35:30:30 N 139:24:51 E V X=35:30.5018 N 139:24:51 E DB 35:28:12 N 139:22:29 E,35:33:30 N 139:24:51 E AC E AN Akeno ACA-1 AL 700 FT AMSL AH 2500 FT AMSL DP 34:38:20 N 137:19:37 E V X=34:37:22 N 136:51:40 E DB 34:27:10 N 137:03:18 E,34:34:27 N 136:35.0385 E DP 34:34:27 N 136:35.0385 E DP 34:35:11 N 136:34:53 E V D=- V X=34:51.4686 N 136:48.1533 E DB 34:45:00 N 136:33:05 E,34:38:15 N 136:53:43 E DP 34:38:15 N 136:53:43 E DP 34:38:20 N 137:19:37 E AC E AN Akeno ACA-2 AL 700 FT AMSL AH 4000 FT AMSL V D=- V X=34:44:47 N 137:42:29 E DB 34:38:20 N 137:19:37 E,34:33:59 N 137:22:12 E V D=+ V X=34:51.337 N 136:48:19 E DB 34:33:59 N 137:22:12 E,34:23:33 N 137:09:30 E DP 34:23:33 N 137:09:30 E DP 34:18:35 N 137:03:00 E DP 34:18:26 N 137:02:38 E DP 34:18.0574 N 137:1.62021 E V X=34:37:22 N 136:51:40 E DB 34:18.0574 N 137:1.62021 E,34:35:18 N 136:26:18 E DP 34:35:18 N 136:26:18 E DP 34:46:55 N 136:24:10 E DP 34:47:18 N 136:24.6881 E DP 34:47.8537 N 136:25.5354 E V X=34:32:00 N 136:40:20 E DB 34:47.8537 N 136:25.5354 E,34:50:31 N 136:31:11 E DP 34:50:31 N 136:31:11 E DP 34:49:59 N 136:31:14 E DP 34:49.2372 N 136:31.3574 E V D=- V X=34:51:29 N 136:48:11 E DB 34:49.2372 N 136:31.3574 E,34:45:00 N 136:33:05 E DP 34:45:00 N 136:33:05 E DP 34:35:11 N 136:34:53 E DP 34:34:44 N 136:34.9685 E DP 34:34:00 N 136:35:10 E V X=34:37:22 N 136:51:40 E DB 34:34:00 N 136:35:10 E,34:27:10 N 137:03:18 E DP 34:27:10 N 137:03:18 E DP 34:38:20 N 137:19:37 E AC E AN Akeno ACA-3 AL 700 FT AMSL AH 5000 FT AMSL DP 34:18:35 N 137:03:00 E DP 34:06:16 N 136:46:56 E V X=34:32.0076 N 136:40.3238 E DB 34:14:57 N 136:27:42 E,34:46:55 N 136:24:10 E DP 34:46:55 N 136:24:10 E V D=- V X=34:37:21 N 136:51:41 E DB 34:35:18 N 136:26:18 E,34:18:35 N 137:03:00 E AC E AN Chitose ACA-1 AL 700 FT AMSL AH 8000 FT AMSL DP 43:14:03 N 141:43:27 E DP 43:10:55 N 141:36:59 E DP 43:14:17 N 141:37:08 E DP 43:14:03 N 141:43:27 E AC E AN Chitose ACA-2 AL 700 FT AMSL AH FL160 DP 43:14:03 N 141:43:27 E V X=42:40:08 N 141:40:46 E DB 43:12:17 N 142:36:27 E,43:1.16885 N 142:45.504 E DP 43:1.16885 N 142:45.504 E DP 43:00:55 N 142:45:35 E V D=- V X=43:07:03 N 141:22:53 E DB 43:03:21 N 141:32:34 E,43:8.83538 N 141:33:33 E DP 43:8.83538 N 141:33:33 E DP 43:09:11 N 141:33:25 E DP 43:14:03 N 141:43:27 E AC E AN Chitose ACA-3 AL 700 FT AMSL AH FL200 DP 43:03:21 N 141:32:34 E DP 43:00:55 N 142:45:35 E DP 42:59:39 N 142:46.5206 E DP 42:58:18 N 142:47.2223 E V X=42:40:08 N 141:40:46 E DB 42:58:18 N 142:47.2223 E,41:51:05 N 142:04:10 E DP 41:51:05 N 142:04:10 E V X=42:40:08 N 141:40:46 E DB 41:58:23 N 142:03:31 E,42:05:15 N 141:2.27252 E DP 42:05:15 N 141:2.27252 E DP 42:05:33 N 141:01:52 E DP 42:28:58 N 141:09:50 E DP 42:47:39 N 141:16:16 E V D=- V X=43:07:03 N 141:22:53 E DB 42:59:16 N 141:20:18 E,43:02:57 N 141:32:18 E DP 43:02:57 N 141:32:18 E DP 43:03:21 N 141:32:34 E AC E AN Chitose ACA-4 AL 11000 FT AMSL AH FL200 DP 43:10:55 N 141:36:59 E DP 43:09:11 N 141:33:25 E DP 43:08:57 N 141:33:33 E DP 43:8.39043 N 141:33.7025 E V X=43:07:03 N 141:22:53 E DB 43:8.39043 N 141:33.7025 E,42:59:16 N 141:20:18 E DP 42:59:16 N 141:20:18 E DP 42:47:39 N 141:16:16 E DP 42:49:36 N 140:48:24 E DP 42:48:29 N 140:31:30 E DP 43:10:09 N 140:39:47 E DP 43:38:18 N 141:05:29 E DP 43:33:05 N 141:37:15 E DP 43:27:14 N 141:37:42 E DP 43:14:17 N 141:37:08 E DP 43:10:55 N 141:36:59 E AC E AN Chitose ACA-5 AL 700 FT AMSL AH FL200 DP 42:48:29 N 140:31:30 E DP 42:49:36 N 140:48:24 E DP 42:47:39 N 141:16:16 E DP 42:59:16 N 141:20:18 E V D=- V X=41:46:27 N 140:49:56 E DB 42:28:58 N 141:09:50 E,42:27:04 N 140:23.8009 E DP 42:27:04 N 140:23.8009 E DP 42:26:54 N 140:23:21 E DP 42:48:29 N 140:31:30 E AC E AN Chitose ACA-6 AL 13000 FT AMSL AH FL200 DP 42:28:58 N 141:09:50 E DP 42:05:33 N 141:01:52 E DP 42:26:54 N 140:23:21 E DP 42:27:04 N 140:23.8009 E DP 42:27:38 N 140:25.4513 E V X=41:46:27 N 140:49:56 E DB 42:27:38 N 140:25.4513 E,42:28:58 N 141:09:50 E AC E AN Chitose TCA-1 AL 8001 FT AMSL AH 16000 FT AMSL DP 43:14:17 N 141:37:08 E DP 43:14:03 N 141:43:27 E DP 43:10:55 N 141:36:59 E DP 43:14:17 N 141:37:08 E AC E AN Chitose TCA-10A AL 2001 FT AMSL AH 2999 FT AMSL DP 42:57:08 N 141:42:18 E V D=- V X=42:47.6708 N 141:39.9859 E DB 42:52:05 N 141:43:11 E,42:52:01 N 141:36:37 E DP 42:52:01 N 141:36:37 E DP 42:56:35 N 141:35:58 E DP 42:57:08 N 141:42:18 E AC E AN Chitose TCA-10B AL 6001 FT AMSL AH 20000 FT AMSL DP 42:57:08 N 141:42:18 E V D=- V X=42:47.6708 N 141:39.9859 E DB 42:52:05 N 141:43:11 E,42:52:01 N 141:36:37 E DP 42:52:01 N 141:36:37 E DP 42:56:35 N 141:35:58 E DP 42:57:08 N 141:42:18 E AC E AN Chitose TCA-11 AL 6001 FT AMSL AH 20000 FT AMSL V X=42:47:40 N 141:39:59 E DC 5 AC E AN Chitose TCA-12 AL 2001 FT AMSL AH 2999 FT AMSL DP 42:42:11 N 141:44:56 E DP 42:35:19 N 141:46:09 E DP 42:34:42 N 141:39:06 E V D=- V X=42:46.5028 N 141:41.5417 E DB 42:42:15 N 141:38:01 E,42:42:11 N 141:44:56 E AC E AN Chitose TCA-13 AL 6001 FT AMSL AH 20000 FT AMSL DP 42:44:01 N 141:44:37 E DP 42:35:19 N 141:46:09 E DP 42:34:42 N 141:39:06 E V D=- V X=42:47:40 N 141:39:59 E DB 42:42:54 N 141:37:56 E,42:43.7712 N 141:44:15 E DP 42:43.7712 N 141:44:15 E DP 42:44:01 N 141:44:37 E AC E AN Chitose TCA-14 AL 8001 FT AMSL AH 20000 FT AMSL DP 42:35:19 N 141:46:09 E V X=42:45.6029 N 141:40:30 E DB 42:28:36 N 141:47:19 E,42:27:52 N 141:40:05 E DP 42:27:52 N 141:40:05 E DP 42:34:42 N 141:39:06 E DP 42:35:19 N 141:46:09 E AC E AN Chitose TCA-15A AL 2001 FT AMSL AH 2999 FT AMSL DP 43:02:57 N 141:48:10 E DP 42:30:48 N 141:53:47 E DP 42:30:21 N 141:52:49 E DP 42:29.9375 N 141:51.8032 E V X=42:45.8678 N 141:40:25 E DB 42:29.9375 N 141:51.8032 E,42:28:36 N 141:47:19 E DP 42:28:36 N 141:47:19 E V D=- V X=42:46:31 N 141:41:33 E DB 42:42:11 N 141:44:56 E,42:50.4847 N 141:45.686 E DP 42:50.4847 N 141:45.686 E DP 42:50:35 N 141:45:30 E DP 42:50:57 N 141:45.1367 E V X=42:47:40 N 141:39:59 E DB 42:50:57 N 141:45.1367 E,42:52:05 N 141:43:11 E DP 42:52:05 N 141:43:11 E DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V D=+ V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E AC E AN Chitose TCA-15B AL 8001 FT AMSL AH 20000 FT AMSL DP 43:02:57 N 141:48:10 E DP 42:30:48 N 141:53:47 E DP 42:30:21 N 141:52:49 E DP 42:29.9375 N 141:51.8032 E V X=42:45.8678 N 141:40:25 E DB 42:29.9375 N 141:51.8032 E,42:28:36 N 141:47:19 E DP 42:28:36 N 141:47:19 E DP 42:44:01 N 141:44:37 E DP 42:44:20 N 141:45.0544 E DP 42:44.6723 N 141:45.4404 E V D=- V X=42:47:40 N 141:39:59 E DB 42:44.6723 N 141:45.4404 E,42:52:05 N 141:43:11 E DP 42:52:05 N 141:43:11 E DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V D=+ V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E AC E AN Chitose TCA-16 AL 8001 FT AMSL AH 20000 FT AMSL DP 43:02:50 N 141:48:11 E DP 43:02:49 N 141:48:42 E DP 43:02:31 N 141:49:47 E V X=42:45:52 N 141:40:25 E DB 43:02:31 N 141:49:47 E,42:40.8509 N 142:3.95234 E DP 42:40.8509 N 142:3.95234 E DP 42:40:50 N 142:03:52 E DP 42:44:24 N 141:51:24 E DP 43:02:50 N 141:48:11 E AC E AN Chitose TCA-17A AL 2000 FT AMSL AH 3999 FT AMSL DP 42:44:24 N 141:51:24 E DP 42:40:50 N 142:03:52 E DP 42:40:01 N 142:3.57176 E DP 42:39.219 N 142:3.1686 E V X=42:45:52 N 141:40:25 E DB 42:39.219 N 142:3.1686 E,42:30:48 N 141:53:47 E DP 42:30:48 N 141:53:47 E DP 42:44:24 N 141:51:24 E AC E AN Chitose TCA-17B AL 8001 FT AMSL AH 20000 FT AMSL DP 42:44:24 N 141:51:24 E DP 42:40:50 N 142:03:52 E DP 42:40:01 N 142:3.57176 E DP 42:39.219 N 142:3.1686 E V X=42:45:52 N 141:40:25 E DB 42:39.219 N 142:3.1686 E,42:30:48 N 141:53:47 E DP 42:30:48 N 141:53:47 E DP 42:44:24 N 141:51:24 E AC E AN Chitose TCA-18 AL 4000 FT AMSL AH 20000 FT AMSL DP 43:02:49 N 141:48:42 E DP 43:02:18 N 142:04:18 E DP 42:39:20 N 142:09:04 E DP 42:40:50 N 142:03:52 E DP 42:41.6367 N 142:4.23912 E DP 42:42:28 N 142:4.48648 E V D=- V X=42:45:52 N 141:40:25 E DB 42:42:28 N 142:4.48648 E,43:02:49 N 141:48:42 E AC E AN Chitose TCA-19 AL 7000 FT AMSL AH 20000 FT AMSL DP 43:02:18 N 142:04:18 E DP 43:01:56 N 142:15:17 E DP 42:57:52 N 142:05:14 E DP 43:02:18 N 142:04:18 E AC E AN Chitose TCA-2 AL 3000 FT AMSL AH 16000 FT AMSL DP 43:14:03 N 141:43:27 E DP 43:13:41 N 141:53:40 E V D=- V X=42:47:40 N 141:39:59 E DB 43:05:24 N 141:49:18 E,43:06:10 N 141:34:03 E DP 43:06:10 N 141:34:03 E V X=43:07:04 N 141:22:58 E DB 43:06:06 N 141:33:44 E,43:09:11 N 141:33:25 E DP 43:09:11 N 141:33:25 E DP 43:10:55 N 141:36:59 E DP 43:14:03 N 141:43:27 E AC E AN Chitose TCA-20 AL 5000 FT AMSL AH 20000 FT AMSL DP 43:01:56 N 142:15:17 E V X=42:47:40 N 141:40.0076 E DB 43:01:54 N 142:15:55 E,42:36:48 N 142:17:55 E DP 42:36:48 N 142:17:55 E DP 42:39:20 N 142:09:04 E DP 42:57:52 N 142:05:14 E DP 43:01:56 N 142:15:17 E AC E AN Chitose TCA-21 AL 3000 FT AMSL AH 20000 FT AMSL DP 42:40:26 N 142:05:17 E DP 42:36:48 N 142:17:55 E DP 42:35:47 N 142:17.3724 E DP 42:34.788 N 142:16.7529 E V X=42:47:40 N 141:39:59 E DB 42:34.788 N 142:16.7529 E,42:27:55 N 142:10:34 E DP 42:27:55 N 142:10:34 E V D=- V X=42:47:40 N 141:39:59 E DB 42:34:29 N 142:00:23 E,42:39.7369 N 142:04:56 E DP 42:39.7369 N 142:04:56 E DP 42:40:26 N 142:05:17 E AC E AN Chitose TCA-22 AL 3000 FT AMSL AH 20000 FT AMSL DP 42:43:36 N 141:36:03 E DP 42:43:21 N 141:36.5527 E DP 42:43.1414 N 141:37.0914 E DP 42:42.9699 N 141:37.6531 E DP 42:42:54 N 141:37:56 E V X=42:46:31 N 141:41:33 E DB 42:42:15 N 141:38:01 E,42:43:26 N 141:36.2054 E DP 42:43:26 N 141:36.2054 E DP 42:43:36 N 141:36:03 E AC E AN Chitose TCA-23 AL 2000 FT AMSL AH 20000 FT AMSL DP 43:03:21 N 141:32:34 E DP 43:03:16 N 141:35:00 E V D=- V X=42:47:40 N 141:39:59 E DB 42:52:01 N 141:36:37 E,42:43:43 N 141:35:49 E DP 42:43:43 N 141:35:49 E DP 42:43:36 N 141:36:03 E DP 42:43:15 N 141:36:25 E V X=42:46.5177 N 141:41.5511 E DB 42:43:15 N 141:36:25 E,42:42:15 N 141:38:01 E DP 42:42:15 N 141:38:01 E V X=42:45:52 N 141:40:25 E DB 42:27:52 N 141:40:05 E,42:40:18 N 142:3.71751 E DP 42:40:18 N 142:3.71751 E DP 42:40:50 N 142:03:52 E DP 42:40:26 N 142:05:17 E DP 42:39:36 N 142:04:51 E DP 42:38:48 N 142:04:20 E V D=+ V X=42:47:40 N 141:39:59 E DB 42:38:48 N 142:04:20 E,42:34:29 N 142:00:23 E DP 42:34:29 N 142:00:23 E DP 42:27:55 N 142:10:34 E DP 42:27:05 N 142:9.60499 E DP 42:26.3032 N 142:08:34 E V X=42:47:40 N 141:39:59 E DB 42:26.3032 N 142:08:34 E,42:21:55 N 141:19:08 E DP 42:21:55 N 141:19:08 E DP 42:39:35 N 141:33:27 E DP 42:56:58 N 141:29:40 E V D=- V X=43:07:03 N 141:22:53 E DB 42:59:35 N 141:26:47 E,43:3.22187 N 141:32.4892 E DP 43:3.22187 N 141:32.4892 E DP 43:03:21 N 141:32:34 E AC E AN Chitose TCA-24 AL 3000 FT AMSL AH 20000 FT AMSL DP 42:59:35 N 141:26:47 E DP 42:56:58 N 141:29:40 E DP 42:39:35 N 141:33:27 E DP 42:35:35 N 141:30:12 E DP 42:53:57 N 141:26:11 E DP 42:56:44 N 141:20:05 E DP 42:57:54 N 141:19:50 E DP 42:59:16 N 141:20:18 E V D=- V X=43:07:03 N 141:22:53 E DB 42:59:16 N 141:20:18 E,42:59:28 N 141:26:24 E DP 42:59:28 N 141:26:24 E DP 42:59:35 N 141:26:47 E AC E AN Chitose TCA-25 AL 5000 FT AMSL AH 20000 FT AMSL DP 42:35:35 N 141:30:12 E DP 42:30:16 N 141:25:54 E DP 42:56:44 N 141:20:05 E DP 42:53:57 N 141:26:11 E DP 42:35:35 N 141:30:12 E AC E AN Chitose TCA-26 AL 6000 FT AMSL AH 20000 FT AMSL DP 42:57:54 N 141:19:50 E DP 42:30:16 N 141:25:54 E V X=42:47:40 N 141:39:59 E DB 42:21:55 N 141:19:08 E,42:27:25 N 141:09:57 E DP 42:27:25 N 141:09:57 E DP 42:27:49 N 141:09:30 E DP 42:57:54 N 141:19:50 E AC E AN Chitose TCA-27 AL 11001 FT AMSL AH 20000 FT AMSL DP 43:17:36 N 141:37:17 E DP 43:10:55 N 141:36:59 E DP 43:09:11 N 141:33:25 E DP 43:8.64155 N 141:33.6387 E DP 43:08:05 N 141:33:46 E V X=43:07:03 N 141:22:53 E DB 43:08:05 N 141:33:46 E,42:59:16 N 141:20:18 E DP 42:59:16 N 141:20:18 E DP 42:47:39 N 141:16:16 E DP 42:48:50 N 140:59:16 E DP 42:49:56 N 140:59.2064 E DP 42:51.0209 N 140:59.3402 E V X=42:47:40 N 141:39:59 E DB 42:51.0209 N 140:59.3402 E,43:17:36 N 141:37:17 E AC E AN Chitose TCA-28 AL 8000 FT AMSL AH 20000 FT AMSL DP 42:48:50 N 140:59:16 E DP 42:47:39 N 141:16:16 E DP 42:28:57 N 141:09:54 E DP 42:29:23 N 141:08:11 E DP 42:29:30 N 141:07:38 E V X=42:47:40 N 141:39:59 E DB 42:29:30 N 141:07:38 E,42:47:49 N 140:59:11 E DP 42:47:49 N 140:59:11 E DP 42:48:50 N 140:59:16 E AC E AN Chitose TCA-29 AL 13001 FT AMSL AH 20000 FT AMSL DP 42:28:57 N 141:09:54 E DP 42:27:49 N 141:09:30 E DP 42:28.637 N 141:08:33 E DP 42:29:30 N 141:07:38 E DP 42:29:23 N 141:08:11 E DP 42:28:57 N 141:09:54 E AC E AN Chitose TCA-3 AL 2000 FT AMSL AH 16000 FT AMSL DP 43:05:24 N 141:49:18 E DP 43:03:10 N 141:48:08 E DP 43:02:57 N 141:48:10 E V D=- V X=42:45:52 N 141:40:25 E DB 43:02:57 N 141:48:10 E,43:03:31 N 141:35:34 E DP 43:03:31 N 141:35:34 E DP 43:03:25 N 141:34:59 E DP 43:03:16 N 141:35:00 E V X=43:07:03 N 141:22:53 E DB 43:03:21 N 141:32:34 E,43:06:02 N 141:33:44 E DP 43:06:02 N 141:33:44 E DP 43:06:06 N 141:33:44 E DP 43:06:18 N 141:34:54 E DP 43:06:27 N 141:36.0709 E V D=+ V X=42:47:40 N 141:39:59 E DB 43:06:27 N 141:36.0709 E,43:05:24 N 141:49:18 E AC E AN Chitose TCA-4 AL 8001 FT AMSL AH 16000 FT AMSL DP 43:03:51 N 141:41:07 E DP 43:03:04 N 141:41:15 E DP 43:03:16 N 141:35:00 E V X=42:45:52 N 141:40:25 E DB 43:03:25 N 141:34:59 E,43:03:52 N 141:40:45 E DP 43:03:52 N 141:40:45 E DP 43:03:51 N 141:41:07 E AC E AN Chitose TCA-5A AL 2001 FT AMSL AH 2999 FT AMSL DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E DP 43:02:57 N 141:48:10 E DP 43:02:50 N 141:48:11 E DP 43:03:04 N 141:41:15 E DP 43:03:51 N 141:41:07 E AC E AN Chitose TCA-5B AL 8001 FT AMSL AH 16000 FT AMSL DP 43:03:51 N 141:41:07 E DP 43:03:49 N 141:42:17 E DP 43:03:44 N 141:43:26 E V X=42:45:52 N 141:40:25 E DB 43:03:44 N 141:43:26 E,43:02:57 N 141:48:10 E DP 43:02:57 N 141:48:10 E DP 43:02:50 N 141:48:11 E DP 43:03:04 N 141:41:15 E DP 43:03:51 N 141:41:07 E AC E AN Chitose TCA-6 AL 8001 FT AMSL AH 16000 FT AMSL DP 43:02:57 N 141:48:10 E DP 43:02:49 N 141:48:42 E DP 43:02:50 N 141:48:11 E DP 43:02:57 N 141:48:10 E AC E AN Chitose TCA-7 AL 4000 FT AMSL AH 16000 FT AMSL DP 43:13:41 N 141:53:40 E DP 43:13:27 N 142:00:53 E DP 43:12:54 N 142:02:06 E DP 43:02:18 N 142:04:18 E DP 43:02:49 N 141:48:42 E DP 43:02:57 N 141:48:10 E DP 43:03:10 N 141:48:08 E DP 43:13:41 N 141:53:40 E AC E AN Chitose TCA-8 AL 7000 FT AMSL AH 16000 FT AMSL V X=42:47:40 N 141:39:59 E DB 43:12:54 N 142:02:06 E,43:02:41 N 142:15.405 E DP 43:02:41 N 142:15.405 E DP 43:01:54 N 142:15:55 E DP 43:02:18 N 142:04:18 E DP 43:12:54 N 142:02:06 E AC E AN Chitose TCA-9 AL 8001 FT AMSL AH 20000 FT AMSL DP 43:03:16 N 141:35:00 E DP 43:03:04 N 141:41:15 E DP 42:57:08 N 141:42:18 E DP 42:56:35 N 141:35:58 E DP 43:03:16 N 141:35:00 E AC E AN Chubu ACA-1 AL 700 FT AMSL AH 12000 FT AMSL DP 34:06:16 N 136:46:56 E V X=34:51:29 N 136:48:11 E DB 34:01:50 N 136:40:59 E,34:13:59 N 136:08:02 E DP 34:13:59 N 136:08:02 E V D=- V X=34:48:20 N 135:24:13 E DB 34:14:57 N 136:06:47 E,34:25:38 N 136:16:11 E DP 34:25:38 N 136:16:11 E DP 34:26:53 N 136:16:54 E DP 34:26:49 N 136:16.9179 E DP 34:25.9553 N 136:17.2245 E V X=34:32:00 N 136:40:20 E DB 34:25.9553 N 136:17.2245 E,34:14:57 N 136:27:42 E DP 34:14:57 N 136:27:42 E DP 34:06:16 N 136:46:56 E AC E AN Chubu ACA-2 AL 5000 FT AMSL AH 12000 FT AMSL DP 34:18:35 N 137:03:00 E DP 34:06:16 N 136:46:56 E V X=34:32:00 N 136:40:20 E DB 34:14:57 N 136:27:42 E,34:26.0242 N 136:17:12 E DP 34:26.0242 N 136:17:12 E DP 34:26:53 N 136:16:54 E DP 34:27.1738 N 136:17.0747 E DP 34:28:26 N 136:17:48 E DP 34:29.7029 N 136:18:29 E DP 34:31:00 N 136:19:05 E DP 34:33:24 N 136:16:08 E DP 34:33:38 N 136:16.1523 E DP 34:34.5201 N 136:16:16 E V X=34:32:00 N 136:40:20 E DB 34:34.5201 N 136:16:16 E,34:46:55 N 136:24:10 E DP 34:46:55 N 136:24:10 E V D=- V X=34:37:21 N 136:51:41 E DB 34:35:18 N 136:26:18 E,34:18:35 N 137:03:00 E AC E AN Chubu ACA-3 AL 4000 FT AMSL AH 12000 FT AMSL V X=35:15:55 N 136:54.9015 E DB 34:50:22 N 137:32:30 E,34:47:24 N 137:29.1567 E DP 34:47:24 N 137:29.1567 E DP 34:46:32 N 137:28:02 E DP 34:45:39 N 137:27:51 E V X=34:51:29 N 136:48:11 E DB 34:45:39 N 137:27:51 E,34:24.0883 N 137:10.7356 E DP 34:24.0883 N 137:10.7356 E DP 34:23:33 N 137:09:30 E DP 34:18:35 N 137:03:00 E DP 34:18:26 N 137:02:38 E DP 34:18.0574 N 137:1.62021 E V X=34:37:22 N 136:51:40 E DB 34:18.0574 N 137:1.62021 E,34:35:18 N 136:26:18 E DP 34:35:18 N 136:26:18 E DP 34:46:55 N 136:24:10 E DP 34:47:18 N 136:24.6881 E DP 34:47.8537 N 136:25.5354 E V X=34:32:00 N 136:40:20 E DB 34:47.8537 N 136:25.5354 E,34:50:31 N 136:31:11 E DP 34:50:31 N 136:31:11 E DP 34:49:59 N 136:31:14 E DP 34:49.2372 N 136:31.3574 E V D=- V X=34:51:29 N 136:48:11 E DB 34:49.2372 N 136:31.3574 E,34:45:00 N 136:33:05 E DP 34:45:00 N 136:33:05 E DP 34:35:11 N 136:34:53 E DP 34:34:44 N 136:34.9685 E DP 34:34:00 N 136:35:10 E V X=34:37:22 N 136:51:40 E DB 34:34:00 N 136:35:10 E,34:27:10 N 137:03:18 E DP 34:27:10 N 137:03:18 E V D=+ V X=34:44:50 N 137:42:36 E DB 34:38:20 N 137:19:37 E,34:48:42 N 137:18:44 E DP 34:48:42 N 137:18:44 E DP 34:49:34 N 137:18:58 E DP 34:50:22 N 137:32:30 E AC E AN Chubu ACA-4 AL 2500 FT AMSL AH 12000 FT AMSL DP 34:38:20 N 137:19:37 E V X=34:37:22 N 136:51:40 E DB 34:27:10 N 137:03:18 E,34:34:27 N 136:35.0385 E DP 34:34:27 N 136:35.0385 E DP 34:35:11 N 136:34:53 E V D=- V X=34:51.4686 N 136:48.1533 E DB 34:45:00 N 136:33:05 E,34:38:15 N 136:53:43 E DP 34:38:15 N 136:53:43 E DP 34:38:20 N 137:19:37 E AC E AN Chubu ACA-5 AL 700 FT AMSL AH 12000 FT AMSL DP 34:49:34 N 137:18:58 E DP 34:48.9081 N 137:18:47 E DP 34:48:02 N 137:18.5844 E V D=- V X=34:44:50 N 137:42:36 E DB 34:48:02 N 137:18.5844 E,34:38:20 N 137:19:37 E DP 34:38:20 N 137:19:37 E V D=+ V X=34:51:29 N 136:48:11 E DB 34:38:15 N 136:53:43 E,34:49.7718 N 136:31:16 E DP 34:49.7718 N 136:31:16 E V D=- V X=34:32:00 N 136:40:20 E DB 34:50:31 N 136:31:11 E,34:34.2904 N 136:16:14 E DP 34:34.2904 N 136:16:14 E DP 34:33:24 N 136:16:08 E DP 34:56:33 N 135:47:35 E DP 34:57:32 N 135:47.6706 E DP 34:58.9343 N 135:47:54 E V D=+ V X=34:51:29 N 136:48:11 E DB 34:58.9343 N 135:47:54 E,35:07:11 N 135:50:15 E DP 35:07:11 N 135:50:15 E DP 34:51:29 N 136:48:11 E DP 34:48:21 N 136:58:37 E DP 34:49:34 N 137:18:58 E AC E AN Chubu ACA-6 AL 4000 FT AMSL AH FL150 DP 34:58:51 N 137:39:05 E DP 34:57:44 N 137:38.4549 E DP 34:56:37 N 137:37:44 E V X=35:15:55 N 136:54:54 E DB 34:56:37 N 137:37:44 E,34:50:22 N 137:32:30 E DP 34:50:22 N 137:32:30 E DP 34:49:34 N 137:18:58 E DP 34:50.0889 N 137:19.1209 E DP 34:50:57 N 137:19:26 E V X=34:44:50 N 137:42:36 E DB 34:50:57 N 137:19:26 E,34:55:01 N 137:21:39 E DP 34:55:01 N 137:21:39 E DP 34:55.7694 N 137:22:30 E DP 34:56.6028 N 137:23:22 E DP 34:57:28 N 137:24:12 E DP 34:58:21 N 137:24:59 E DP 34:59:15 N 137:25:44 E DP 34:59.3863 N 137:25.9057 E DP 34:59.985 N 137:26:43 E V X=34:44:50 N 137:42:36 E DB 34:59.985 N 137:26:43 E,35:03:53 N 137:35:14 E DP 35:03:53 N 137:35:14 E DP 34:58:51 N 137:39:05 E AC E AN Chubu ACA-7 AL 6000 FT AMSL AH FL150 V X=35:15:55 N 136:54.9015 E DB 35:04:48 N 137:41:53 E,35:00:00 N 137:39:45 E DP 35:00:00 N 137:39:45 E DP 34:58:51 N 137:39:05 E V X=34:44.8343 N 137:42:36 E DB 35:03:53 N 137:35:14 E,35:04:46 N 137:40:48 E DP 35:04:46 N 137:40:48 E DP 35:04:48 N 137:41:53 E AC E AN Chubu ACA-8 AL 700 FT AMSL AH FL150 DP 35:04:48 N 137:41:53 E DP 35:04:48 N 137:41:26 E DP 35:04:44 N 137:40.3404 E V D=- V X=34:44:50 N 137:42:36 E DB 35:04:44 N 137:40.3404 E,34:59:15 N 137:25:44 E V D=+ V X=35:15:34 N 136:54:59 E DB 34:59:15 N 137:25:44 E,34:55.8213 N 137:22.5551 E DP 34:55.8213 N 137:22.5551 E DP 34:55:01 N 137:21:39 E DP 34:54:33 N 137:21.3247 E V D=- V X=34:44:50 N 137:42:36 E DB 34:54:33 N 137:21.3247 E,34:50:26 N 137:19.238 E DP 34:50:26 N 137:19.238 E DP 34:49:34 N 137:18:58 E DP 34:48:21 N 136:58:37 E DP 34:51:29 N 136:48:11 E DP 35:07:11 N 135:50:15 E DP 35:08:02 N 135:50.5043 E DP 35:09:22 N 135:51.0913 E V D=+ V X=34:51:29 N 136:48:11 E DB 35:09:22 N 135:51.0913 E,35:29:55 N 136:08:56 E V X=35:15:55 N 136:54:54 E DB 35:29:55 N 136:08:56 E,35:06:01 N 137:42.3247 E DP 35:06:01 N 137:42.3247 E DP 35:04:48 N 137:41:53 E AC E AN Chubu TCA-1 AL 5000 FT AMSL AH 10000 FT AMSL V X=34:51:29 N 136:48:11 E DB 34:25:00 N 136:31:06 E,34:35:28 N 136:17:21 E DP 34:35:28 N 136:17:21 E DP 34:36:24 N 136:16:40 E DP 34:37:09 N 136:16:53 E V X=34:32:00 N 136:40:20 E DB 34:37:09 N 136:16:53 E,34:46:55 N 136:24:10 E DP 34:46:55 N 136:24:10 E V D=- V X=34:37.3082 N 136:51.5537 E DB 34:35:18 N 136:26:18 E,34:25:00 N 136:31:06 E AC E AN Chubu TCA-10 AL 4000 FT AMSL AH 10000 FT AMSL DP 34:47:24 N 136:51:47 E DP 34:44:06 N 136:52:34 E DP 34:43:10 N 136:46:48 E V D=- V X=34:51:28 N 136:48.3068 E DB 34:46:47 N 136:46:20 E,34:47:24 N 136:51:47 E AC E AN Chubu TCA-11 AL GND AH 3000 FT AMSL V X=34:51:30 N 136:48:19 E DC 5 AC E AN Chubu TCA-12 AL 1500 FT AMSL AH 10000 FT AMSL DP 34:56:19 N 136:43:51 E V D=- V X=34:51:30 N 136:48:19 E DB 34:55:14 N 136:44:15 E,34:46:56 N 136:45.8204 E DP 34:46:56 N 136:45.8204 E DP 34:46:47 N 136:46:20 E V D=+ V X=34:51:29 N 136:48.1365 E DB 34:37:30 N 136:47:31 E,34:51:29 N 136:31:08 E DP 34:51:29 N 136:31:08 E DP 34:51:29 N 136:40:53 E DP 34:51:43 N 136:40:53 E DP 34:52.2027 N 136:40.9243 E V X=34:51:29 N 136:48:11 E DB 34:52.2027 N 136:40.9243 E,34:56:19 N 136:43:51 E AC E AN Chubu TCA-13 AL 1800 FT AMSL AH 10000 FT AMSL DP 35:04:09 N 136:40:56 E V D=- V X=34:51:29 N 136:48:11 E DB 34:56:19 N 136:43:51 E,34:51.9725 N 136:40:54 E DP 34:51.9725 N 136:40:54 E DP 34:51:29 N 136:40:53 E DP 34:51:29 N 136:31:08 E DP 34:52:05 N 136:31:09 E DP 34:52:55 N 136:35:08 E DP 35:00:21 N 136:36:42 E V D=+ V X=34:51:34 N 136:48:07 E DB 35:01:50 N 136:36:42 E,35:04:09 N 136:40:56 E AC E AN Chubu TCA-14 AL 2000 FT AMSL AH 10000 FT AMSL DP 35:01:50 N 136:36:42 E DP 35:00:21 N 136:36:42 E DP 34:52:55 N 136:35:08 E V X=34:51.488 N 136:48:08 E DB 34:52:05 N 136:31:09 E,35:01:50 N 136:36:42 E AC E AN Chubu TCA-15 AL 1500 FT AMSL AH 10000 FT AMSL DP 34:44:17 N 136:58:32 E DP 34:38:16 N 136:59:57 E DP 34:38:15 N 136:53:56 E DP 34:47:24 N 136:51:47 E DP 34:47:35 N 136:52:07 E DP 34:47:53 N 136:52.5229 E DP 34:48:12 N 136:52:54 E DP 34:44:17 N 136:58:32 E AC E AN Chubu TCA-16 AL 1800 FT AMSL AH 10000 FT AMSL DP 35:04:43 N 136:53:43 E DP 34:44:17 N 136:58:32 E DP 34:48:12 N 136:52:54 E DP 34:48:16 N 136:52.9888 E DP 34:48:37 N 136:53.3221 E V D=- V X=34:51:30 N 136:48:19 E DB 34:48:37 N 136:53.3221 E,34:56:24 N 136:49:39 E DP 34:56:24 N 136:49:39 E V D=+ V X=34:51:29 N 136:48:11 E DB 35:05:28 N 136:47:30 E,35:04:57 N 136:52:51 E DP 35:04:57 N 136:52:51 E DP 35:04:43 N 136:53:43 E AC E AN Chubu TCA-17 AL 4000 FT AMSL AH 10000 FT AMSL DP 34:59:42 N 136:48:52 E V D=- V X=34:51:30 N 136:48:19 E DB 34:56:24 N 136:49:39 E,34:55:32 N 136:44:40 E DP 34:55:32 N 136:44:40 E DP 34:55:14 N 136:44:15 E DP 34:58:45 N 136:42:56 E DP 34:59:42 N 136:48:52 E AC E AN Chubu TCA-18 AL 5500 FT AMSL AH 10000 FT AMSL DP 35:02:38 N 136:48:10 E DP 34:59:42 N 136:48:52 E DP 34:58:45 N 136:42:56 E DP 35:01:38 N 136:41:52 E DP 35:02:38 N 136:48:10 E AC E AN Chubu TCA-19A AL 1500 FT AMSL AH 1800 FT AMSL DP 35:04:36 N 136:47:42 E DP 35:02:38 N 136:48:10 E DP 35:01:38 N 136:41:52 E DP 35:03:33 N 136:41:09 E DP 35:04:36 N 136:47:42 E AC E AN Chubu TCA-19B AL 7000 FT AMSL AH 10000 FT AMSL DP 35:04:36 N 136:47:42 E DP 35:02:38 N 136:48:10 E DP 35:01:38 N 136:41:52 E DP 35:03:33 N 136:41:09 E DP 35:04:36 N 136:47:42 E AC E AN Chubu TCA-2 AL 4000 FT AMSL AH 10000 FT AMSL V X=34:51.4389 N 136:48.1582 E DB 34:37:06 N 137:20:12 E,34:25:00 N 136:31:06 E DP 34:25:00 N 136:31:06 E DP 34:25.1407 N 136:30.9722 E DP 34:25:54 N 136:30:21 E V X=34:37:22 N 136:51:40 E DB 34:25:54 N 136:30:21 E,34:35:18 N 136:26:18 E DP 34:35:18 N 136:26:18 E DP 34:46:55 N 136:24:10 E DP 34:47:18 N 136:24.6881 E DP 34:47.8537 N 136:25.5354 E V X=34:32:00 N 136:40:20 E DB 34:47.8537 N 136:25.5354 E,34:50:31 N 136:31:11 E DP 34:50:31 N 136:31:11 E DP 34:49:59 N 136:31:14 E DP 34:49.2372 N 136:31.3574 E V D=- V X=34:51:29 N 136:48:11 E DB 34:49.2372 N 136:31.3574 E,34:45:00 N 136:33:05 E DP 34:45:00 N 136:33:05 E DP 34:35:11 N 136:34:53 E DP 34:34:44 N 136:34.9685 E DP 34:34:00 N 136:35:10 E V X=34:37:22 N 136:51:40 E DB 34:34:00 N 136:35:10 E,34:27:10 N 137:03:18 E DP 34:27:10 N 137:03:18 E DP 34:38:20 N 137:19:37 E DP 34:37:56 N 137:19:48 E DP 34:37:06 N 137:20:12 E AC E AN Chubu TCA-20A AL 1800 FT AMSL AH 2500 FT AMSL DP 35:05:28 N 136:47:30 E DP 35:04:36 N 136:47:42 E DP 35:03:33 N 136:41:09 E DP 35:04:09 N 136:40:56 E DP 35:04:18 N 136:41.3034 E DP 35:04:35 N 136:42:09 E V X=34:51:29 N 136:48:11 E DB 35:04:35 N 136:42:09 E,35:05:28 N 136:47:30 E AC E AN Chubu TCA-20B AL 7000 FT AMSL AH 10000 FT AMSL DP 35:05:28 N 136:47:30 E DP 35:04:36 N 136:47:42 E DP 35:03:33 N 136:41:09 E DP 35:04:09 N 136:40:56 E DP 35:04:18 N 136:41.3034 E DP 35:04:35 N 136:42:09 E V X=34:51:29 N 136:48:11 E DB 35:04:35 N 136:42:09 E,35:05:28 N 136:47:30 E AC E AN Chubu TCA-21 AL 7000 FT AMSL AH 10000 FT AMSL DP 35:06:28 N 136:47:16 E V D=- V X=34:51.6397 N 136:48:07 E DB 35:05:28 N 136:47:30 E,35:04:09 N 136:40:56 E DP 35:04:09 N 136:40:56 E V D=+ V X=34:51:31 N 136:48.173 E DB 35:08:01 N 136:39:29 E,35:09:09 N 136:43:57 E DP 35:09:09 N 136:43:57 E DP 35:06:12 N 136:44:40 E DP 35:06:19 N 136:45:23 E DP 35:6.40784 N 136:46.3229 E DP 35:06:28 N 136:47:16 E AC E AN Chubu TCA-22A AL 2500 FT AMSL AH 3000 FT AMSL DP 35:09:26 N 136:46:34 E DP 35:06:28 N 136:47:16 E DP 35:6.42483 N 136:46.5386 E DP 35:6.33523 N 136:45:36 E DP 35:06:12 N 136:44:40 E DP 35:09:09 N 136:43:57 E DP 35:09:14 N 136:44.5069 E DP 35:9.35578 N 136:45:32 E DP 35:09:26 N 136:46:34 E AC E AN Chubu TCA-22B AL 7000 FT AMSL AH 10000 FT AMSL DP 35:09:26 N 136:46:34 E DP 35:06:28 N 136:47:16 E DP 35:6.42483 N 136:46.5386 E DP 35:6.33523 N 136:45:36 E DP 35:06:12 N 136:44:40 E DP 35:09:09 N 136:43:57 E DP 35:09:14 N 136:44.5069 E DP 35:9.35578 N 136:45:32 E DP 35:09:26 N 136:46:34 E AC E AN Chubu TCA-23 AL 2500 FT AMSL AH 10000 FT AMSL DP 34:49:47 N 137:08:18 E DP 34:42:58 N 137:11:49 E DP 34:38:17 N 137:11:49 E DP 34:38:17 N 137:01:46 E DP 34:49:47 N 137:01:46 E DP 34:49:47 N 137:08:18 E AC E AN Chubu TCA-24 AL 3000 FT AMSL AH 10000 FT AMSL DP 34:38:19 N 137:14:10 E DP 34:38:17 N 137:11:49 E DP 34:42:58 N 137:11:49 E DP 34:38:19 N 137:14:10 E AC E AN Chubu TCA-25 AL 3500 FT AMSL AH 10000 FT AMSL DP 35:05:14 N 137:12:37 E V X=35:15:55 N 136:54:54 E DB 35:01:05 N 137:19:29 E,34:57.6244 N 137:15.701 E DP 34:57.6244 N 137:15.701 E DP 34:56:58 N 137:14:47 E DP 34:52:04 N 137:19:55 E DP 34:51.49 N 137:19.6526 E DP 34:50.6403 N 137:19:19 E V D=- V X=34:44:50 N 137:42:36 E DB 34:50.6403 N 137:19:19 E,34:38:20 N 137:19:37 E DP 34:38:20 N 137:19:37 E DP 34:38:19 N 137:14:10 E DP 34:59:20 N 137:03:24 E DP 34:59:28 N 137:3.82146 E DP 34:59:50 N 137:4.75799 E V X=35:15:55 N 136:54:54 E DB 34:59:50 N 137:4.75799 E,35:05:14 N 137:12:37 E AC E AN Chubu TCA-26 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:07:27 N 137:30:05 E DP 35:07:19 N 137:30:03 E DP 35:06:16 N 137:29:38 E V X=35:15:55 N 136:54:54 E DB 35:06:16 N 137:29:38 E,34:57:38 N 137:23:57 E DP 34:57:38 N 137:23:57 E DP 34:57.2378 N 137:24:04 E DP 34:56:10 N 137:24:18 E V X=34:51:29 N 136:48:11 E DB 34:56:10 N 137:24:18 E,34:37:06 N 137:20:12 E DP 34:37:06 N 137:20:12 E DP 34:37.2383 N 137:20:08 E DP 34:38.0716 N 137:19.7342 E V X=34:44:50 N 137:42:36 E DB 34:38.0716 N 137:19.7342 E,34:52:04 N 137:19:55 E DP 34:52:04 N 137:19:55 E DP 34:56:58 N 137:14:47 E DP 34:57.3909 N 137:15.3895 E DP 34:58.0747 N 137:16:17 E V D=- V X=35:15:55 N 136:54:54 E DB 34:58.0747 N 137:16:17 E,35:01:05 N 137:19:29 E DP 35:01:05 N 137:19:29 E DP 35:04:03 N 137:14:34 E DP 35:04:39 N 137:15.0884 E DP 35:5.38989 N 137:15.6858 E V X=35:15:55 N 136:54:54 E DB 35:5.38989 N 137:15.6858 E,35:10:16 N 137:18:22 E DP 35:10:16 N 137:18:22 E DP 35:07:27 N 137:30:05 E AC E AN Chubu TCA-27 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:04:03 N 137:14:34 E V D=- V X=35:15:55 N 136:54:54 E DB 35:07:01 N 137:09:40 E,35:21.9175 N 137:11.7406 E DP 35:21.9175 N 137:11.7406 E DP 35:22:37 N 137:11:20 E V X=35:15:56 N 136:54.9348 E DB 35:22:10 N 137:10:14 E,35:29:21 N 136:50:07 E DP 35:29:21 N 136:50:07 E DP 35:33:11 N 136:48:45 E DP 35:33.2875 N 136:49.1731 E DP 35:33.4885 N 136:50.1856 E V D=+ V X=35:15:55 N 136:54:54 E DB 35:33.4885 N 136:50.1856 E,35:23:58 N 137:14:37 E DP 35:23:58 N 137:14:37 E V X=35:15:53 N 136:54.9707 E DB 35:24:51 N 137:16:49 E,35:04:03 N 137:14:34 E AC E AN Chubu TCA-28 AL 3500 FT AMSL AH 10000 FT AMSL DP 35:22:37 N 137:11:20 E DP 35:22.4211 N 137:11.4582 E DP 35:21:43 N 137:11:51 E V X=35:15:55 N 136:54:54 E DB 35:21:43 N 137:11:51 E,35:07:01 N 137:09:40 E DP 35:07:01 N 137:09:40 E DP 35:11:10 N 137:02:46 E DP 35:11:25 N 137:2.98767 E DP 35:11:54 N 137:3.35716 E V D=- V X=35:15:55 N 136:54:54 E DB 35:11:54 N 137:3.35716 E,35:19:29 N 137:03:40 E DP 35:19:29 N 137:03:40 E DP 35:22:37 N 137:11:20 E AC E AN Chubu TCA-29 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:08:24 N 137:02:38 E DP 35:05:31 N 137:04:26 E DP 35:5.27054 N 137:04:03 E DP 35:4.87325 N 137:3.30728 E V X=35:15:55 N 136:54:54 E DB 35:4.87325 N 137:3.30728 E,35:03:38 N 137:00:08 E DP 35:03:38 N 137:00:08 E DP 35:06:33 N 136:58:18 E DP 35:08:24 N 137:02:38 E AC E AN Chubu TCA-3 AL 3000 FT AMSL AH 10000 FT AMSL V X=34:37:20 N 136:51.6185 E DB 34:23:25 N 136:52:57 E,34:28:33 N 136:38:29 E DP 34:28:33 N 136:38:29 E DP 34:31:56 N 136:43:09 E DP 34:31:48 N 136:43.97 E DP 34:31:40 N 136:45:03 E V D=- V X=34:51:29 N 136:48:11 E DB 34:31:40 N 136:45:03 E,34:31:41 N 136:51:32 E DP 34:31:41 N 136:51:32 E DP 34:23:25 N 136:52:57 E AC E AN Chubu TCA-30 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:11:03 N 137:00:57 E DP 35:08:24 N 137:02:38 E DP 35:06:33 N 136:58:18 E DP 35:09:13 N 136:56:37 E DP 35:11:03 N 137:00:57 E AC E AN Chubu TCA-31 AL 3000 FT AMSL AH 10000 FT AMSL DP 35:11:03 N 137:00:57 E DP 35:09:13 N 136:56:37 E V X=35:15:18 N 136:55:28 E DB 35:10:19 N 136:55:56 E,35:12:10 N 137:00:14 E DP 35:12:10 N 137:00:14 E DP 35:11:03 N 137:00:57 E AC E AN Chubu TCA-32 AL 6000 FT AMSL AH 10000 FT AMSL V D=- V X=35:15:18 N 136:55:28 E DB 35:20:13 N 136:56:36 E,35:19.0679 N 136:51.4346 E DP 35:19.0679 N 136:51.4346 E V D=+ V X=35:23:40 N 136:52.1726 E DB 35:18:45 N 136:51:03 E,35:20:13 N 136:56:36 E AC E AN Chubu TCA-33 AL 1900 FT AMSL AH 10000 FT AMSL DP 35:05:18 N 137:06:02 E DP 35:4.88868 N 137:05:26 E DP 35:04:27 N 137:04:42 E V X=35:15:55 N 136:54:54 E DB 35:04:27 N 137:04:42 E,35:01:56 N 136:54:22 E DP 35:01:56 N 136:54:22 E V D=- V X=34:51.6533 N 136:48:12 E DB 35:04:43 N 136:53:43 E,35:05:28 N 136:47:53 E DP 35:05:28 N 136:47:53 E DP 35:20:22 N 136:47:34 E DP 35:20:13 N 136:47:44 E DP 35:19.9055 N 136:48:08 E V X=35:23:40 N 136:52:10 E DB 35:19.9055 N 136:48:08 E,35:18:45 N 136:51:03 E DP 35:18:45 N 136:51:03 E DP 35:18:26 N 136:50:42 E DP 35:18.0738 N 136:50.3739 E V X=35:15:18 N 136:55:28 E DB 35:18.0738 N 136:50.3739 E,35:10:19 N 136:55:56 E DP 35:10:19 N 136:55:56 E V X=35:15:55 N 136:54:54 E DB 35:03:38 N 137:00:08 E,35:5.0915 N 137:3.72207 E DP 35:5.0915 N 137:3.72207 E DP 35:05:31 N 137:04:26 E DP 35:08:46 N 137:02:24 E DP 35:05:18 N 137:06:02 E AC E AN Chubu TCA-34 AL 2500 FT AMSL AH 10000 FT AMSL DP 34:38:17 N 137:01:46 E DP 34:38:16 N 136:59:57 E V D=- V X=35:15:55 N 136:54:54 E DB 35:01:56 N 136:54:22 E,35:4.82385 N 137:05:20 E DP 35:4.82385 N 137:05:20 E DP 35:05:18 N 137:06:02 E DP 35:08:46 N 137:02:24 E DP 35:12:10 N 137:00:14 E DP 35:12.1873 N 137:00:16 E DP 35:12:33 N 137:00:35 E V X=35:15:18 N 136:55:28 E DB 35:12:33 N 137:00:35 E,35:20:13 N 136:56:36 E V X=35:23:40 N 136:52:10 E DB 35:20:13 N 136:56:36 E,35:20:22 N 136:47:34 E DP 35:20:22 N 136:47:34 E DP 35:05:28 N 136:47:53 E DP 35:05:28 N 136:47:30 E DP 35:09:26 N 136:46:34 E DP 35:09:24 N 136:46.0021 E DP 35:09:18 N 136:44.9724 E DP 35:09:09 N 136:43:57 E V D=+ V X=35:15:55 N 136:54:54 E DB 35:23:32 N 136:40:31 E,35:22:50 N 137:9.80732 E DP 35:22:50 N 137:9.80732 E DP 35:22:10 N 137:10:14 E V X=35:15:54 N 136:54:57 E DB 35:19:29 N 137:03:40 E,35:11:10 N 137:02:46 E DP 35:11:10 N 137:02:46 E V X=35:15:55 N 136:54:54 E DB 35:05:14 N 137:12:37 E,34:59:40 N 137:4.35196 E DP 34:59:40 N 137:4.35196 E DP 34:59:20 N 137:03:24 E DP 34:49:47 N 137:08:18 E DP 34:49:47 N 137:01:46 E DP 34:38:17 N 137:01:46 E AC E AN Chubu TCA-35 AL 5000 FT AMSL AH 10000 FT AMSL V D=- V X=34:51:29 N 136:48:11 E DB 35:01:50 N 136:36:42 E,34:51:16 N 136:31.1364 E DP 34:51:16 N 136:31.1364 E DP 34:50:31 N 136:31:11 E DP 34:50:14 N 136:30:22 E DP 34:49:51 N 136:29:23 E DP 34:49.4221 N 136:28.4222 E DP 34:48:58 N 136:27.486 E DP 34:48:28 N 136:26:35 E DP 34:49:02 N 136:26.4716 E DP 34:49.8734 N 136:26.3531 E V D=+ V X=34:51:29 N 136:48:11 E DB 34:49.8734 N 136:26.3531 E,35:01:12 N 136:29:43 E DP 35:01:12 N 136:29:43 E V X=34:51:29 N 136:48:11 E DB 35:02:17 N 136:27:40 E,35:5.65632 N 136:30.9856 E DP 35:5.65632 N 136:30.9856 E DP 35:06:16 N 136:31:47 E DP 35:01:50 N 136:36:42 E AC E AN Chubu TCA-36 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:07:48 N 136:34:07 E DP 35:07:30 N 136:33:35 E DP 35:06:57 N 136:32.7223 E V D=- V X=34:51:29 N 136:48:11 E DB 35:06:57 N 136:32.7223 E,35:02:17 N 136:27:40 E DP 35:02:17 N 136:27:40 E V X=34:51.4734 N 136:48.0567 E DB 35:01:12 N 136:29:43 E,34:48:28 N 136:26:35 E DP 34:48:28 N 136:26:35 E DP 34:48:07 N 136:25:59 E DP 34:47.5714 N 136:25:07 E V X=34:32:00 N 136:40:20 E DB 34:47.5714 N 136:25:07 E,34:36:24 N 136:16:40 E V D=+ V X=34:51.5072 N 136:48.1402 E DB 34:36:24 N 136:16:40 E,35:09:36 N 136:19:02 E DP 35:09:36 N 136:19:02 E DP 35:09:53 N 136:18.9559 E DP 35:10:57 N 136:18.7061 E V X=35:15:55 N 136:54:54 E DB 35:10:57 N 136:18.7061 E,35:16:24 N 136:18:11 E V X=34:51:29 N 136:48:11 E DB 35:16:24 N 136:18:11 E,35:19.3735 N 136:22:23 E DP 35:19.3735 N 136:22:23 E DP 35:20:04 N 136:23:33 E DP 35:07:48 N 136:34:07 E AC E AN Chubu TCA-37 AL 3500 FT AMSL AH 10000 FT AMSL DP 35:29:21 N 136:50:07 E DP 35:29.2842 N 136:49.8399 E DP 35:29:03 N 136:48.9701 E V D=- V X=35:15:55 N 136:54:54 E DB 35:29:03 N 136:48.9701 E,35:23:32 N 136:40:31 E DP 35:23:32 N 136:40:31 E V X=34:51:34 N 136:48:10 E DB 35:09:09 N 136:43:57 E,35:08:01 N 136:39:29 E DP 35:08:01 N 136:39:29 E V X=34:51.5208 N 136:48:09 E DB 35:04:09 N 136:40:56 E,35:01:50 N 136:36:42 E DP 35:01:50 N 136:36:42 E DP 35:06:16 N 136:31:47 E DP 35:6.40365 N 136:31:58 E DP 35:06:59 N 136:32:48 E V D=+ V X=34:51:29 N 136:48:11 E DB 35:06:59 N 136:32:48 E,35:10:07 N 136:39:23 E DP 35:10:07 N 136:39:23 E V X=35:15:55 N 136:54:54 E DB 35:21:33 N 136:33:58 E,35:32.9344 N 136:47.754 E DP 35:32.9344 N 136:47.754 E DP 35:33:11 N 136:48:45 E DP 35:29:21 N 136:50:07 E AC E AN Chubu TCA-38 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:14:47 N 136:37:10 E DP 35:10:08 N 136:39.3908 E DP 35:09:47 N 136:38.3687 E DP 35:9.41802 N 136:37:24 E DP 35:8.97458 N 136:36:24 E DP 35:08:33 N 136:35.4862 E DP 35:08:04 N 136:34:33 E DP 35:07:48 N 136:34:07 E DP 35:11:53 N 136:30:35 E DP 35:11:58 N 136:30:43 E DP 35:12.5211 N 136:31.7239 E V X=34:51:29 N 136:48:11 E DB 35:12.5211 N 136:31.7239 E,35:14:47 N 136:37:10 E AC E AN Chubu TCA-39 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:33:11 N 136:48:45 E DP 35:33.056 N 136:48.2059 E DP 35:32:47 N 136:47.2208 E V D=- V X=35:15:55 N 136:54:54 E DB 35:32:47 N 136:47.2208 E,35:21:33 N 136:33:58 E DP 35:21:33 N 136:33:58 E V X=34:51.4842 N 136:48:11 E DB 35:14:47 N 136:37:10 E,35:12:27 N 136:31.5901 E DP 35:12:27 N 136:31.5901 E DP 35:11:53 N 136:30:35 E V D=+ V X=34:51:29 N 136:48:11 E DB 35:20:04 N 136:23:33 E,35:23:40 N 136:31.4211 E DP 35:23:40 N 136:31.4211 E DP 35:24:06 N 136:32:46 E V X=35:15.9371 N 136:54.891 E DB 35:30:18 N 136:29:50 E,35:39:55 N 136:46:21 E DP 35:39:55 N 136:46:21 E DP 35:33:11 N 136:48:45 E AC E AN Chubu TCA-4 AL 2500 FT AMSL AH 12000 FT AMSL DP 34:38:20 N 137:19:37 E V X=34:37:22 N 136:51:40 E DB 34:27:10 N 137:03:18 E,34:23.4875 N 136:53.8521 E DP 34:23.4875 N 136:53.8521 E DP 34:23:25 N 136:52:57 E V X=34:51:29 N 136:48:11 E DB 34:31:41 N 136:51:32 E,34:31:46 N 136:44:13 E DP 34:31:46 N 136:44:13 E DP 34:31:56 N 136:43:09 E V X=34:37.355 N 136:51.6078 E DB 34:28:33 N 136:38:29 E,34:35:11 N 136:34:53 E DP 34:35:11 N 136:34:53 E DP 34:45:00 N 136:33:05 E DP 34:44:34 N 136:33.3712 E DP 34:43.9231 N 136:33:51 E V D=- V X=34:51:29 N 136:48:11 E DB 34:43.9231 N 136:33:51 E,34:37:30 N 136:47:31 E DP 34:37:30 N 136:47:31 E DP 34:33:29 N 136:48:01 E DP 34:33:29 N 136:48:48 E DP 34:33:32 N 136:49.8214 E V X=34:51:29 N 136:48:11 E DB 34:33:32 N 136:49.8214 E,34:34:20 N 136:54:52 E DP 34:34:20 N 136:54:52 E DP 34:38:15 N 136:53:56 E DP 34:38:20 N 137:19:37 E AC E AN Chubu TCA-40 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:08:51 N 137:24:14 E V D=- V X=35:15:56 N 136:54.9249 E DB 35:10:16 N 137:18:22 E,35:24:51 N 137:16:49 E DP 35:24:51 N 137:16:49 E V X=35:15:55 N 136:54:54 E DB 35:23:58 N 137:14:37 E,35:33.408 N 136:49.7547 E DP 35:33.408 N 136:49.7547 E DP 35:33:11 N 136:48:45 E V D=+ V X=35:15:55 N 136:54:56 E DB 35:39:55 N 136:46:21 E,35:08:51 N 137:24:14 E AC E AN Chubu TCA-41 AL 7000 FT AMSL AH 10000 FT AMSL DP 35:07:27 N 137:30:05 E DP 35:08:51 N 137:24:14 E DP 35:09:07 N 137:24:20 E DP 35:10:05 N 137:24.6414 E V D=- V X=35:15:55 N 136:54:54 E DB 35:10:05 N 137:24.6414 E,35:30:18 N 136:29:50 E DP 35:30:18 N 136:29:50 E DP 35:24:06 N 136:32:46 E DP 35:24:05 N 136:32:40 E DP 35:23:38 N 136:31.3246 E V X=34:51:29 N 136:48:11 E DB 35:23:38 N 136:31.3246 E,35:16:24 N 136:18:11 E V D=+ V X=35:15:55 N 136:54:54 E DB 35:16:24 N 136:18:11 E,35:8.50221 N 137:30.4519 E DP 35:8.50221 N 137:30.4519 E DP 35:07:27 N 137:30:05 E AC E AN Chubu TCA-5A AL 2500 FT AMSL AH 3000 FT AMSL DP 34:37:18 N 136:54:10 E V X=34:51:29 N 136:48:11 E DB 34:34:20 N 136:54:52 E,34:33.4889 N 136:49:03 E DP 34:33.4889 N 136:49:03 E DP 34:33:29 N 136:48:01 E DP 34:36:29 N 136:47:39 E DP 34:36:29 N 136:47.6903 E DP 34:36:29 N 136:48:38 E V D=- V X=34:51:29 N 136:48:11 E DB 34:36:29 N 136:48:38 E,34:37:18 N 136:54:10 E AC E AN Chubu TCA-5B AL 7000 FT AMSL AH 10000 FT AMSL DP 34:37:18 N 136:54:10 E V X=34:51:29 N 136:48:11 E DB 34:34:20 N 136:54:52 E,34:33.4889 N 136:49:03 E DP 34:33.4889 N 136:49:03 E DP 34:33:29 N 136:48:01 E DP 34:36:29 N 136:47:39 E DP 34:36:29 N 136:47.6903 E DP 34:36:29 N 136:48:38 E V D=- V X=34:51:29 N 136:48:11 E DB 34:36:29 N 136:48:38 E,34:37:18 N 136:54:10 E AC E AN Chubu TCA-6 AL 7000 FT AMSL AH 10000 FT AMSL DP 34:38:15 N 136:53:56 E V X=34:51:29 N 136:48:11 E DB 34:37:18 N 136:54:10 E,34:36:29 N 136:48.5909 E DP 34:36:29 N 136:48.5909 E DP 34:36:29 N 136:47:39 E V D=- V X=34:51.4026 N 136:48:13 E DB 34:37:30 N 136:47:31 E,34:38:15 N 136:53:43 E DP 34:38:15 N 136:53:43 E DP 34:38:15 N 136:53:56 E AC E AN Chubu TCA-7A AL 1500 FT AMSL AH 2500 FT AMSL DP 34:39:11 N 136:53:43 E DP 34:38:15 N 136:53:57 E DP 34:38:15 N 136:53:43 E DP 34:38.0384 N 136:52.9076 E V X=34:51:29 N 136:48:11 E DB 34:38.0384 N 136:52.9076 E,34:37:30 N 136:47:31 E DP 34:37:30 N 136:47:31 E DP 34:38:11 N 136:47:26 E DP 34:39:11 N 136:53:43 E AC E AN Chubu TCA-7B AL 7000 FT AMSL AH 10000 FT AMSL DP 34:39:11 N 136:53:43 E DP 34:38:15 N 136:53:57 E DP 34:38:15 N 136:53:43 E DP 34:38.0384 N 136:52.9076 E V X=34:51:29 N 136:48:11 E DB 34:38.0384 N 136:52.9076 E,34:37:30 N 136:47:31 E DP 34:37:30 N 136:47:31 E DP 34:38:11 N 136:47:26 E DP 34:39:11 N 136:53:43 E AC E AN Chubu TCA-8A AL 1500 FT AMSL AH 1800 FT AMSL DP 34:41:09 N 136:53:15 E DP 34:39:11 N 136:53:43 E DP 34:38:11 N 136:47:26 E DP 34:40:11 N 136:47:10 E DP 34:41:09 N 136:53:15 E AC E AN Chubu TCA-8B AL 7000 FT AMSL AH 10000 FT AMSL DP 34:41:09 N 136:53:15 E DP 34:39:11 N 136:53:43 E DP 34:38:11 N 136:47:26 E DP 34:40:11 N 136:47:10 E DP 34:41:09 N 136:53:15 E AC E AN Chubu TCA-9 AL 5500 FT AMSL AH 10000 FT AMSL DP 34:44:06 N 136:52:34 E DP 34:41:09 N 136:53:15 E DP 34:40:11 N 136:47:10 E DP 34:43:10 N 136:46:48 E DP 34:44:06 N 136:52:34 E AC E AN Fukuoka ACA-1 AL 700 FT AMSL AH FL150 DP 34:00:07 N 129:46:26 E DP 33:46:48 N 129:52:36 E DP 33:37:03 N 129:56:24 E DP 33:32:57 N 129:58:00 E DP 33:32.4383 N 129:57.2912 E DP 33:32:00 N 129:56:31 E V X=33:44:51 N 129:46:37 E DB 33:32:00 N 129:56:31 E,34:00:07 N 129:46:26 E AC E AN Fukuoka ACA-10 AL 6000 FT AMSL AH 12000 FT AMSL DP 33:42:28 N 130:48:58 E DP 33:43:51 N 130:54:45 E DP 33:44:58 N 130:59:45 E DP 33:34:37 N 130:51:45 E DP 33:36:11 N 130:44:24 E DP 33:40:47 N 130:41:49 E DP 33:42:28 N 130:48:58 E AC E AN Fukuoka ACA-11 AL 700 FT AMSL AH 12000 FT AMSL DP 33:36:11 N 130:44:24 E DP 33:34:37 N 130:51:45 E DP 33:29:44 N 130:48:00 E DP 33:36:11 N 130:44:24 E AC E AN Fukuoka ACA-12 AL 12000 FT AMSL AH FL150 DP 33:52:47 N 130:51:40 E DP 33:53:27 N 130:53:56 E DP 33:58:36 N 131:12:15 E DP 33:48:29 N 131:14:25 E DP 33:44:58 N 130:59:45 E DP 33:43:51 N 130:54:45 E DP 33:52:47 N 130:51:40 E AC E AN Fukuoka ACA-2 AL 700 FT AMSL AH FL170 V X=33:40.6176 N 130:23:18 E DB 34:09:37 N 129:42:00 E,34:15:54 N 130:56:55 E DP 34:15:54 N 130:56:55 E V D=- V X=33:51:24 N 131:01:46 E DB 34:01:33 N 130:54:04 E,33:51.7242 N 130:47:20 E DP 33:51.7242 N 130:47:20 E DP 33:51:35 N 130:47:20 E DP 33:46:21 N 130:28:50 E DP 33:37:03 N 129:56:24 E DP 33:46:48 N 129:52:36 E DP 34:00:07 N 129:46:26 E DP 34:09:37 N 129:42:00 E AC E AN Fukuoka ACA-3 AL 10000 FT AMSL AH FL170 V X=33:40.8208 N 130:23:40 E DB 34:15:54 N 130:56:55 E,34:11:28 N 131:02:45 E DP 34:11:28 N 131:02:45 E DP 33:59:05 N 130:55:38 E DP 34:01:33 N 130:54:04 E DP 34:15:54 N 130:56:55 E AC E AN Fukuoka ACA-4 AL 8000 FT AMSL AH FL170 DP 34:01:33 N 130:54:04 E DP 33:59:05 N 130:55:38 E DP 33:53:27 N 130:53:56 E DP 33:52:47 N 130:51:40 E DP 33:51:35 N 130:47:20 E DP 33:52:17 N 130:47:22 E DP 33:52:58 N 130:47:27 E V X=33:51:24 N 131:01:46 E DB 33:52:58 N 130:47:27 E,34:01:33 N 130:54:04 E AC E AN Fukuoka ACA-5 AL 12000 FT AMSL AH FL170 DP 34:15.9743 N 130:57:49 E DP 34:16:48 N 131:08:22 E DP 33:58:36 N 131:12:15 E DP 33:53:27 N 130:53:56 E DP 33:59:05 N 130:55:38 E DP 34:11:28 N 131:02:45 E DP 34:12:26 N 131:1.62243 E DP 34:13:22 N 131:00:28 E DP 34:14.2702 N 130:59:16 E DP 34:15.7867 N 130:56:56 E DP 34:15.9743 N 130:57:49 E AC E AN Fukuoka ACA-6 AL 700 FT AMSL AH 6000 FT AMSL DP 33:19:29 N 130:10:48 E DP 33:09:15 N 130:20:28 E DP 33:03:09 N 130:21:04 E V X=33:08:54 N 130:17.569 E DB 33:01:32 N 130:21:13 E,33:01:47 N 130:13:16 E DP 33:01:47 N 130:13:16 E DP 33:2.53888 N 130:12.8695 E DP 33:3.25241 N 130:12.3748 E V D=- V X=32:54:19 N 129:55:05 E DB 33:3.25241 N 130:12.3748 E,33:09:54 N 130:03:18 E DP 33:09:54 N 130:03:18 E DP 33:10.5896 N 130:3.37267 E DP 33:11.2723 N 130:03:31 E V D=+ V X=33:08:54 N 130:17:34 E DB 33:11.2723 N 130:03:31 E,33:19:29 N 130:10:48 E AC E AN Fukuoka ACA-7 AL 700 FT AMSL AH 10000 FT AMSL DP 33:46:21 N 130:28:50 E DP 33:03:53 N 130:33:03 E DP 33:03:09 N 130:21:04 E DP 33:09:15 N 130:20:28 E DP 33:19:29 N 130:10:48 E DP 33:32:57 N 129:58:00 E DP 33:37:03 N 129:56:24 E DP 33:46:21 N 130:28:50 E AC E AN Fukuoka ACA-8 AL 700 FT AMSL AH FL150 DP 33:46:21 N 130:28:50 E DP 33:51:11 N 130:45:58 E DP 33:42:28 N 130:48:58 E DP 33:40:47 N 130:41:49 E DP 33:36:11 N 130:44:24 E DP 33:29:44 N 130:48:00 E DP 33:05:33 N 131:01:28 E DP 33:03:53 N 130:33:03 E DP 33:46:21 N 130:28:50 E AC E AN Fukuoka ACA-9 AL 8000 FT AMSL AH FL150 DP 33:51:11 N 130:45:58 E DP 33:51:35 N 130:47:20 E DP 33:52:47 N 130:51:40 E DP 33:43:51 N 130:54:45 E DP 33:42:28 N 130:48:58 E DP 33:51:11 N 130:45:58 E AC E AN Fukuoka TCA-1 AL 1800 FT AMSL AH 10000 FT AMSL DP 33:47:28 N 129:53:41 E DP 33:48.5029 N 129:54.123 E DP 33:49:29 N 129:54.7204 E V X=33:35:19 N 130:26:34 E DB 33:49:29 N 129:54.7204 E,34:05:19 N 130:28:27 E DP 34:05:19 N 130:28:27 E DP 33:55:20 N 130:27:50 E DP 33:55:22 N 130:26.7552 E DP 33:55:21 N 130:25:41 E DP 33:55:18 N 130:24:36 E DP 33:55:12 N 130:23:38 E DP 33:45:15 N 130:25:06 E DP 33:45.1531 N 130:24:21 E DP 33:45:01 N 130:23.6056 E DP 33:44:54 N 130:23:06 E DP 33:46:21 N 130:22:07 E DP 33:44:21 N 130:17:57 E V D=- V X=33:35:19 N 130:26:34 E DB 33:38:00 N 130:22:18 E,33:36:30 N 130:21:25 E DP 33:36:30 N 130:21:25 E DP 33:36:24 N 130:21:24 E DP 33:37:15 N 130:17:16 E DP 33:37:48 N 130:17.4522 E DP 33:38.3239 N 130:17.6849 E DP 33:38:33 N 130:17:48 E DP 33:47:28 N 129:53:41 E AC E AN Fukuoka TCA-10 AL 6000 FT AMSL AH 10000 FT AMSL DP 33:49:27 N 130:39:50 E V X=33:35:19 N 130:26:34 E DB 33:50:14 N 130:42:35 E,33:43:00 N 130:48:45 E DP 33:43:00 N 130:48:45 E DP 33:42:47 N 130:48:48 E DP 33:40:55 N 130:43:14 E DP 33:41:39 N 130:42.9073 E DP 33:42.3358 N 130:42:30 E V D=- V X=33:35:19 N 130:26:34 E DB 33:42.3358 N 130:42:30 E,33:47:09 N 130:37:39 E DP 33:47:09 N 130:37:39 E DP 33:49:27 N 130:39:50 E AC E AN Fukuoka TCA-11 AL 3500 FT AMSL AH 10000 FT AMSL DP 33:34:45 N 130:20:37 E DP 33:35:19 N 130:26:34 E V X=33:35:19 N 130:26:34 E DB 33:30:24 N 130:27:42 E,33:34.5553 N 130:20:38 E DP 33:34.5553 N 130:20:38 E DP 33:34:45 N 130:20:37 E AC E AN Fukuoka TCA-12 AL 5000 FT AMSL AH 10000 FT AMSL DP 33:30:24 N 130:27:42 E V X=33:35:19 N 130:26:34 E DB 33:15:28 N 130:31:09 E,33:15:26 N 130:22.218 E DP 33:15:26 N 130:22.218 E DP 33:15:37 N 130:21:10 E V X=33:35:19 N 130:26:34 E DB 33:20:40 N 130:22:33 E,33:27.9908 N 130:10:50 E DP 33:27.9908 N 130:10:50 E DP 33:28:42 N 130:10:27 E DP 33:26:12 N 130:04:25 E DP 33:32:36 N 129:58:20 E DP 33:34:45 N 130:20:37 E DP 33:34.5553 N 130:20:38 E DP 33:34:07 N 130:20:44 E V D=- V X=33:35:19 N 130:26:34 E DB 33:34:07 N 130:20:44 E,33:30:24 N 130:27:42 E AC E AN Fukuoka TCA-13 AL 7000 FT AMSL AH 10000 FT AMSL DP 33:26:12 N 130:04:25 E DP 33:28:42 N 130:10:27 E DP 33:27.9908 N 130:10:50 E DP 33:27.3246 N 130:11:18 E V D=- V X=33:35:19 N 130:26:34 E DB 33:27.3246 N 130:11:18 E,33:20:40 N 130:22:33 E DP 33:20:40 N 130:22:33 E V D=+ V X=33:35:19 N 130:26:34 E DB 33:15:37 N 130:21:10 E,33:21:56 N 130:8.41989 E DP 33:21:56 N 130:8.41989 E DP 33:22:07 N 130:08:18 E DP 33:26:12 N 130:04:25 E AC E AN Fukuoka TCA-14 AL 8000 FT AMSL AH 10000 FT AMSL DP 33:22:07 N 130:08:18 E DP 33:21.4186 N 130:08:59 E DP 33:20:47 N 130:9.73643 E V D=- V X=33:35:19 N 130:26:34 E DB 33:20:47 N 130:9.73643 E,33:15:37 N 130:21:10 E DP 33:15:37 N 130:21:10 E DP 33:10:54 N 130:19:52 E DP 33:11:09 N 130:18.7067 E DP 33:11:10 N 130:18:39 E DP 33:22:07 N 130:08:18 E AC E AN Fukuoka TCA-15 AL 7000 FT AMSL AH 10000 FT AMSL DP 33:15:37 N 130:21:10 E DP 33:15:26 N 130:22.218 E DP 33:15.2885 N 130:23:17 E V D=- V X=33:35:19 N 130:26:34 E DB 33:15.2885 N 130:23:17 E,33:15:28 N 130:31:09 E DP 33:15:28 N 130:31:09 E DP 33:10:44 N 130:32:15 E DP 33:10.5517 N 130:31.0746 E DP 33:10.4214 N 130:29.8893 E V D=+ V X=33:35:19 N 130:26:34 E DB 33:10.4214 N 130:29.8893 E,33:10:54 N 130:19:52 E DP 33:10:54 N 130:19:52 E DP 33:15:37 N 130:21:10 E AC E AN Fukuoka TCA-16 AL 9000 FT AMSL AH 10000 FT AMSL V D=- V X=33:35:19 N 130:26:34 E DB 33:10:54 N 130:19:52 E,33:10:39 N 130:31.7392 E DP 33:10:39 N 130:31.7392 E DP 33:10:44 N 130:32:15 E DP 33:05:49 N 130:33:23 E DP 33:5.62078 N 130:32:06 E DP 33:5.47246 N 130:30:48 E V D=+ V X=33:35:19 N 130:26:34 E DB 33:5.47246 N 130:30:48 E,33:05:39 N 130:20:49 E DP 33:05:39 N 130:20:49 E DP 33:09:15 N 130:20:28 E DP 33:10:07 N 130:19:39 E DP 33:10:54 N 130:19:52 E AC E AN Fukuoka TCA-17 AL 4500 FT AMSL AH 10000 FT AMSL DP 33:35:19 N 130:26:34 E V X=33:35:19 N 130:26:34 E DB 33:39:03 N 130:37:41 E,33:30:31 N 130:37:04 E DP 33:30:31 N 130:37:04 E DP 33:30:27 N 130:37:01 E DP 33:28:01 N 130:42:15 E DP 33:27.3392 N 130:41.8013 E DP 33:26:42 N 130:41.2867 E V X=33:35:19 N 130:26:34 E DB 33:26:42 N 130:41.2867 E,33:23:57 N 130:38:18 E DP 33:23:57 N 130:38:18 E DP 33:16:23 N 130:46:08 E DP 33:15.72 N 130:45.2379 E DP 33:15:07 N 130:44.2859 E V X=33:35:19 N 130:26:34 E DB 33:15:07 N 130:44.2859 E,33:10:44 N 130:32:15 E DP 33:10:44 N 130:32:15 E DP 33:15:28 N 130:31:09 E DP 33:30:24 N 130:27:42 E DP 33:35:19 N 130:26:34 E AC E AN Fukuoka TCA-18 AL 6000 FT AMSL AH 10000 FT AMSL V D=- V X=33:35:19 N 130:26:34 E DB 33:10:44 N 130:32:15 E,33:16:19 N 130:46:06 E DP 33:16:19 N 130:46:06 E DP 33:16:23 N 130:46:08 E DP 33:12:36 N 130:50:01 E DP 33:11:52 N 130:49.0513 E DP 33:11.1914 N 130:48:01 E V D=+ V X=33:35:19 N 130:26:34 E DB 33:11.1914 N 130:48:01 E,33:05:49 N 130:33:23 E DP 33:05:49 N 130:33:23 E DP 33:10:44 N 130:32:15 E AC E AN Fukuoka TCA-19 AL 7000 FT AGL AH 10000 FT AMSL DP 33:39:03 N 130:37:41 E DP 33:40:55 N 130:43:14 E DP 33:40.718 N 130:43.3404 E DP 33:39.9892 N 130:43.652 E V X=33:35:19 N 130:26:34 E DB 33:39.9892 N 130:43.652 E,33:28:01 N 130:42:15 E DP 33:28:01 N 130:42:15 E DP 33:30:27 N 130:37:01 E DP 33:30:31 N 130:37:04 E DP 33:31.071 N 130:37.4066 E V D=- V X=33:35:19 N 130:26:34 E DB 33:31.071 N 130:37.4066 E,33:39:03 N 130:37:41 E AC E AN Fukuoka TCA-2 AL 6000 FT AMSL AH 10000 FT AMSL V X=33:35:19 N 130:26:34 E DB 34:05:19 N 130:28:27 E,33:59:28 N 130:48:05 E DP 33:59:28 N 130:48:05 E DP 33:58:58 N 130:48:47 E V D=- V X=33:52:53 N 130:39:06 E DB 33:54:39 N 130:44:44 E,33:54:40 N 130:33.4742 E DP 33:54:40 N 130:33.4742 E DP 33:54:31 N 130:33:25 E DP 33:54.769 N 130:32:23 E DP 33:54:58 N 130:31:20 E V X=33:35:19 N 130:26:34 E DB 33:54:58 N 130:31:20 E,33:55:20 N 130:27:50 E DP 33:55:20 N 130:27:50 E DP 34:05:19 N 130:28:27 E AC E AN Fukuoka TCA-20 AL 9000 FT AMSL AH 10000 FT AMSL DP 33:40:55 N 130:43:14 E DP 33:42:47 N 130:48:48 E DP 33:42.005 N 130:49:22 E DP 33:41.1523 N 130:49:42 E V X=33:35:19 N 130:26:34 E DB 33:41.1523 N 130:49:42 E,33:33:05 N 130:50:34 E DP 33:33:05 N 130:50:34 E DP 33:29:44 N 130:48:00 E DP 33:27:54 N 130:49:01 E DP 33:27.0711 N 130:48.6056 E DP 33:26:16 N 130:48:09 E DP 33:25.4702 N 130:47.6357 E DP 33:25:28 N 130:47:38 E V D=- V X=33:35:19 N 130:26:34 E DB 33:28:01 N 130:42:15 E,33:40.718 N 130:43.3404 E DP 33:40.718 N 130:43.3404 E DP 33:40:55 N 130:43:14 E AC E AN Fukuoka TCA-21 AL 6000 FT AMSL AH 10000 FT AMSL DP 33:28:01 N 130:42:15 E DP 33:25:28 N 130:47:38 E DP 33:24:41 N 130:47.1206 E DP 33:23:56 N 130:46:32 E V X=33:35:19 N 130:26:34 E DB 33:23:56 N 130:46:32 E,33:20:02 N 130:42:21 E DP 33:20:02 N 130:42:21 E V D=- V X=33:35:19 N 130:26:34 E DB 33:23:57 N 130:38:18 E,33:27.47 N 130:41:54 E DP 33:27.47 N 130:41:54 E DP 33:28:01 N 130:42:15 E AC E AN Fukuoka TCA-22 AL 9000 FT AMSL AH 10000 FT AMSL DP 33:25:28 N 130:47:38 E DP 33:23:44 N 130:51:21 E V X=33:35:19 N 130:26:34 E DB 33:17:04 N 130:55:03 E,33:13:04 N 130:50.6052 E DP 33:13:04 N 130:50.6052 E DP 33:16:23 N 130:46:08 E V D=- V X=33:35:19 N 130:26:34 E DB 33:20:02 N 130:42:21 E,33:24:48 N 130:47:13 E DP 33:24:48 N 130:47:13 E DP 33:25:28 N 130:47:38 E AC E AN Fukuoka TCA-3 AL 8000 FT AMSL AH 10000 FT AMSL DP 33:58:58 N 130:48:47 E DP 33:58:17 N 130:49.8077 E DP 33:57.5537 N 130:50:48 E DP 33:57:15 N 130:51:10 E V X=33:35:19 N 130:26:34 E DB 33:53:36 N 130:47:04 E,33:45.5081 N 130:54:00 E DP 33:45.5081 N 130:54:00 E DP 33:44:39 N 130:54:22 E DP 33:42:47 N 130:48:48 E DP 33:43.6215 N 130:48:26 E DP 33:44:26 N 130:47:58 E V D=- V X=33:35:19 N 130:26:34 E DB 33:44:26 N 130:47:58 E,33:50:14 N 130:42:35 E DP 33:50:14 N 130:42:35 E V X=33:52.8722 N 130:39:09 E DB 33:50:46 N 130:44:33 E,33:54:39 N 130:44:44 E DP 33:54:39 N 130:44:44 E DP 33:58:58 N 130:48:47 E AC E AN Fukuoka TCA-4 AL 3000 FT AMSL AH 10000 FT AMSL DP 33:47:28 N 129:53:41 E DP 33:38:33 N 130:17:48 E DP 33:38:02 N 130:17:33 E DP 33:37.4877 N 130:17.3409 E DP 33:37:15 N 130:17:16 E DP 33:36:24 N 130:21:24 E DP 33:36.8074 N 130:21:32 E DP 33:37:12 N 130:21.721 E DP 33:37.5712 N 130:21.9563 E DP 33:37.9245 N 130:22:14 E DP 33:38:00 N 130:22:18 E DP 33:35:40 N 130:23:55 E DP 33:36:59 N 130:26:40 E DP 33:35:19 N 130:26:34 E DP 33:32:36 N 129:58:20 E V X=33:44:51 N 129:46:37 E DB 33:32:57 N 129:58:00 E,33:30:10 N 129:51:22 E DP 33:30:10 N 129:51:22 E DP 33:30:15 N 129:51:11 E DP 33:31:20 N 129:50:58 E DP 33:32:25 N 129:50:49 E V X=33:35:19 N 130:26:34 E DB 33:32:25 N 129:50:49 E,33:47:28 N 129:53:41 E AC E AN Fukuoka TCA-5 AL 5001 FT AMSL AH 10000 FT AMSL DP 33:37:40 N 130:28:05 E DP 33:35:40 N 130:23:55 E DP 33:44:21 N 130:17:57 E DP 33:46:21 N 130:22:07 E DP 33:37:40 N 130:28:05 E AC E AN Fukuoka TCA-6 AL 2300 FT AMSL AH 10000 FT AMSL DP 33:44:54 N 130:23:06 E DP 33:45.0687 N 130:23:50 E DP 33:45:12 N 130:24:35 E V X=33:35:19 N 130:26:34 E DB 33:45:12 N 130:24:35 E,33:45:19 N 130:27:12 E DP 33:45:19 N 130:27:12 E DP 33:39:29 N 130:26:50 E DP 33:44:54 N 130:23:06 E AC E AN Fukuoka TCA-7 AL 2000 FT AMSL AH 10000 FT AMSL DP 33:55:12 N 130:23:38 E DP 33:55.3012 N 130:24.7048 E DP 33:55:21 N 130:25:47 E DP 33:55:22 N 130:26:52 E DP 33:55:20 N 130:27:50 E DP 33:45:19 N 130:27:12 E DP 33:45:20 N 130:26.4393 E DP 33:45.3033 N 130:25:41 E DP 33:45:15 N 130:25:06 E DP 33:55:12 N 130:23:38 E AC E AN Fukuoka TCA-8 AL 4000 FT AMSL AH 10000 FT AMSL V X=33:35:19 N 130:26:34 E DB 33:55:20 N 130:27:50 E,33:54.6009 N 130:33:09 E DP 33:54.6009 N 130:33:09 E DP 33:54:31 N 130:33:25 E DP 33:54:07 N 130:33:11 E DP 33:53.669 N 130:33.0686 E V D=- V X=33:52:53 N 130:39:06 E DB 33:53.669 N 130:33.0686 E,33:48:25 N 130:36:13 E DP 33:48:25 N 130:36:13 E DP 33:49:27 N 130:39:50 E V D=+ V X=33:35:19 N 130:26:34 E DB 33:47:09 N 130:37:39 E,33:41:03 N 130:43.2184 E DP 33:41:03 N 130:43.2184 E DP 33:40:55 N 130:43:14 E DP 33:35:19 N 130:26:34 E DP 33:36:59 N 130:26:40 E DP 33:37:40 N 130:28:05 E DP 33:39:29 N 130:26:50 E DP 33:45:19 N 130:27:12 E DP 33:55:20 N 130:27:50 E AC E AN Fukuoka TCA-9 AL 6001 FT AMSL AH 10000 FT AMSL DP 33:50:46 N 130:44:33 E V X=33:52:53 N 130:39:06 E DB 33:48:25 N 130:36:13 E,33:51.1517 N 130:44.8364 E DP 33:51.1517 N 130:44.8364 E DP 33:50:46 N 130:44:33 E AC E AN Hakodate ACA AL 700 FT AMSL AH 13000 FT AMSL DP 42:26:54 N 140:23:21 E DP 42:27:29 N 140:24.9911 E DP 42:28:01 N 140:26.6579 E V X=41:46.4415 N 140:49:56 E DB 42:28:01 N 140:26.6579 E,42:28:58 N 141:09:50 E DP 42:28:58 N 141:09:50 E DP 42:05:33 N 141:01:52 E DP 42:4.67174 N 141:03:14 E DP 42:03:52 N 141:04:41 E V D=- V X=42:40:08 N 141:40:46 E DB 42:03:52 N 141:04:41 E,41:57:00 N 141:23:21 E DP 41:57:00 N 141:23:21 E DP 41:44:41 N 141:18:28 E DP 41:25:00 N 141:15:24 E DP 41:25:00 N 141:07:45 E DP 41:00:00 N 140:55:31 E V D=+ V X=41:46.4417 N 140:49:56 E DB 41:00:00 N 140:25:15 E,41:13:44 N 139:59:27 E DP 41:13:44 N 139:59:27 E DP 41:14:40 N 139:58:33 E DP 42:26:54 N 140:23:21 E AC E AN Hamamatsu ACA-1 AL 700 FT AMSL AH 4000 FT AMSL DP 35:03:53 N 137:35:14 E DP 34:58:51 N 137:39:05 E DP 34:58.5188 N 137:38:54 E DP 34:57:24 N 137:38.2016 E V X=35:15:55 N 136:54:54 E DB 34:57:24 N 137:38.2016 E,34:46:27 N 137:27:53 E DP 34:46:27 N 137:27:53 E DP 34:45:41 N 137:27:44 E DP 34:44.5574 N 137:27:28 E V X=34:51:29 N 136:48:11 E DB 34:44.5574 N 137:27:28 E,34:33:59 N 137:22:12 E V X=34:44:48 N 137:42.5226 E DB 34:33:59 N 137:22:12 E,34:55:01 N 137:21:39 E DP 34:55:01 N 137:21:39 E DP 34:55.7694 N 137:22:30 E DP 34:56.6028 N 137:23:22 E DP 34:57:28 N 137:24:12 E DP 34:58:21 N 137:24:59 E DP 34:59:15 N 137:25:44 E DP 34:59.3863 N 137:25.9057 E DP 34:59.985 N 137:26:43 E V X=34:44:50 N 137:42:36 E DB 34:59.985 N 137:26:43 E,35:03:53 N 137:35:14 E AC E AN Hamamatsu ACA-2 AL 700 FT AMSL AH 6000 FT AMSL DP 34:37:23 N 138:05:09 E DP 34:38:46 N 137:46:14 E V D=- V X=34:51.4725 N 136:48:15 E DB 34:38:36 N 137:25:08 E,34:46:27 N 137:27:53 E V X=35:15:55 N 136:54:54 E DB 34:46:27 N 137:27:53 E,34:57:43 N 137:38.4069 E DP 34:57:43 N 137:38.4069 E DP 34:58:51 N 137:39:05 E V D=+ V X=34:44:50 N 137:42.6187 E DB 35:03:53 N 137:35:14 E,34:37:23 N 138:05:09 E AC E AN Hamamatsu ACA-3 AL 700 FT AMSL AH FL140 V X=34:44:50 N 137:42:36 E DB 34:35:21 N 138:17:11 E,34:31:32 N 138:15.2561 E DP 34:31:32 N 138:15.2561 E DP 34:30:35 N 138:14:35 E DP 34:07:52 N 137:58:51 E DP 33:53:49 N 137:04:26 E V X=34:49:20 N 138:17:22 E DB 33:51:24 N 137:00:14 E,34:06:16 N 136:46:56 E DP 34:06:16 N 136:46:56 E V D=- V X=34:51:29 N 136:48:11 E DB 34:23:33 N 137:09:30 E,34:37:33 N 137:24:34 E DP 34:37:33 N 137:24:34 E DP 34:38:36 N 137:25:08 E DP 34:38:46 N 137:46:14 E V X=34:49:20 N 138:17:22 E DB 34:37:05 N 138:09:08 E,34:35:22 N 138:16:17 E DP 34:35:22 N 138:16:17 E DP 34:35:21 N 138:17:11 E AC E AN Hamamatsu TCA-1 AL 6000 FT AMSL AH 6000 FT AMSL DP 34:57:34 N 138:01:22 E V D=- V X=34:44:50 N 137:42:36 E DB 34:56:18 N 137:59:29 E,35:2.37064 N 137:47:28 E DP 35:2.37064 N 137:47:28 E DP 35:02:32 N 137:46:27 E DP 35:04:30 N 137:46:53 E DP 35:4.38577 N 137:47:38 E DP 35:04:11 N 137:48:42 E V D=+ V X=34:44:50 N 137:42:36 E DB 35:04:11 N 137:48:42 E,34:57:34 N 138:01:22 E AC E AN Hamamatsu TCA-10 AL 1800 FT AMSL AH 6000 FT AMSL DP 34:37:42 N 138:00:51 E DP 34:38:46 N 137:46:14 E DP 34:38:36 N 137:26:39 E V X=34:44:51 N 137:42:34 E DB 34:41:50 N 137:34:55 E,34:48:17 N 137:35:12 E DP 34:48:17 N 137:35:12 E DP 34:47:29 N 137:36:54 E DP 34:47:47 N 137:37.1054 E DP 34:48.1385 N 137:37:26 E V X=34:45:01 N 137:42:11 E DB 34:48.1385 N 137:37:26 E,34:44:50 N 137:48:16 E DP 34:44:50 N 137:48:16 E V X=34:44:50 N 137:42.6234 E DB 34:44:50 N 137:55:59 E,34:40:07 N 137:54:41 E DP 34:40:07 N 137:54:41 E DP 34:37:42 N 138:00:51 E AC E AN Hamamatsu TCA-11 AL 1800 FT AMSL AH 10000 FT AMSL V X=34:44:50 N 137:42:36 E DB 34:36:15 N 138:04:33 E,34:33.2417 N 137:22.8054 E DP 34:33.2417 N 137:22.8054 E DP 34:33:59 N 137:22:12 E DP 34:34:48 N 137:22.8018 E DP 34:35:48 N 137:23.4899 E DP 34:36:49 N 137:24.1356 E DP 34:37:51 N 137:24:44 E DP 34:38:36 N 137:26:39 E DP 34:38:46 N 137:46:14 E DP 34:37:42 N 138:00:51 E DP 34:36:15 N 138:04:33 E AC E AN Hamamatsu TCA-12 AL 2500 FT AMSL AH 10000 FT AMSL DP 34:38:36 N 137:26:39 E DP 34:37:51 N 137:24:44 E DP 34:38:36 N 137:25:08 E DP 34:38:36 N 137:26:39 E AC E AN Hamamatsu TCA-13 AL 2500 FT AMSL AH 6000 FT AMSL DP 34:48:17 N 137:35:12 E DP 34:47:58 N 137:34.9882 E DP 34:47:29 N 137:34.7225 E V D=- V X=34:44:50 N 137:42:36 E DB 34:47:29 N 137:34.7225 E,34:41:50 N 137:34:55 E DP 34:41:50 N 137:34:55 E DP 34:38:36 N 137:26:39 E V X=34:51.4725 N 136:48:15 E DB 34:38:36 N 137:25:08 E,34:46:27 N 137:27:53 E DP 34:46:27 N 137:27:53 E DP 34:47.0852 N 137:28:44 E DP 34:47.9738 N 137:29:49 E DP 34:48.8902 N 137:30:52 E DP 34:49:50 N 137:31:53 E DP 34:48:17 N 137:35:12 E AC E AN Hamamatsu TCA-14 AL 2500 FT AMSL AH 4000 FT AMSL DP 34:49:50 N 137:31:53 E DP 34:49:08 N 137:31:08 E DP 34:48.2033 N 137:30.0842 E DP 34:47.3075 N 137:29.0061 E DP 34:46:27 N 137:27:53 E DP 34:45:41 N 137:27:44 E V X=34:51:29 N 136:48:11 E DB 34:45:41 N 137:27:44 E,34:33:59 N 137:22:12 E V X=34:44:51 N 137:42:34 E DB 34:33:59 N 137:22:12 E,34:54:42 N 137:21:26 E DP 34:54:42 N 137:21:26 E DP 34:49:50 N 137:31:53 E AC E AN Hamamatsu TCA-15 AL 4000 FT AMSL AH 4000 FT AMSL V X=35:15:55 N 136:54.9009 E DB 34:57:18 N 137:38:08 E,34:50:48 N 137:32:53 E DP 34:50:48 N 137:32:53 E DP 34:49:50 N 137:31:53 E DP 34:54:42 N 137:21:26 E DP 34:55:01 N 137:21:39 E DP 34:55.7694 N 137:22:30 E V D=- V X=35:15:34 N 136:54:59 E DB 34:55.7694 N 137:22:30 E,34:59:15 N 137:25:44 E V D=+ V X=34:44:50 N 137:42:36 E DB 34:59:15 N 137:25:44 E,35:2.50397 N 137:31.2216 E DP 35:2.50397 N 137:31.2216 E DP 35:02:54 N 137:32:12 E DP 34:56:35 N 137:35:50 E DP 34:56.8187 N 137:36:29 E DP 34:57:05 N 137:37:18 E DP 34:57:18 N 137:38:08 E AC E AN Hamamatsu TCA-2 AL 4500 FT AMSL AH 6000 FT AMSL DP 34:53:09 N 138:04:44 E DP 34:50:14 N 137:56:59 E DP 34:50.702 N 137:56.7181 E DP 34:51.3361 N 137:56.3008 E V D=- V X=34:44:50 N 137:42:36 E DB 34:51.3361 N 137:56.3008 E,34:57:18 N 137:38:08 E DP 34:57:18 N 137:38:08 E DP 34:57:43 N 137:38:25 E DP 34:58:51 N 137:39:05 E V D=+ V X=34:44:50 N 137:42:36 E DB 35:03:53 N 137:35:14 E,35:04:39 N 137:45.8058 E DP 35:04:39 N 137:45.8058 E DP 35:04:30 N 137:46:53 E DP 35:02:32 N 137:46:27 E DP 35:2.39159 N 137:47.3526 E DP 35:2.18798 N 137:48.3578 E V X=34:44:50 N 137:42:36 E DB 35:2.18798 N 137:48.3578 E,34:56:18 N 137:59:29 E DP 34:56:18 N 137:59:29 E V X=34:44:56 N 137:42.7552 E DB 34:57:34 N 138:01:22 E,34:53:09 N 138:04:44 E AC E AN Hamamatsu TCA-3 AL 4000 FT AMSL AH 6000 FT AMSL DP 34:50:14 N 137:56:59 E V D=- V X=34:44:50 N 137:42:36 E DB 34:47:44 N 137:50:21 E,34:48.7363 N 137:35:32 E DP 34:48.7363 N 137:35:32 E DP 34:48:17 N 137:35:12 E DP 34:49:50 N 137:31:53 E DP 34:50.0042 N 137:32.0699 E DP 34:50:59 N 137:33.0534 E V X=35:15:55 N 136:54:54 E DB 34:50:59 N 137:33.0534 E,34:57:18 N 137:38:08 E V D=+ V X=34:44:50 N 137:42:36 E DB 34:57:18 N 137:38:08 E,34:50:53 N 137:56.6045 E DP 34:50:53 N 137:56.6045 E DP 34:50:14 N 137:56:59 E AC E AN Hamamatsu TCA-4 AL 3000 FT AMSL AH 6000 FT AMSL DP 34:47:44 N 137:50:21 E V D=- V X=34:45:01 N 137:42:11 E DB 34:46:49 N 137:47:52 E,34:47.8677 N 137:37:11 E DP 34:47.8677 N 137:37:11 E DP 34:47:29 N 137:36:54 E DP 34:48:17 N 137:35:12 E DP 34:48:19 N 137:35:13 E DP 34:48:46 N 137:35.5524 E V D=+ V X=34:44:50 N 137:42:36 E DB 34:48:46 N 137:35.5524 E,34:47:44 N 137:50:21 E AC E AN Hamamatsu TCA-5 AL 4000 FT AMSL AH 6000 FT AMSL V X=34:45:01 N 137:42:11 E DC 5 AC E AN Hamamatsu TCA-6 AL 4000 FT AMSL AH 6000 FT AMSL DP 34:53:09 N 138:04:44 E DP 34:53.1387 N 138:4.7415 E DP 34:52:19 N 138:5.17009 E V X=34:44:50 N 137:42:36 E DB 34:52:19 N 138:5.17009 E,34:47:08 N 138:06:46 E DP 34:47:08 N 138:06:46 E V D=- V X=34:44.8545 N 137:42.7013 E DB 34:46:40 N 138:01:56 E,34:49:56 N 138:01:03 E DP 34:49:56 N 138:01:03 E DP 34:48:58 N 137:57:35 E DP 34:49.5697 N 137:57.325 E DP 34:50:14 N 137:56:59 E DP 34:53:09 N 138:04:44 E AC E AN Hamamatsu TCA-7 AL 3000 FT AMSL AH 6000 FT AMSL DP 34:47:08 N 138:06:46 E DP 34:46.6187 N 138:06:50 E DP 34:45:44 N 138:06:54 E DP 34:44:50 N 138:06:55 E DP 34:44:50 N 137:55:59 E DP 34:45.4406 N 137:55:58 E DP 34:46:06 N 137:55:53 E DP 34:45:52 N 137:53:28 E DP 34:46:17 N 137:53:25 E DP 34:46:52 N 137:53.2692 E DP 34:47:27 N 137:53:05 E DP 34:48:01 N 137:52:51 E DP 34:48:34 N 137:52:34 E DP 34:50:14 N 137:56:59 E DP 34:49:39 N 137:57.2888 E DP 34:48:58 N 137:57:35 E DP 34:49:56 N 138:01:03 E DP 34:49.7867 N 138:01:07 E DP 34:49.0204 N 138:1.38694 E DP 34:48:15 N 138:01:37 E DP 34:47:28 N 138:01:48 E DP 34:46:40 N 138:01:56 E DP 34:47:08 N 138:06:46 E AC E AN Hamamatsu TCA-8 AL 2000 FT AMSL AH 6000 FT AMSL V X=34:44:50 N 137:42.601 E DB 34:48:34 N 137:52:34 E,34:46:28 N 137:53.3712 E DP 34:46:28 N 137:53.3712 E DP 34:45:52 N 137:53:28 E DP 34:46:06 N 137:55:53 E DP 34:45:30 N 137:55:58 E DP 34:44:50 N 137:55:59 E DP 34:44:50 N 137:48:16 E DP 34:45.0687 N 137:48.273 E DP 34:45:31 N 137:48:15 E DP 34:45.9576 N 137:48:10 E DP 34:46:24 N 137:48.0393 E DP 34:46:49 N 137:47:52 E DP 34:48:34 N 137:52:34 E AC E AN Hamamatsu TCA-9 AL 2000 FT AMSL AH 6000 FT AMSL DP 34:44:50 N 138:06:55 E DP 34:44.0028 N 138:6.90303 E DP 34:43:07 N 138:06:50 E V X=34:44:50 N 137:42:36 E DB 34:43:07 N 138:06:50 E,34:36:15 N 138:04:33 E DP 34:36:15 N 138:04:33 E V D=- V X=34:44.8028 N 137:42.69 E DB 34:40:07 N 137:54:41 E,34:44:50 N 137:55:59 E DP 34:44:50 N 137:55:59 E DP 34:44:50 N 138:06:55 E AC E AN Hiroshima ACA-1 AL 700 FT AMSL AH 8000 FT AMSL V X=34:08:27 N 132:13:57 E DB 34:20:39 N 132:24:29 E,34:06:27 N 132:31:54 E DP 34:06:27 N 132:31:54 E DP 34:05:59 N 132:31:46 E DP 34:06:38 N 132:30:21 E DP 34:15:00 N 132:23:00 E DP 34:17:27 N 132:22:25 E DP 34:20:39 N 132:24:29 E AC E AN Hiroshima ACA-2 AL 700 FT AMSL AH FL150 DP 34:20:39 N 132:24:29 E DP 34:42:55 N 132:38:54 E DP 34:46:20 N 132:41:37 E DP 34:49:24 N 132:43:14 E DP 34:53:37 N 132:45:59 E DP 34:53:36 N 133:08:06 E DP 34:40:20 N 133:34:22 E DP 34:32:06 N 133:20:20 E DP 34:29:56 N 132:53:59 E V D=- V X=34:08:37 N 132:14:09 E DB 34:18:04 N 132:27:51 E,34:20:39 N 132:24:29 E AC E AN Hiroshima ACA-3 AL 700 FT AMSL AH 8000 FT AMSL DP 34:32:06 N 133:20:20 E DP 34:21:47 N 133:27:38 E DP 34:10:50 N 133:23:13 E DP 34:04:27 N 132:35:03 E DP 34:05:59 N 132:31:46 E DP 34:6.50772 N 132:31:54 E DP 34:07:17 N 132:32:00 E V D=- V X=34:08:27 N 132:13:57 E DB 34:07:17 N 132:32:00 E,34:18:04 N 132:27:51 E DP 34:18:04 N 132:27:51 E DP 34:29:56 N 132:53:59 E DP 34:32:06 N 133:20:20 E AC E AN Hiroshima ACA-4 AL 700 FT AMSL AH 6000 FT AMSL DP 34:40:20 N 133:34:22 E DP 34:40:00 N 133:35:00 E DP 34:10:50 N 133:23:13 E DP 34:32:06 N 133:20:20 E DP 34:40:20 N 133:34:22 E AC E AN Hyakuri ACA-1 AL 700 FT AMSL AH 8000 FT AMSL DP 36:16:30 N 140:38:49 E DP 36:05:00 N 140:43:47 E DP 36:05:00 N 140:36:00 E DP 36:08:58 N 140:26:26 E DP 36:11:52 N 140:26:23 E DP 36:16:30 N 140:38:49 E AC E AN Hyakuri ACA-2 AL 700 FT AMSL AH 7000 FT AMSL DP 36:16:59 N 140:10:15 E DP 36:34:29 N 140:13:17 E DP 36:41:38 N 140:27:08 E DP 36:16:28 N 140:22:45 E DP 36:16:59 N 140:10:15 E AC E AN Hyakuri ACA-3 AL 700 FT AMSL AH 10000 FT AMSL DP 36:29:38 N 140:51:26 E DP 36:16:30 N 140:38:49 E DP 36:11:52 N 140:26:23 E DP 36:16:19 N 140:26:19 E DP 36:16:28 N 140:22:45 E V X=35:46:56 N 140:21:45 E DB 36:35:47 N 140:26:06 E,36:30:19 N 140:49:55 E DP 36:30:19 N 140:49:55 E DP 36:29:38 N 140:51:26 E AC E AN Hyakuri ACA-4 AL 700 FT AMSL AH 8000 FT AMSL DP 36:05:00 N 141:46:04 E DP 36:04:19 N 141:44:09 E DP 35:56:00 N 141:15:34 E DP 35:56:00 N 141:03:08 E DP 36:00:11 N 140:52:41 E DP 36:00:12 N 140:45:54 E DP 36:05:00 N 140:43:47 E DP 36:05:00 N 141:46:04 E AC E AN Hyakuri ACA-5 AL 700 FT AMSL AH FL230 V X=36:11.4512 N 140:25.3514 E DB 36:45:14 N 141:54:47 E,36:30:57 N 142:01:00 E DP 36:30:57 N 142:01:00 E DP 36:07:21 N 141:52:33 E DP 36:05:00 N 141:46:04 E DP 36:05:00 N 140:43:47 E DP 36:16:30 N 140:38:49 E DP 36:29:38 N 140:51:26 E DP 36:44:06 N 141:05:27 E DP 36:45:33 N 141:26:04 E DP 36:45:14 N 141:54:47 E AC E AN Hyakuri ACA-6 AL 700 FT AMSL AH 13000 FT AMSL V X=36:11:15 N 140:24:48 E DB 37:16:59 N 141:21:35 E,36:46:51 N 141:53:50 E DP 36:46:51 N 141:53:50 E DP 36:45:14 N 141:54:47 E DP 36:45:33 N 141:26:04 E DP 36:44:06 N 141:05:27 E DP 36:29:38 N 140:51:26 E DP 36:29.8573 N 140:50.9531 E DP 36:30:31 N 140:49.4178 E V D=- V X=35:46:56 N 140:21:45 E DB 36:30:31 N 140:49.4178 E,36:35:47 N 140:26:06 E DP 36:35:47 N 140:26:06 E DP 36:43:09 N 140:27:24 E DP 37:16:59 N 141:21:35 E AC E AN Hyakuri TCA-10 AL 1500 FT AMSL AH 8000 FT AMSL DP 36:05:00 N 140:43:47 E DP 36:05:00 N 140:41:41 E DP 36:5.2879 N 140:41.8344 E DP 36:6.00635 N 140:42.1737 E DP 36:6.73806 N 140:42:28 E DP 36:07:29 N 140:42:42 E DP 36:05:00 N 140:43:47 E AC E AN Hyakuri TCA-11 AL 3000 FT AMSL AH 4000 FT AMSL DP 36:12:44 N 140:13:59 E DP 36:12:25 N 140:13:54 E DP 36:11.823 N 140:13:48 E V D=- V X=36:10:54 N 140:24:53 E DB 36:11.823 N 140:13:48 E,36:08:16 N 140:14:14 E DP 36:08:16 N 140:14:14 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:07:23 N 140:10:41 E,36:12.5523 N 140:10:10 E DP 36:12.5523 N 140:10:10 E DP 36:13:14 N 140:10:19 E DP 36:12:44 N 140:13:59 E AC E AN Hyakuri TCA-12 AL 2200 FT AMSL AH 4000 FT AMSL DP 36:12:14 N 140:17:39 E DP 36:12.0537 N 140:17:36 E DP 36:11.57 N 140:17.5044 E V D=- V X=36:10:54 N 140:24:53 E DB 36:11.57 N 140:17.5044 E,36:09:09 N 140:17:47 E DP 36:09:09 N 140:17:47 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:08:16 N 140:14:14 E,36:12:09 N 140:13:51 E DP 36:12:09 N 140:13:51 E DP 36:12:44 N 140:13:59 E DP 36:12:14 N 140:17:39 E AC E AN Hyakuri TCA-13 AL 1300 FT AMSL AH 8000 FT AMSL DP 36:07:29 N 140:42:42 E DP 36:07:11 N 140:42.6177 E DP 36:6.43906 N 140:42.353 E DP 36:05:43 N 140:42.0413 E DP 36:05:00 N 140:41:41 E DP 36:05:00 N 140:36:00 E V D=- V X=36:10:54 N 140:24:53 E DB 36:07:39 N 140:29:35 E,36:12.9231 N 140:30:33 E DP 36:12.9231 N 140:30:33 E DP 36:13:19 N 140:30:17 E DP 36:16:30 N 140:38:49 E DP 36:07:29 N 140:42:42 E AC E AN Hyakuri TCA-14 AL 4000 FT AMSL AH 7000 FT AMSL V D=- V X=36:10:56 N 140:24.7685 E DB 36:15:34 N 140:11:12 E,36:13:14 N 140:10:19 E DP 36:13:14 N 140:10:19 E DP 36:13:21 N 140:09:30 E DP 36:15:58 N 140:10:02 E DP 36:15:34 N 140:11:12 E AC E AN Hyakuri TCA-15 AL 3000 FT AMSL AH 7000 FT AMSL V D=- V X=36:10:54 N 140:24:53 E DB 36:18:05 N 140:18:10 E,36:13.3185 N 140:14:09 E DP 36:13.3185 N 140:14:09 E DP 36:12:44 N 140:13:59 E DP 36:13:14 N 140:10:19 E DP 36:13.6372 N 140:10:25 E DP 36:14.3066 N 140:10:38 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:14.3066 N 140:10:38 E,36:20:28 N 140:15:55 E DP 36:20:28 N 140:15:55 E DP 36:18:05 N 140:18:10 E AC E AN Hyakuri TCA-16 AL 2200 FT AMSL AH 7000 FT AMSL V D=- V X=36:10:54 N 140:24:53 E DB 36:15:41 N 140:20:24 E,36:12.7078 N 140:17:48 E DP 36:12.7078 N 140:17:48 E DP 36:12:14 N 140:17:39 E DP 36:12:44 N 140:13:59 E DP 36:13:12 N 140:14.1022 E DP 36:13.7677 N 140:14:19 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:13.7677 N 140:14:19 E,36:18:05 N 140:18:10 E DP 36:18:05 N 140:18:10 E DP 36:15:41 N 140:20:24 E AC E AN Hyakuri TCA-17 AL 1300 FT AMSL AH 7000 FT AMSL DP 36:16:19 N 140:26:19 E V D=- V X=36:10:54 N 140:24:53 E DB 36:15:45 N 140:26:20 E,36:12:30 N 140:19:02 E DP 36:12:30 N 140:19:02 E DP 36:12:04 N 140:18:53 E DP 36:12:14 N 140:17:39 E DP 36:12:42 N 140:17:48 E DP 36:13.1543 N 140:18:00 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:13.1543 N 140:18:00 E,36:16:39 N 140:22:47 E DP 36:16:39 N 140:22:47 E DP 36:16:28 N 140:22:45 E DP 36:16:19 N 140:26:19 E AC E AN Hyakuri TCA-18 AL 1300 FT AMSL AH 10000 FT AMSL V X=36:10:54 N 140:24:53 E DB 36:23:18 N 140:34:54 E,36:08:14 N 140:42:55 E DP 36:08:14 N 140:42:55 E DP 36:07:29 N 140:42:42 E DP 36:16:30 N 140:38:49 E DP 36:13:19 N 140:30:17 E DP 36:13:25 N 140:30.2237 E DP 36:13.7894 N 140:29.9239 E V D=- V X=36:10:54 N 140:24:53 E DB 36:13.7894 N 140:29.9239 E,36:15:45 N 140:26:20 E DP 36:15:45 N 140:26:20 E DP 36:16:19 N 140:26:19 E DP 36:16:28 N 140:22:45 E DP 36:16:39 N 140:22:47 E DP 36:16:44 N 140:23.108 E DP 36:16.8248 N 140:23.7033 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:16.8248 N 140:23.7033 E,36:15:56 N 140:28:56 E DP 36:15:56 N 140:28:56 E DP 36:23:18 N 140:34:54 E AC E AN Hyakuri TCA-19 AL 1500 FT AMSL AH 10000 FT AMSL V X=36:10:54 N 140:24:53 E DB 36:32:47 N 140:50:20 E,36:6.07444 N 141:01:32 E DP 36:6.07444 N 141:01:32 E DP 36:05:00 N 141:01:16 E DP 36:05:00 N 140:43:47 E V D=- V X=36:10:54 N 140:24:53 E DB 36:07:29 N 140:42:42 E,36:21:10 N 140:38:05 E DP 36:21:10 N 140:38:05 E DP 36:21:42 N 140:37:24 E DP 36:32:47 N 140:50:20 E AC E AN Hyakuri TCA-2 AL 1800 FT AMSL AH 2500 FT AMSL DP 35:56:00 N 140:35:35 E DP 35:56:00 N 140:31:54 E DP 35:56:26 N 140:30:02 E DP 35:57:32 N 140:29:39 E DP 35:56:00 N 140:35:35 E AC E AN Hyakuri TCA-20 AL 3500 FT AMSL AH 7000 FT AMSL V D=- V X=36:10:54 N 140:24:53 E DB 36:20:28 N 140:15:55 E,36:16:12 N 140:11:33 E DP 36:16:12 N 140:11:33 E DP 36:15:34 N 140:11:12 E DP 36:15:58 N 140:10:02 E DP 36:25:01 N 140:11:39 E DP 36:20:28 N 140:15:55 E AC E AN Hyakuri TCA-21 AL 2500 FT AMSL AH 7000 FT AMSL DP 36:29:53 N 140:25:00 E DP 36:19:48 N 140:23:19 E DP 36:19.7531 N 140:22:54 E DP 36:19:38 N 140:22.1679 E V D=- V X=36:10:54 N 140:24:53 E DB 36:19:38 N 140:22.1679 E,36:18:05 N 140:18:10 E DP 36:18:05 N 140:18:10 E DP 36:25:01 N 140:11:39 E V D=+ V X=36:10.9245 N 140:24:52 E DB 36:26:46 N 140:11:57 E,36:29:53 N 140:25:00 E AC E AN Hyakuri TCA-22 AL 1500 FT AMSL AH 7000 FT AMSL DP 36:19:48 N 140:23:19 E DP 36:16:39 N 140:22:47 E DP 36:16.5912 N 140:22.5403 E DP 36:16.418 N 140:21.9724 E DP 36:16.208 N 140:21.424 E DP 36:15:58 N 140:20:54 E DP 36:15:41 N 140:20:24 E V X=36:10:54 N 140:24:53 E DB 36:18:05 N 140:18:10 E,36:19.7036 N 140:22:35 E DP 36:19.7036 N 140:22:35 E DP 36:19:48 N 140:23:19 E AC E AN Hyakuri TCA-23 AL 2500 FT AMSL AH 10000 FT AMSL DP 36:29:52 N 140:26:07 E DP 36:19:53 N 140:25:28 E DP 36:19:54 N 140:24:48 E DP 36:19.8708 N 140:24.0555 E DP 36:19:48 N 140:23:19 E DP 36:29:53 N 140:25:00 E DP 36:29:54 N 140:25:02 E DP 36:29:52 N 140:26:07 E AC E AN Hyakuri TCA-24 AL 1500 FT AMSL AH 10000 FT AMSL DP 36:23:18 N 140:34:54 E V D=- V X=36:10:54 N 140:24:53 E DB 36:15:56 N 140:28:56 E,36:16:47 N 140:23.3702 E DP 36:16:47 N 140:23.3702 E DP 36:16:39 N 140:22:47 E DP 36:19:48 N 140:23:19 E DP 36:19:52 N 140:23:59 E DP 36:19:54 N 140:24.7226 E DP 36:19:53 N 140:25:28 E DP 36:25:40 N 140:25:51 E DP 36:25.6733 N 140:25.9229 E DP 36:25:37 N 140:26:53 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:25:37 N 140:26:53 E,36:23:18 N 140:34:54 E AC E AN Hyakuri TCA-25 AL 2000 FT AMSL AH 10000 FT AMSL DP 36:32:53 N 140:50:28 E DP 36:21:42 N 140:37:24 E DP 36:21.923 N 140:37:07 E DP 36:22.421 N 140:36:23 E V D=- V X=36:10:54 N 140:24:53 E DB 36:22.421 N 140:36:23 E,36:25:40 N 140:25:51 E DP 36:25:40 N 140:25:51 E V D=+ V X=36:11:03 N 140:24.9026 E DB 36:34:51 N 140:26:27 E,36:31:00 N 140:41:08 E DP 36:31:00 N 140:41:08 E V X=36:10:54 N 140:24:53 E DB 36:36:09 N 140:45:19 E,36:33:38 N 140:49:28 E DP 36:33:38 N 140:49:28 E DP 36:32:53 N 140:50:28 E AC E AN Hyakuri TCA-26 AL 4000 FT AMSL AH 7000 FT AMSL DP 36:41:12 N 140:26:54 E V D=- V X=36:10:55 N 140:24.8721 E DB 36:29:53 N 140:25:00 E,36:26:46 N 140:11:57 E DP 36:26:46 N 140:11:57 E DP 36:34:29 N 140:13:17 E DP 36:41:14 N 140:25:36 E DP 36:41:12 N 140:26:54 E AC E AN Hyakuri TCA-27 AL 4000 FT AMSL AH 10000 FT AMSL DP 36:36:18 N 140:45:26 E V D=- V X=36:11:01 N 140:24:54 E DB 36:31:00 N 140:41:08 E,36:34:51 N 140:26:27 E DP 36:34:51 N 140:26:27 E DP 36:29:52 N 140:26:07 E DP 36:29.868 N 140:26:05 E DP 36:29:53 N 140:25:00 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:41:12 N 140:26:54 E,36:36:55 N 140:44:18 E DP 36:36:55 N 140:44:18 E DP 36:36:18 N 140:45:26 E AC E AN Hyakuri TCA-3 AL 1300 FT AMSL AH 3000 FT AMSL DP 36:04:53 N 140:27:03 E DP 35:57:32 N 140:29:39 E V D=- V X=36:02:06 N 140:11.569 E DB 36:00:23 N 140:17:23 E,36:07:05 N 140:11:34 E DP 36:07:05 N 140:11:34 E DP 36:07:05 N 140:15:14 E DP 36:04:53 N 140:27:03 E AC E AN Hyakuri TCA-4 AL 1500 FT AMSL AH 4000 FT AMSL DP 36:04:20 N 140:30:00 E DP 36:04:07 N 140:31:12 E DP 35:56:00 N 140:38:28 E DP 35:56:00 N 140:35:35 E DP 35:57:32 N 140:29:39 E DP 36:04:53 N 140:27:03 E DP 36:04:20 N 140:30:00 E AC E AN Hyakuri TCA-5 AL 1500 FT AMSL AH 5000 FT AMSL DP 35:56:00 N 140:47:46 E DP 35:56:00 N 140:38:28 E DP 36:04:07 N 140:31:12 E DP 36:02:50 N 140:38:03 E DP 35:56:00 N 140:47:46 E AC E AN Hyakuri TCA-6 AL 1500 FT AMSL AH 6000 FT AMSL DP 36:05:00 N 140:41:41 E DP 36:05:00 N 140:43:47 E DP 36:00:12 N 140:45:54 E DP 36:00:11 N 140:52:41 E DP 35:58:16 N 140:58:15 E DP 35:57.9249 N 140:58.052 E DP 35:56.9531 N 140:57.4393 E DP 35:56:00 N 140:56:47 E DP 35:56:00 N 140:47:46 E V D=- V X=36:10:54 N 140:24:53 E DB 36:01:51 N 140:39:24 E,36:04:18 N 140:41:18 E DP 36:04:18 N 140:41:18 E DP 36:05:00 N 140:41:41 E AC E AN Hyakuri TCA-7 AL 1300 FT AMSL AH 4000 FT AMSL DP 36:12:14 N 140:17:39 E DP 36:12:04 N 140:18:53 E DP 36:11:42 N 140:18:47 E DP 36:11.2571 N 140:18:43 E V D=- V X=36:10:54 N 140:24:53 E DB 36:11.2571 N 140:18:43 E,36:06:57 N 140:21:06 E DP 36:06:57 N 140:21:06 E DP 36:06:02 N 140:20:56 E DP 36:07:05 N 140:15:14 E DP 36:07:05 N 140:10:48 E DP 36:07:23 N 140:10:41 E V D=+ V X=36:10:54 N 140:24:53 E DB 36:09:09 N 140:17:47 E,36:11.7533 N 140:17:32 E DP 36:11.7533 N 140:17:32 E DP 36:12:14 N 140:17:39 E AC E AN Hyakuri TCA-8 AL 1300 FT AMSL AH 6000 FT AMSL DP 36:05:00 N 140:41:41 E DP 36:04:28 N 140:41.4018 E DP 36:03:47 N 140:40:58 E DP 36:03:07 N 140:40.4846 E DP 36:2.4706 N 140:39:58 E DP 36:01:51 N 140:39:24 E DP 36:02:50 N 140:38:03 E DP 36:06:02 N 140:20:56 E DP 36:06:57 N 140:21:06 E V D=- V X=36:10:54 N 140:24:53 E DB 36:06:57 N 140:21.1025 E,36:07:39 N 140:29:35 E DP 36:07:39 N 140:29:35 E DP 36:05:00 N 140:36:00 E DP 36:05:00 N 140:41:41 E AC E AN Hyakuri TCA-9 AL 1500 FT AMSL AH 8000 FT AMSL V X=36:10:54 N 140:24.8842 E DB 36:05:00 N 141:01:02 E,35:59:16 N 140:58:49 E DP 35:59:16 N 140:58:49 E DP 35:58:16 N 140:58:15 E DP 36:00:11 N 140:52:41 E DP 36:00:12 N 140:45:54 E DP 36:05:00 N 140:43:47 E DP 36:05:00 N 141:01:02 E AC E AN Iwakuni ACA-1 AL FL200 AH FL230 DP 35:03:32 N 132:13:14 E DP 34:49:02 N 131:28:58 E DP 34:50.1072 N 131:30.2191 E DP 34:51:04 N 131:31:36 E V X=34:08:27 N 132:13:57 E DB 34:51:04 N 131:31:36 E,35:03:32 N 132:13:14 E AC E AN Iwakuni ACA-10 AL 700 FT AMSL AH FL150 DP 33:53:35 N 132:11:20 E DP 34:02:01 N 132:16:42 E DP 34:03:56 N 132:31:11 E DP 34:04:27 N 132:35:03 E DP 34:09:38 N 133:14:10 E DP 34:8.22253 N 133:14:21 E DP 34:06:49 N 133:14.3074 E V X=34:08:27 N 132:13:57 E DB 34:06:49 N 133:14.3074 E,33:29:32 N 132:51:43 E DP 33:29:32 N 132:51:43 E DP 33:23:35 N 132:14:31 E DP 33:22:49 N 132:09:45 E DP 33:23:45 N 132:9.30692 E DP 33:24:39 N 132:08:47 E V D=- V X=33:13:13 N 131:42:12 E DB 33:24:39 N 132:08:47 E,33:31:15 N 132:02:54 E DP 33:31:15 N 132:02:54 E DP 33:44:08 N 132:06:44 E DP 33:48:17 N 132:07:58 E DP 33:53:35 N 132:11:20 E AC E AN Iwakuni ACA-2 AL FL140 AH FL230 DP 35:03:32 N 132:13:14 E DP 34:39:59 N 131:57:49 E DP 34:33:00 N 131:43:10 E DP 34:44:35 N 131:23:46 E DP 34:45.7878 N 131:24:50 E DP 34:46.8692 N 131:26.0692 E V X=34:08:27 N 132:13:57 E DB 34:46.8692 N 131:26.0692 E,35:03:32 N 132:13:14 E AC E AN Iwakuni ACA-3 AL 700 FT AMSL AH FL230 V X=34:08:27 N 132:13:57 E DB 35:03:32 N 132:13:14 E,34:59.8393 N 132:38:03 E DP 34:59.8393 N 132:38:03 E DP 34:59:31 N 132:38:55 E DP 34:54:37 N 132:35:42 E DP 34:50:26 N 132:32:23 E DP 34:46:04 N 132:30:06 E DP 34:16:32 N 132:10:47 E DP 34:33:00 N 131:43:10 E DP 34:39:59 N 131:57:49 E DP 35:03:32 N 132:13:14 E AC E AN Iwakuni ACA-4 AL FL150 AH FL230 DP 34:38:42 N 131:33:38 E V D=- V X=34:08:27 N 132:13:57 E DB 34:20:48 N 132:03:38 E,34:17:37 N 131:59.5723 E DP 34:17:37 N 131:59.5723 E DP 34:17:27 N 131:59:28 E DP 34:18:27 N 131:46:51 E DP 34:30:32 N 131:26:36 E DP 34:31.7207 N 131:27.3562 E DP 34:32:52 N 131:28:13 E V D=+ V X=34:08:27 N 132:13:57 E DB 34:32:52 N 131:28:13 E,34:38:42 N 131:33:38 E AC E AN Iwakuni ACA-5 AL FL150 AH FL230 DP 34:20:48 N 132:03:38 E DP 34:16:32 N 132:10:47 E DP 34:17:27 N 131:59:28 E DP 34:18.0738 N 132:0.0218656 E DP 34:18.6556 N 132:0.640667 E V X=34:08:27 N 132:13.9509 E DB 34:18.6556 N 132:0.640667 E,34:20:48 N 132:03:38 E AC E AN Iwakuni ACA-6 AL 700 FT AMSL AH 10000 FT AMSL DP 34:29:52 N 132:19:30 E V D=- V X=34:8.57411 N 132:14.0031 E DB 34:22:11 N 132:21:19 E,34:23:26 N 132:15:18 E DP 34:23:26 N 132:15:18 E DP 34:29:52 N 132:19:30 E AC E AN Iwakuni ACA-7A AL 700 FT AMSL AH 10000 FT AMSL DP 34:17:27 N 131:59:28 E DP 34:16:32 N 132:10:47 E V X=34:08:27 N 132:13:57 E DB 34:23:26 N 132:15:18 E,34:22:23 N 132:20:46 E DP 34:22:23 N 132:20:46 E DP 34:22:11 N 132:21:19 E DP 34:15:00 N 132:23:00 E DP 34:06:38 N 132:30:21 E DP 34:05:59 N 132:31:46 E DP 34:5.22212 N 132:31.6029 E DP 34:4.47172 N 132:31:23 E DP 34:03:56 N 132:31:11 E DP 34:02:01 N 132:16:42 E V X=34:08:27 N 132:13:57 E DB 33:53:35 N 132:11:20 E,34:17:23 N 131:59.3381 E DP 34:17:23 N 131:59.3381 E DP 34:17:27 N 131:59:28 E AC E AN Iwakuni ACA-7B AL FL150 AH FL150 DP 34:17:27 N 131:59:28 E DP 34:16:32 N 132:10:47 E V X=34:08:27 N 132:13:57 E DB 34:23:26 N 132:15:18 E,34:22:23 N 132:20:46 E DP 34:22:23 N 132:20:46 E DP 34:22:11 N 132:21:19 E DP 34:15:00 N 132:23:00 E DP 34:06:38 N 132:30:21 E DP 34:05:59 N 132:31:46 E DP 34:5.22212 N 132:31.6029 E DP 34:4.47172 N 132:31:23 E DP 34:03:56 N 132:31:11 E DP 34:02:01 N 132:16:42 E V X=34:08:27 N 132:13:57 E DB 33:53:35 N 132:11:20 E,34:17:23 N 131:59.3381 E DP 34:17:23 N 131:59.3381 E DP 34:17:27 N 131:59:28 E AC E AN Iwakuni ACA-8A AL 6000 FT AMSL AH 6000 FT AMSL V X=34:08:27 N 132:13:57 E DB 34:22:11 N 132:21:19 E,34:06:24 N 132:31:56 E DP 34:06:24 N 132:31:56 E DP 34:05:59 N 132:31:46 E DP 34:06:38 N 132:30:21 E DP 34:15:00 N 132:23:00 E DP 34:22:11 N 132:21:19 E AC E AN Iwakuni ACA-8B AL FL150 AH FL150 V X=34:08:27 N 132:13:57 E DB 34:22:11 N 132:21:19 E,34:06:24 N 132:31:56 E DP 34:06:24 N 132:31:56 E DP 34:05:59 N 132:31:46 E DP 34:06:38 N 132:30:21 E DP 34:15:00 N 132:23:00 E DP 34:22:11 N 132:21:19 E AC E AN Iwakuni ACA-9 AL 700 FT AMSL AH 10000 FT AMSL DP 34:05:59 N 132:31:46 E DP 34:04:27 N 132:35:03 E DP 34:03:56 N 132:31:11 E DP 34:04:41 N 132:31:27 E DP 34:05:26 N 132:31.6566 E DP 34:05:59 N 132:31:46 E AC E AN Iwoto ACA AL 700 FT AMSL AH FL200 V X=24:47:05 N 141:18:57 E DC 55 AC E AN Kagoshima ACA-1 AL 700 FT AMSL AH 10000 FT AMSL DP 32:03:25 N 130:21:42 E DP 32:12:35 N 130:38:28 E DP 32:11:13 N 131:03:21 E DP 32:06:02 N 130:59:34 E DP 32:01:25 N 130:59:02 E DP 32:03:25 N 130:21:42 E AC E AN Kagoshima ACA-2 AL 700 FT AMSL AH FL150 DP 32:03:25 N 130:21:42 E DP 32:01:25 N 130:59:02 E DP 32:06:02 N 130:59:34 E DP 32:11:13 N 131:03:21 E DP 32:36:37 N 131:22:01 E DP 32:39:07 N 131:48:28 E DP 32:38:36 N 131:50:02 E DP 32:38.0077 N 131:51.5571 E V X=31:52.7234 N 131:26:15 E DB 32:38.0077 N 131:51.5571 E,31:03:34 N 131:37:31 E DP 31:03:34 N 131:37:31 E DP 31:24:56 N 131:35:11 E DP 31:35:00 N 131:34:05 E DP 31:30:45 N 131:12:20 E DP 31:33:41 N 131:11:33 E V X=31:47:51 N 130:43:33 E DB 31:21:05 N 130:08:42 E,32:03:34 N 130:00:15 E DP 32:03:34 N 130:00:15 E DP 32:04:27 N 130:00:46 E DP 32:03:25 N 130:21:42 E AC E AN Kagoshima ACA-3 AL 5000 FT AMSL AH FL150 DP 31:21:05 N 130:08:42 E DP 31:33:41 N 131:11:33 E DP 31:30:45 N 131:12:20 E DP 31:25:33 N 130:46:01 E V X=31:47:51 N 130:43:33 E DB 31:08:29 N 130:52:23 E,31:20.4526 N 130:09:13 E DP 31:20.4526 N 130:09:13 E DP 31:21:05 N 130:08:42 E AC E AN Kagoshima ACA-4 AL 6000 FT AMSL AH FL150 DP 31:30:45 N 131:12:20 E DP 31:35:00 N 131:34:05 E DP 31:24:56 N 131:35:11 E DP 31:21:49 N 131:19:10 E DP 31:20.8051 N 131:18.2711 E DP 31:19.8867 N 131:17.2513 E V X=31:47:51 N 130:43:33 E DB 31:19.8867 N 131:17.2513 E,31:08:29 N 130:52:23 E DP 31:08:29 N 130:52:23 E DP 31:25:33 N 130:46:01 E DP 31:30:45 N 131:12:20 E AC E AN Kagoshima TCA-E1 AL 7000 FT AMSL AH 10000 FT AMSL DP 32:16:37 N 131:07:17 E DP 32:17.2239 N 131:08:20 E DP 32:17.7734 N 131:9.42064 E V X=31:52.7227 N 131:26:15 E DB 32:17.7734 N 131:9.42064 E,32:20:26 N 131:16:53 E DP 32:20:26 N 131:16:53 E V D=- V X=31:52.7233 N 131:26:15 E DB 32:16:10 N 131:18:20 E,32:0.368708 N 130:58:58 E DP 32:0.368708 N 130:58:58 E DP 31:59:40 N 130:58:50 E DP 32:01:25 N 130:59:02 E DP 32:02:48 N 130:59:12 E DP 32:06:02 N 130:59:34 E DP 32:16:37 N 131:07:17 E AC E AN Kagoshima TCA-E10 AL 2700 FT AMSL AH 10000 FT AMSL V D=- V X=31:52:38 N 131:26:55 E DB 31:54:53 N 131:21:40 E,31:53:05 N 131:21:04 E DP 31:53:05 N 131:21:04 E DP 31:52:38 N 131:21:03 E DP 31:52:32 N 131:14:30 E DP 31:52:44 N 131:14:30 E DP 31:53.3571 N 131:14.5176 E V D=+ V X=31:52.7233 N 131:26:15 E DB 31:53.3571 N 131:14.5176 E,31:57:34 N 131:15:58 E DP 31:57:34 N 131:15:58 E DP 31:54:53 N 131:21:40 E AC E AN Kagoshima TCA-E11 AL 3001 FT AMSL AH 10000 FT AMSL V X=31:52:38 N 131:26:55 E DC 5 AC E AN Kagoshima TCA-E12 AL 2701 FT AMSL AH 10000 FT AMSL DP 31:56:04 N 131:31:12 E DP 31:57:06 N 131:43:52 E DP 31:51:06 N 131:44:30 E V D=- V X=31:52:38 N 131:26.9378 E DB 31:50:04 N 131:31:58 E,31:56:04 N 131:31:12 E AC E AN Kagoshima TCA-E13 AL 7000 FT AMSL AH 10000 FT AMSL DP 31:57:36 N 131:03:19 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:57:29 N 131:03:54 E,31:53:07 N 131:3.22076 E DP 31:53:07 N 131:3.22076 E DP 31:52:21 N 131:03:14 E V X=31:52.7181 N 131:26.1846 E DB 31:52:26 N 131:08:38 E,31:47:53 N 131:09:35 E DP 31:47:53 N 131:09:35 E DP 31:51:08 N 131:02:34 E DP 31:57:36 N 131:03:19 E AC E AN Kagoshima TCA-E14 AL 5000 FT AMSL AH 10000 FT AMSL DP 31:52:26 N 131:08:38 E DP 31:52:32 N 131:14:30 E DP 31:52:38 N 131:21:03 E DP 31:52.3568 N 131:21.0233 E DP 31:51:55 N 131:21:05 E V D=- V X=31:52:38 N 131:26:55 E DB 31:51:55 N 131:21:05 E,31:47:56 N 131:24:52 E DP 31:47:56 N 131:24:52 E DP 31:43:00 N 131:23:25 E DP 31:41:39 N 131:23:01 E V D=+ V X=31:52.7181 N 131:26.1846 E DB 31:47:53 N 131:09:35 E,31:52:26 N 131:08:38 E AC E AN Kagoshima TCA-E15 AL 3500 FT AMSL AH 10000 FT AMSL V D=- V X=31:52:38 N 131:26:55 E DB 31:47:56 N 131:24:52 E,31:47:56 N 131:28:58 E DP 31:47:56 N 131:28:58 E DP 31:43:43 N 131:31:23 E DP 31:43.4514 N 131:30.7083 E DP 31:43:14 N 131:30:01 E V D=+ V X=31:52.7233 N 131:26:15 E DB 31:43:14 N 131:30:01 E,31:43:00 N 131:23:25 E DP 31:43:00 N 131:23:25 E DP 31:47:56 N 131:24:52 E AC E AN Kagoshima TCA-E16 AL 4900 FT AMSL AH 10000 FT AMSL V D=- V X=31:52.7233 N 131:26:15 E DB 31:43:00 N 131:23:25 E,31:43.4532 N 131:30:43 E DP 31:43.4532 N 131:30:43 E DP 31:43:43 N 131:31:23 E DP 31:26:48 N 131:40:59 E DP 31:26.3388 N 131:39:51 E DP 31:25:56 N 131:38.6864 E DP 31:25.5522 N 131:37.508 E DP 31:25:13 N 131:36:19 E DP 31:24:56 N 131:35:11 E DP 31:35:00 N 131:34:05 E DP 31:36:36 N 131:33:55 E DP 31:41:39 N 131:23:01 E DP 31:43:00 N 131:23:25 E AC E AN Kagoshima TCA-E17 AL 1600 FT AMSL AH 10000 FT AMSL V X=31:52:46 N 131:26.2743 E DB 32:18:20 N 131:41:47 E,31:26:48 N 131:40:59 E DP 31:26:48 N 131:40:59 E DP 31:43:43 N 131:31:23 E V D=- V X=31:52:38 N 131:26:55 E DB 31:47:56 N 131:28:58 E,31:49.8406 N 131:31:49 E DP 31:49.8406 N 131:31:49 E DP 31:50:04 N 131:31:58 E DP 31:51:06 N 131:44:30 E DP 31:57:06 N 131:43:52 E V X=31:52:39 N 131:26.9236 E DB 31:56:04 N 131:31:12 E,31:57:18 N 131:29:02 E DP 31:57:18 N 131:29:02 E DP 32:02:48 N 131:32:22 E DP 32:10:10 N 131:36:50 E DP 32:18:20 N 131:41:47 E AC E AN Kagoshima TCA-E2 AL 6000 FT AMSL AH 10000 FT AMSL V X=31:52.7233 N 131:26:15 E DB 32:20:26 N 131:16:53 E,32:20:42 N 131:34:28 E DP 32:20:42 N 131:34:28 E DP 32:20:41 N 131:34:28 E DP 32:11:46 N 131:31:51 E DP 32:11.9679 N 131:30:50 E DP 32:12.1238 N 131:29:48 E V D=- V X=31:52.723 N 131:26:15 E DB 32:12.1238 N 131:29:48 E,32:11:36 N 131:19:53 E DP 32:11:36 N 131:19:53 E DP 32:16:10 N 131:18:20 E DP 32:20:26 N 131:16:53 E AC E AN Kagoshima TCA-E3 AL 3500 FT AMSL AH 10000 FT AMSL V X=31:52.7233 N 131:26:15 E DB 32:20:41 N 131:34:28 E,32:18.4381 N 131:41:36 E DP 32:18.4381 N 131:41:36 E DP 32:18:20 N 131:41:47 E DP 32:10:10 N 131:36:50 E DP 32:10:34 N 131:35:54 E DP 32:10:55 N 131:34.9376 E V D=- V X=31:52.7217 N 131:26:15 E DB 32:10:55 N 131:34.9376 E,32:11:46 N 131:31:51 E DP 32:11:46 N 131:31:51 E DP 32:20:41 N 131:34:28 E AC E AN Kagoshima TCA-E4 AL 5200 FT AMSL AH 10000 FT AMSL DP 32:11:46 N 131:31:51 E V D=- V X=32:05:01 N 131:27:05 E DB 32:08:47 N 131:30:58 E,32:06:33 N 131:21:28 E DP 32:06:33 N 131:21:28 E V X=31:52.7237 N 131:26:15 E DB 32:06:07 N 131:21:20 E,32:00:11 N 131:12:15 E DP 32:00:11 N 131:12:15 E DP 31:59:31 N 131:11:51 E V X=31:52.7236 N 131:26:15 E DB 32:02:13 N 131:06:05 E,31:58.3385 N 131:04:10 E DP 31:58.3385 N 131:04:10 E DP 31:57:29 N 131:03:54 E DP 31:57:36 N 131:03:19 E DP 31:59:40 N 130:58:50 E DP 32:0.368708 N 130:58:58 E DP 32:01:18 N 130:59:21 E V D=+ V X=31:52.7233 N 131:26:15 E DB 32:01:18 N 130:59:21 E,32:16:10 N 131:18:20 E DP 32:16:10 N 131:18:20 E V X=31:52.7237 N 131:26:15 E DB 32:11:36 N 131:19:53 E,32:11.9679 N 131:30:50 E DP 32:11.9679 N 131:30:50 E DP 32:11:46 N 131:31:51 E AC E AN Kagoshima TCA-E5 AL 2500 FT AMSL AH 10000 FT AMSL V X=31:52.7233 N 131:26:15 E DB 32:11:46 N 131:31:51 E,32:10.2181 N 131:36.7406 E DP 32:10.2181 N 131:36.7406 E DP 32:10:10 N 131:36:50 E DP 32:02:48 N 131:32:22 E DP 32:3.20692 N 131:32.5844 E DP 32:03:38 N 131:32.7533 E V D=- V X=32:05:01 N 131:27:05 E DB 32:03:38 N 131:32.7533 E,32:08:47 N 131:30:58 E DP 32:08:47 N 131:30:58 E DP 32:11:46 N 131:31:51 E AC E AN Kagoshima TCA-E6 AL 4200 FT AMSL AH 10000 FT AMSL DP 31:57:29 N 131:03:54 E DP 31:58.3385 N 131:04:10 E DP 31:59:11 N 131:4.48484 E V X=31:52.723 N 131:26:15 E DB 31:59:11 N 131:4.48484 E,32:02:13 N 131:06:05 E DP 32:02:13 N 131:06:05 E DP 31:59:31 N 131:11:51 E DP 32:00:11 N 131:12:15 E DP 32:0.807717 N 131:12.7393 E V X=31:52.723 N 131:26:15 E DB 32:0.807717 N 131:12.7393 E,32:06:07 N 131:21:20 E V D=- V X=32:5.01802 N 131:27:04 E DB 32:06:07 N 131:21:20 E,32:03:59 N 131:21:19 E V X=31:52.7233 N 131:26:15 E DB 32:03:59 N 131:21:19 E,31:56.1741 N 131:12:42 E DP 31:56.1741 N 131:12:42 E DP 31:55:39 N 131:12:34 E DP 31:57:29 N 131:03:54 E AC E AN Kagoshima TCA-E7 AL 3000 FT AMSL AH 10000 FT AMSL DP 31:57:29 N 131:03:54 E V X=31:52.7233 N 131:26:15 E DB 31:55:39 N 131:12:34 E,31:58:14 N 131:13.7175 E DP 31:58:14 N 131:13.7175 E DP 31:58:32 N 131:13:55 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:57:34 N 131:15:58 E,31:52:44 N 131:14:30 E DP 31:52:44 N 131:14:30 E DP 31:52:32 N 131:14:30 E DP 31:52:26 N 131:08:38 E DP 31:52:21 N 131:03:14 E DP 31:53:14 N 131:3.22386 E DP 31:54:07 N 131:3.27273 E V D=+ V X=31:52.7233 N 131:26:15 E DB 31:54:07 N 131:3.27273 E,31:57:29 N 131:03:54 E AC E AN Kagoshima TCA-E8 AL 6001 FT AMSL AH 10000 FT AMSL V X=32:05:01 N 131:27:05 E DC 5 AC E AN Kagoshima TCA-E9 AL 2500 FT AMSL AH 10000 FT AMSL V D=- V X=32:05:01 N 131:27:05 E DB 32:03:59 N 131:21:19 E,32:02:48 N 131:32:22 E DP 32:02:48 N 131:32:22 E V X=31:52:38 N 131:26:55 E DB 31:57:18 N 131:29:02 E,31:55:04 N 131:21.7679 E DP 31:55:04 N 131:21.7679 E DP 31:54:53 N 131:21:40 E DP 31:57:34 N 131:15:58 E DP 31:58:32 N 131:13:55 E DP 31:59:09 N 131:14.2902 E DP 31:59.7243 N 131:14:45 E V D=+ V X=31:52.7229 N 131:26:15 E DB 31:59.7243 N 131:14:45 E,32:03:59 N 131:21:19 E AC E AN Kagoshima TCA-W1 AL 7000 FT AMSL AH 10000 FT AMSL DP 32:04:27 N 130:00:46 E V D=- V X=31:47:51 N 130:43:33 E DB 32:03:49 N 130:13:41 E,31:57:55 N 130:10.3221 E DP 31:57:55 N 130:10.3221 E DP 31:57:32 N 130:10:12 E DP 32:00:46 N 129:59:05 E DP 32:01:58 N 129:59.5553 E DP 32:3.14059 N 130:00:06 E DP 32:4.30131 N 130:0.687572 E DP 32:04:27 N 130:00:46 E AC E AN Kagoshima TCA-W10 AL 5000 FT AMSL AH 10000 FT AMSL DP 31:25:46 N 130:32:06 E V D=- V X=31:47:51 N 130:43:33 E DB 31:37:46 N 130:38:19 E,31:36:51 N 130:42.8406 E DP 31:36:51 N 130:42.8406 E DP 31:36:50 N 130:43:20 E DP 31:31:49 N 130:43:13 E DP 31:27:59 N 130:43:09 E DP 31:25:46 N 130:32:06 E AC E AN Kagoshima TCA-W11 AL 6001 FT AMSL AH 10000 FT AMSL DP 31:45:28 N 130:48:05 E DP 31:43:56 N 130:49:17 E DP 31:42:16 N 130:50:34 E V X=31:38.6344 N 130:50.5191 E DB 31:39:45 N 130:52:31 E,31:37:31 N 130:48:31 E DP 31:37:31 N 130:48:31 E DP 31:37:39 N 130:48:25 E DP 31:40:04 N 130:46:38 E DP 31:41:44 N 130:45:21 E DP 31:43:16 N 130:44:09 E DP 31:45:59 N 130:42:10 E DP 31:48:01 N 130:46:06 E DP 31:45:28 N 130:48:05 E AC E AN Kagoshima TCA-W12 AL 4000 FT AMSL AH 10000 FT AMSL V D=- V X=31:47:51 N 130:43:33 E DB 31:36:50 N 130:43:20 E,31:37:29 N 130:47.922 E DP 31:37:29 N 130:47.922 E DP 31:37:39 N 130:48:25 E DP 31:37:31 N 130:48:31 E DP 31:37:17 N 130:48:43 E V X=31:38.6344 N 130:50:31 E DB 31:37:17 N 130:48:43 E,31:36:39 N 130:49:55 E DP 31:36:39 N 130:49:55 E DP 31:33:26 N 130:51:45 E DP 31:33.0859 N 130:50.9039 E DP 31:32:48 N 130:50:02 E V D=+ V X=31:47:51 N 130:43:33 E DB 31:32:48 N 130:50:02 E,31:31:49 N 130:43:13 E DP 31:31:49 N 130:43:13 E DP 31:36:50 N 130:43:20 E AC E AN Kagoshima TCA-W13 AL 5200 FT AMSL AH 10000 FT AMSL DP 31:33:26 N 130:51:45 E DP 31:30:06 N 130:53:39 E DP 31:27:59 N 130:43:09 E V D=- V X=31:47:51 N 130:43:33 E DB 31:31:49 N 130:43:13 E,31:33.0859 N 130:50.9039 E DP 31:33.0859 N 130:50.9039 E DP 31:33:26 N 130:51:45 E AC E AN Kagoshima TCA-W14 AL 3100 FT AMSL AH 10000 FT AMSL V D=- V X=31:38:38 N 130:50:31 E DB 31:36:39 N 130:49:55 E,31:39.7079 N 130:52:34 E DP 31:39.7079 N 130:52:34 E DP 31:39:45 N 130:52:31 E DP 31:42:16 N 130:50:34 E DP 31:43:56 N 130:49:17 E DP 31:45:28 N 130:48:05 E V X=31:48:12 N 130:43:10 E DB 31:45:28 N 130:48:05 E,31:48.435 N 130:49.0365 E DP 31:48.435 N 130:49.0365 E DP 31:48:48 N 130:48:59 E DP 31:50:26 N 130:58:31 E V D=+ V X=31:47:51 N 130:43:33 E DB 31:50:26 N 130:58:32 E,31:45.4205 N 130:58:34 E DP 31:45.4205 N 130:58:34 E DP 31:45:07 N 130:58:29 E DP 31:41:28 N 131:05:47 E DP 31:40.6068 N 131:5.49105 E DP 31:39:47 N 131:5.08737 E V X=31:47:51 N 130:43:33 E DB 31:39:47 N 131:5.08737 E,31:30:22 N 130:55:00 E DP 31:30:22 N 130:55:00 E DP 31:30:06 N 130:53:39 E DP 31:33:26 N 130:51:45 E DP 31:36:39 N 130:49:55 E AC E AN Kagoshima TCA-W15 AL 4001 FT AMSL AH 10000 FT AMSL DP 31:50:26 N 130:58:31 E DP 31:51:08 N 131:02:34 E DP 31:49:05 N 131:06:58 E DP 31:48:30 N 131:7.01881 E DP 31:47.6026 N 131:07:02 E V X=31:47:51 N 130:43:33 E DB 31:47.6026 N 131:07:02 E,31:41:28 N 131:05:47 E DP 31:41:28 N 131:05:47 E DP 31:45:07 N 130:58:29 E DP 31:45.4205 N 130:58:34 E DP 31:46:08 N 130:58:42 E V D=- V X=31:47:51 N 130:43:33 E DB 31:46:08 N 130:58:42 E,31:50:26 N 130:58:32 E DP 31:50:26 N 130:58:32 E DP 31:50:26 N 130:58:31 E AC E AN Kagoshima TCA-W16 AL 5000 FT AMSL AH 10000 FT AMSL DP 31:49:05 N 131:06:58 E DP 31:46:22 N 131:12:51 E DP 31:45.3693 N 131:12.7843 E DP 31:44:23 N 131:12.6416 E V X=31:47:51 N 130:43:33 E DB 31:44:23 N 131:12.6416 E,31:35:17 N 131:08:55 E DP 31:35:17 N 131:08:55 E V D=- V X=31:47:51 N 130:43:33 E DB 31:37:48 N 131:03:50 E,31:48:56 N 131:07:01 E DP 31:48:56 N 131:07:01 E DP 31:49:05 N 131:06:58 E AC E AN Kagoshima TCA-W17 AL 5001 FT AMSL AH 10000 FT AMSL DP 31:46:22 N 131:12:51 E DP 31:43:47 N 131:18:25 E DP 31:42:59 N 131:18:19 E DP 31:41.903 N 131:18:05 E V X=31:47:51 N 130:43:33 E DB 31:41.903 N 131:18:05 E,31:32:45 N 131:13:57 E DP 31:32:45 N 131:13:57 E V D=- V X=31:47:51 N 130:43:33 E DB 31:35:17 N 131:08:55 E,31:45.3693 N 131:12.7843 E DP 31:45.3693 N 131:12.7843 E DP 31:46:22 N 131:12:51 E AC E AN Kagoshima TCA-W18 AL 4000 FT AMSL AH 10000 FT AMSL DP 31:37:48 N 131:03:50 E DP 31:35:17 N 131:08:55 E DP 31:32:45 N 131:13:57 E DP 31:31:49 N 131:13.2876 E DP 31:30:54 N 131:12:35 E DP 31:30:47 N 131:12:29 E DP 31:30:45 N 131:12:20 E DP 31:33:41 N 131:11:33 E V D=- V X=31:47:51 N 130:43:33 E DB 31:30:22 N 130:55:00 E,31:37:02 N 131:03:21 E DP 31:37:02 N 131:03:21 E DP 31:37:48 N 131:03:50 E AC E AN Kagoshima TCA-W19 AL 6000 FT AMSL AH 10000 FT AMSL DP 31:43:47 N 131:18:25 E DP 31:36:36 N 131:33:55 E DP 31:35:00 N 131:34:05 E V D=- V X=31:47:51 N 130:43:33 E DB 31:30:47 N 131:12:29 E,31:42.8357 N 131:18:18 E DP 31:42.8357 N 131:18:18 E DP 31:43:47 N 131:18:25 E AC E AN Kagoshima TCA-W2 AL 5000 FT AMSL AH 10000 FT AMSL DP 32:03:49 N 130:13:41 E DP 32:03:25 N 130:21:42 E DP 32:12:35 N 130:38:28 E DP 32:12:12 N 130:45:34 E DP 32:00:51 N 130:44:38 E DP 32:00:47 N 130:45:29 E DP 32:0.668365 N 130:46.3214 E DP 32:0.518278 N 130:47.1539 E DP 32:00:29 N 130:47:15 E DP 31:52:57 N 130:45:03 E DP 31:53.0738 N 130:44:33 E DP 31:53:10 N 130:44:02 E DP 31:53.2041 N 130:43.5018 E DP 31:53:12 N 130:43:26 E DP 32:00:52 N 130:43:17 E V D=- V X=31:47:51 N 130:43:33 E DB 32:05:53 N 130:43:11 E,31:54.4577 N 130:23:48 E DP 31:54.4577 N 130:23:48 E DP 31:53:40 N 130:23:33 E DP 31:57:32 N 130:10:12 E DP 31:58.5718 N 130:10.6058 E DP 31:59.5873 N 130:11.0864 E V D=+ V X=31:47:51 N 130:43.5511 E DB 31:59.5873 N 130:11.0864 E,32:03:49 N 130:13:41 E AC E AN Kagoshima TCA-W20 AL 6000 FT AMSL AH 10000 FT AMSL DP 32:00:46 N 129:59:05 E DP 31:57:32 N 130:10:12 E DP 31:56:31 N 130:9.72386 E DP 31:55:28 N 130:09:23 E V D=- V X=31:47:51 N 130:43:33 E DB 31:55:28 N 130:09:23 E,31:23:50 N 130:22:26 E DP 31:23:50 N 130:22:26 E DP 31:25:46 N 130:32:06 E DP 31:27:59 N 130:43:09 E DP 31:30:06 N 130:53:39 E DP 31:30:22 N 130:55:00 E DP 31:33:41 N 131:11:33 E DP 31:30:45 N 131:12:20 E DP 31:25:33 N 130:46:01 E V D=+ V X=31:47:51 N 130:43:33 E DB 31:08:29 N 130:52:23 E,31:34:23 N 129:59.1892 E DP 31:34:23 N 129:59.1892 E DP 31:34:50 N 129:59:13 E DP 31:35:21 N 129:59:57 E V D=- V X=31:47:24 N 129:47:12 E DB 31:35:21 N 129:59:57 E,32:00:14 N 129:58:52 E DP 32:00:14 N 129:58:52 E DP 32:00:46 N 129:59:05 E AC E AN Kagoshima TCA-W21 AL 6000 FT AMSL AH 10000 FT AMSL DP 31:30:45 N 131:12:20 E DP 31:35:00 N 131:34:05 E DP 31:24:56 N 131:35:11 E DP 31:21:49 N 131:19:10 E DP 31:20.8051 N 131:18.2711 E DP 31:19.8867 N 131:17.2513 E V X=31:47:51 N 130:43:33 E DB 31:19.8867 N 131:17.2513 E,31:08:29 N 130:52:23 E DP 31:08:29 N 130:52:23 E DP 31:25:33 N 130:46:01 E DP 31:30:45 N 131:12:20 E AC E AN Kagoshima TCA-W3 AL 6001 FT AMSL AH 10000 FT AMSL DP 32:12:12 N 130:45:34 E DP 32:11:55 N 130:50:37 E DP 32:07:18 N 130:49:15 E DP 32:00:29 N 130:47:15 E DP 32:0.518278 N 130:47.1539 E DP 32:0.668365 N 130:46.3214 E DP 32:00:47 N 130:45:29 E DP 32:00:51 N 130:44:38 E DP 32:12:12 N 130:45:34 E AC E AN Kagoshima TCA-W4 AL 7000 FT AMSL AH 10000 FT AMSL V X=31:47:51 N 130:43:33 E DB 32:07:18 N 130:49:15 E,32:03:18 N 130:58:36 E DP 32:03:18 N 130:58:36 E DP 32:02:48 N 130:59:12 E DP 31:59:40 N 130:58:50 E DP 31:57:36 N 131:03:19 E DP 31:51:08 N 131:02:34 E DP 31:48:48 N 130:48:59 E DP 31:49:15 N 130:48.9352 E DP 31:49:41 N 130:48.8027 E V D=- V X=31:48:12 N 130:43:10 E DB 31:49:41 N 130:48.8027 E,31:52:57 N 130:45:03 E DP 31:52:57 N 130:45:03 E DP 32:00:29 N 130:47:15 E DP 32:07:18 N 130:49:15 E AC E AN Kagoshima TCA-W5 AL 4001 FT AMSL AH 10000 FT AMSL DP 31:45:03 N 130:11:22 E DP 31:44:04 N 130:26:54 E V X=31:47:51 N 130:43:33 E DB 31:25:46 N 130:19:43 E,31:38:30 N 130:10:03 E DP 31:38:30 N 130:10:03 E DP 31:39:01 N 130:09:56 E DP 31:45:03 N 130:11:22 E AC E AN Kagoshima TCA-W6 AL 3500 FT AMSL AH 10000 FT AMSL DP 31:57:32 N 130:10:12 E DP 31:53:40 N 130:23:33 E DP 31:54.257 N 130:23:44 E DP 31:55:03 N 130:24.1052 E V X=31:47:51 N 130:43:33 E DB 31:55:03 N 130:24.1052 E,32:04:03 N 130:34:16 E DP 32:04:03 N 130:34:16 E DP 31:59:33 N 130:36:51 E DP 31:59:49 N 130:37:30 E DP 32:00:05 N 130:38.2882 E V X=31:47:51 N 130:43:33 E DB 32:00:05 N 130:38.2882 E,32:00:52 N 130:43:17 E DP 32:00:52 N 130:43:17 E V D=- V X=31:48:12 N 130:43:10 E DB 31:53:12 N 130:43:26 E,31:47.9248 N 130:37.2864 E DP 31:47.9248 N 130:37.2864 E DP 31:47:29 N 130:37:22 E DP 31:47:04 N 130:30:40 E V X=31:47:51 N 130:43:33 E DB 31:47:04 N 130:30:37 E,31:37:46 N 130:38:19 E DP 31:37:46 N 130:38:19 E DP 31:25:46 N 130:32:06 E DP 31:23:50 N 130:22:26 E DP 31:24.3391 N 130:21:40 E DP 31:25:02 N 130:20.6698 E DP 31:25:46 N 130:19:43 E DP 31:44:04 N 130:26:54 E DP 31:45:03 N 130:11:22 E DP 31:39:01 N 130:09:56 E DP 31:39.2389 N 130:09:51 E DP 31:40.2912 N 130:09:30 E V D=+ V X=31:47:51 N 130:43:33 E DB 31:40.2912 N 130:09:30 E,31:57:32 N 130:10:12 E AC E AN Kagoshima TCA-W7 AL 7000 FT AMSL AH 10000 FT AMSL V D=- V X=31:47:51 N 130:43:33 E DB 32:00:52 N 130:43:17 E,31:59:49 N 130:37:30 E DP 31:59:49 N 130:37:30 E DP 31:59:33 N 130:36:51 E DP 32:04:03 N 130:34:16 E DP 32:4.42338 N 130:35:10 E DP 32:4.7403 N 130:36:06 E V D=+ V X=31:47:51 N 130:43:33 E DB 32:4.7403 N 130:36:06 E,32:05:53 N 130:43:11 E DP 32:05:53 N 130:43:11 E DP 32:00:52 N 130:43:17 E AC E AN Kagoshima TCA-W8 AL 3001 FT AMSL AH 10000 FT AMSL V X=31:48:12 N 130:43:10 E DB 31:43:16 N 130:44:09 E,31:45.4887 N 130:48:07 E DP 31:45.4887 N 130:48:07 E DP 31:45:28 N 130:48:05 E DP 31:48:01 N 130:46:06 E DP 31:45:59 N 130:42:10 E DP 31:43:16 N 130:44:09 E AC E AN Kagoshima TCA-W9 AL 3100 FT AMSL AH 10000 FT AMSL DP 31:47:29 N 130:37:22 E DP 31:47.041 N 130:37.4397 E DP 31:46:37 N 130:37.5845 E V D=- V X=31:48:12 N 130:43:10 E DB 31:46:37 N 130:37.5845 E,31:43:16 N 130:44:09 E DP 31:43:16 N 130:44:09 E DP 31:41:44 N 130:45:21 E DP 31:40:04 N 130:46:38 E V D=+ V X=31:47:51 N 130:43:33 E DB 31:37:39 N 130:48:25 E,31:46:52 N 130:30.651 E DP 31:46:52 N 130:30.651 E DP 31:47:29 N 130:37:22 E AC E AN Kansai ACA-1 AL 700 FT AMSL AH 9000 FT AMSL DP 35:03:15 N 134:00:05 E DP 35:3.26859 N 134:0.521469 E DP 35:03:16 N 134:01:42 E V X=34:40:17 N 134:00:54 E DB 35:03:16 N 134:01:42 E,34:59:37 N 134:16:03 E DP 34:59:37 N 134:16:03 E V D=- V X=34:25.9532 N 135:14.7031 E DB 34:56:03 N 133:58:24 E,34:41:57 N 133:52:27 E DP 34:41:57 N 133:52:27 E DP 34:36:03 N 133:33:24 E DP 34:40:00 N 133:35:00 E DP 34:40:20 N 133:34:22 E V D=+ V X=34:45.0233 N 133:50.1033 E DB 34:44:41 N 133:25:47 E,35:3.60375 N 133:59:05 E DP 35:3.60375 N 133:59:05 E DP 35:03:15 N 134:00:05 E AC E AN Kansai ACA-10 AL 6000 FT AMSL AH FL150 DP 33:37:02 N 134:19:00 E DP 33:36:07 N 134:40:43 E DP 33:34:46 N 134:38:38 E DP 33:35:45 N 134:19:00 E DP 33:37:02 N 134:19:00 E AC E AN Kansai ACA-11 AL 700 FT AMSL AH FL200 DP 34:48:56 N 135:07:39 E DP 34:33:25 N 135:25:29 E DP 33:53:10 N 135:16:14 E DP 33:52:03 N 135:13:43 E DP 33:52.0226 N 135:13:39 E V D=- V X=33:39:41 N 135:21:34 E DB 33:52.0226 N 135:13:39 E,33:42:04 N 135:05:00 E DP 33:42:04 N 135:05:00 E DP 33:46:36 N 135:05:00 E DP 33:55:51 N 135:09:41 E DP 34:13:00 N 134:50:28 E DP 34:13:00 N 134:28:35 E DP 34:22:32 N 134:25:24 E DP 34:47:13 N 134:58:44 E DP 34:48:56 N 135:07:39 E AC E AN Kansai ACA-12 AL 5000 FT AMSL AH FL200 DP 34:13:00 N 134:28:35 E V X=34:07:47 N 134:36.5375 E DB 34:13:00 N 134:38:38 E,34:05:27 N 134:42:32 E DP 34:05:27 N 134:42:32 E DP 33:58:37 N 134:38:56 E DP 33:58:27 N 134:33:23 E DP 34:13:00 N 134:28:35 E AC E AN Kansai ACA-13 AL 3000 FT AMSL AH FL200 DP 34:13:00 N 134:38:38 E DP 34:13:00 N 134:50:28 E DP 33:55:51 N 135:09:41 E DP 33:46:36 N 135:05:00 E DP 33:43:23 N 135:05:00 E DP 33:58:37 N 134:38:56 E V D=- V X=34:07:47 N 134:36.5377 E DB 34:05:27 N 134:42:32 E,34:13:00 N 134:38:38 E AC E AN Kansai ACA-14 AL 6000 FT AMSL AH FL200 DP 33:58:27 N 134:33:23 E DP 33:58:37 N 134:38:56 E DP 33:43:23 N 135:05:00 E DP 33:35:00 N 135:05:00 E DP 33:36:07 N 134:40:43 E DP 33:58:27 N 134:33:23 E AC E AN Kansai ACA-15 AL 700 FT AMSL AH 12000 FT AMSL DP 35:05:46 N 134:48:08 E DP 35:11.0742 N 135:18.0209 E DP 35:05:05 N 135:49:31 E DP 35:03:09 N 135:48:56 E DP 35:01:37 N 135:48.3037 E DP 35:00:19 N 135:48:12 E DP 34:58:51 N 135:47.7247 E DP 34:57.6208 N 135:47:36 E DP 34:56.6343 N 135:47:34 E DP 34:48:56 N 135:07:39 E DP 35:05:46 N 134:48:08 E AC E AN Kansai ACA-16 AL 700 FT AMSL AH FL160 DP 34:56:33 N 135:07:39 E DP 34:40:19 N 136:07:39 E DP 34:39:14 N 136:05:25 E DP 34:33:25 N 135:25:29 E DP 34:48:56 N 135:07:39 E DP 34:56:33 N 135:07:39 E AC E AN Kansai ACA-17 AL 700 FT AMSL AH FL180 DP 34:40:19 N 136:07:39 E DP 34:33:22 N 136:16:11 E DP 34:33:09 N 136:16.1532 E DP 34:32.2513 N 136:16:07 E V D=- V X=34:32:00 N 136:40:20 E DB 34:32.2513 N 136:16:07 E,34:26:57 N 136:16:55 E DP 34:26:57 N 136:16:55 E DP 34:26.2218 N 136:16:34 E DP 34:25:00 N 136:15:46 E V D=+ V X=34:48:20 N 135:24:13 E DB 34:25:00 N 136:15:46 E,34:14:57 N 136:06:47 E DP 34:14:57 N 136:06:47 E DP 34:09:13 N 135:52:46 E DP 33:53:10 N 135:16:14 E DP 34:33:25 N 135:25:29 E DP 34:39:14 N 136:05:25 E DP 34:40:19 N 136:07:39 E AC E AN Kansai ACA-18 AL 5000 FT AMSL AH FL180 V X=34:32:00 N 136:40:20 E DB 34:26:57 N 136:16:55 E,34:33:09 N 136:16.1532 E DP 34:33:09 N 136:16.1532 E DP 34:33:22 N 136:16:11 E DP 34:31:00 N 136:19:05 E DP 34:26:57 N 136:16:55 E AC E AN Kansai ACA-2 AL 6000 FT AMSL AH 9000 FT AMSL DP 34:40:20 N 133:34:22 E DP 34:40:00 N 133:35:00 E DP 34:36:03 N 133:33:24 E DP 34:32:06 N 133:20:20 E DP 34:40:20 N 133:34:22 E AC E AN Kansai ACA-3 AL 6000 FT AMSL AH 12000 FT AMSL DP 34:36:03 N 133:33:24 E DP 34:21:47 N 133:27:38 E DP 34:32:06 N 133:20:20 E DP 34:36:03 N 133:33:24 E AC E AN Kansai ACA-4 AL 700 FT AMSL AH FL190 DP 34:36:03 N 133:33:24 E V D=- V X=34:25.8545 N 135:14:49 E DB 34:41:57 N 133:52:27 E,34:07:20 N 133:53:27 E DP 34:07:20 N 133:53:27 E DP 33:45:32 N 133:42:15 E V D=+ V X=33:32:30 N 133:40:45 E DB 33:27:32 N 133:11:27 E,33:56:47 N 133:33:42 E DP 33:56:47 N 133:33:42 E DP 33:57.5016 N 133:32.7044 E DP 33:58.2548 N 133:31:45 E V X=34:19:35 N 133:57:12 E DB 33:58.2548 N 133:31:45 E,34:09:44 N 133:22:57 E DP 34:09:44 N 133:22:57 E DP 34:21:47 N 133:27:38 E DP 34:36:03 N 133:33:24 E AC E AN Kansai ACA-5 AL 700 FT AMSL AH FL150 V D=- V X=34:25.8049 N 135:15.1064 E DB 34:07:20 N 133:53:27 E,33:38.4407 N 134:12:59 E DP 33:38.4407 N 134:12:59 E DP 33:37:14 N 134:14:22 E DP 33:37:02 N 134:19:00 E DP 33:35:45 N 134:19:00 E DP 33:34:46 N 134:38:38 E V D=+ V X=33:32.5039 N 133:40:49 E DB 33:25:35 N 134:21:55 E,33:09:32 N 134:12:23 E DP 33:09:32 N 134:12:23 E DP 32:54:59 N 133:14:40 E DP 33:27:32 N 133:11:27 E DP 33:45:32 N 133:42:15 E DP 34:07:20 N 133:53:27 E AC E AN Kansai ACA-6 AL 700 FT AMSL AH FL190 DP 34:56:03 N 133:58:24 E DP 34:59:37 N 134:16:03 E DP 35:05:46 N 134:48:08 E DP 34:48:56 N 135:07:39 E DP 34:47:13 N 134:58:44 E DP 34:22:32 N 134:25:24 E DP 34:17:01 N 133:57:30 E DP 34:14:38 N 133:51:29 E DP 34:16.2844 N 133:51:10 E DP 34:17:57 N 133:50:54 E V X=34:25.8049 N 135:15.1069 E DB 34:17:57 N 133:50:54 E,34:56:03 N 133:58:24 E AC E AN Kansai ACA-7 AL 700 FT AMSL AH FL180 DP 34:14:38 N 133:51:29 E DP 34:17:01 N 133:57:30 E DP 34:22:32 N 134:25:24 E DP 34:13:00 N 134:28:35 E DP 34:13:00 N 134:19:32 E DP 34:11:36 N 134:19:00 E DP 33:37:02 N 134:19:00 E V X=34:25.805 N 135:15.1067 E DB 33:37:14 N 134:14:22 E,34:13:51 N 133:51:39 E DP 34:13:51 N 133:51:39 E DP 34:14:38 N 133:51:29 E AC E AN Kansai ACA-8 AL 5000 FT AMSL AH FL180 DP 34:13:00 N 134:28:35 E DP 33:58:27 N 134:33:23 E DP 33:58:01 N 134:19:00 E DP 34:11:36 N 134:19:00 E DP 34:13:00 N 134:19:32 E DP 34:13:00 N 134:28:35 E AC E AN Kansai ACA-9 AL 6000 FT AMSL AH FL180 DP 33:58:01 N 134:19:00 E DP 33:58:27 N 134:33:23 E DP 33:36:07 N 134:40:43 E DP 33:37:02 N 134:19:00 E DP 33:58:01 N 134:19:00 E AC E AN Kansai TCA-E1 AL 7000 FT AMSL AH 10000 FT AMSL V X=34:47:04 N 135:26:21 E DB 34:59:55 N 135:07:42 E,34:56:56 N 135:47:32 E DP 34:56:56 N 135:47:32 E DP 34:56:47 N 135:47:36 E DP 34:56:33 N 135:47:34 E DP 34:56:14 N 135:47:57 E DP 34:56:11 N 135:47:59 E DP 34:53:42 N 135:42:42 E DP 34:54.3904 N 135:42.2745 E DP 34:55.0559 N 135:41:48 E V D=- V X=34:47:04 N 135:26:21 E DB 34:55.0559 N 135:41:48 E,34:56:42 N 135:12:22 E DP 34:56:42 N 135:12:22 E DP 34:59:55 N 135:07:42 E AC E AN Kansai TCA-E10 AL 4000 FT AMSL AH 10000 FT AMSL DP 34:56:11 N 135:47:59 E DP 34:44:22 N 136:02:37 E DP 34:43:17 N 136:2.52188 E DP 34:42:12 N 136:02:20 E V X=34:47:04 N 135:26:21 E DB 34:42:12 N 136:02:20 E,34:28:58 N 135:55:22 E DP 34:28:58 N 135:55:22 E V D=- V X=34:47:04 N 135:26:21 E DB 34:29:31 N 135:38:02 E,34:55.7542 N 135:48:19 E DP 34:55.7542 N 135:48:19 E DP 34:56:11 N 135:47:59 E AC E AN Kansai TCA-E11 AL 4001 FT AMSL AH 10000 FT AMSL DP 34:29:31 N 135:38:02 E V X=34:47:04 N 135:26:21 E DB 34:29.5048 N 135:38.0385 E,34:27:24 N 135:30:55 E DP 34:27:24 N 135:30:55 E DP 34:29:10 N 135:32:39 E DP 34:29:38 N 135:34:25 E DP 34:29:31 N 135:38:02 E AC E AN Kansai TCA-E12 AL 2500 FT AMSL AH 10000 FT AMSL DP 34:42:15 N 135:16:35 E V D=- V X=34:47:03 N 135:26.3223 E DB 34:44:08 N 135:21:26 E,34:42:23 N 135:28:28 E DP 34:42:23 N 135:28:28 E DP 34:39:30 N 135:31:57 E DP 34:33:17 N 135:27:52 E V X=34:47.0675 N 135:26:21 E DB 34:31:07 N 135:29:05 E,34:32:15 N 135:34:03 E DP 34:32:15 N 135:34:03 E DP 34:29:38 N 135:34:25 E DP 34:29:10 N 135:32:39 E DP 34:27:24 N 135:30:55 E V D=+ V X=34:46:55 N 135:26.3729 E DB 34:27:24 N 135:30:55 E,34:27:29 N 135:21:16 E DP 34:27:29 N 135:21:16 E DP 34:28:29 N 135:22:45 E DP 34:35:20 N 135:25:58 E DP 34:38:09 N 135:24:33 E DP 34:38:15 N 135:19:30 E DP 34:38:42 N 135:19.4529 E DP 34:39.1344 N 135:19:21 E V D=- V X=34:37:58 N 135:13:26 E DB 34:39.1344 N 135:19:21 E,34:42:15 N 135:16:35 E AC E AN Kansai TCA-E13 AL 4500 FT AMSL AH 10000 FT AMSL V X=34:37.9695 N 135:13:26 E DB 34:39:30 N 135:07:39 E,34:40:32 N 135:18:39 E V D=- V X=34:25.805 N 135:15.1067 E DB 34:40:32 N 135:18:39 E,34:39.7882 N 135:08:28 E DP 34:39.7882 N 135:08:28 E DP 34:39:30 N 135:07:39 E AC E AN Kansai TCA-E14 AL 4001 FT AMSL AH 10000 FT AMSL DP 34:39:31 N 135:07:40 E DP 34:39:16 N 135:07:34 E DP 34:38.8237 N 135:07:27 E V D=- V X=34:37:58 N 135:13:26 E DB 34:38.8237 N 135:07:27 E,34:35:23 N 135:08:14 E DP 34:35:23 N 135:08:14 E DP 34:35:08 N 135:05:15 E DP 34:39:18 N 135:04:45 E DP 34:39:31 N 135:07:40 E AC E AN Kansai TCA-E15 AL 5001 FT AMSL AH 10000 FT AMSL DP 34:38:35 N 134:55:31 E DP 34:39:18 N 135:04:45 E DP 34:35:08 N 135:05:15 E V X=34:37:52 N 135:13:43 E DB 34:34:20 N 134:56:00 E,34:37:49 N 134:55:29 E DP 34:37:49 N 134:55:29 E DP 34:38:35 N 134:55:31 E AC E AN Kansai TCA-E16 AL 5001 FT AMSL AH 10000 FT AMSL DP 34:38:24 N 135:12:15 E DP 34:38:09 N 135:24:33 E DP 34:35:20 N 135:25:58 E DP 34:34:08 N 135:25:24 E DP 34:34:15 N 135:20:14 E DP 34:33:13 N 135:19:45 E DP 34:30:44 N 135:16:03 E DP 34:30:53 N 135:15.5374 E DP 34:30.9746 N 135:15.0078 E V D=- V X=34:26:03 N 135:13:58 E DB 34:30.9746 N 135:15.0078 E,34:30:47 N 135:12:01 E DP 34:30:47 N 135:12:01 E DP 34:38:24 N 135:12:15 E AC E AN Kansai TCA-E17 AL 4001 FT AMSL AH 10000 FT AMSL DP 34:34:08 N 135:25:24 E DP 34:31:47 N 135:24:17 E DP 34:33:13 N 135:19:45 E DP 34:34:15 N 135:20:14 E DP 34:34:08 N 135:25:24 E AC E AN Kansai TCA-E18 AL 3001 FT AMSL AH 10000 FT AMSL DP 34:31:47 N 135:24:17 E DP 34:28:29 N 135:22:45 E DP 34:26:37 N 135:19:59 E DP 34:25.805 N 135:15.1067 E V X=34:26:03 N 135:13:58 E DB 34:21:06 N 135:13:03 E,34:30:49 N 135:15.8563 E DP 34:30:49 N 135:15.8563 E DP 34:30:44 N 135:16:03 E DP 34:33:13 N 135:19:45 E DP 34:31:47 N 135:24:17 E AC E AN Kansai TCA-E19 AL 4000 FT AMSL AH 10000 FT AMSL DP 34:27:03 N 135:27:06 E DP 34:26:26 N 135:27:14 E DP 34:25:48 N 135:27.2521 E V X=34:25.8051 N 135:15.1067 E DB 34:25:48 N 135:27.2521 E,34:16:23 N 135:10:59 E DP 34:16:23 N 135:10:59 E DP 34:25.805 N 135:15.1067 E DP 34:26:37 N 135:19:59 E DP 34:27:29 N 135:21:16 E DP 34:27:19 N 135:22:20 E V D=- V X=34:47.0677 N 135:26:21 E DB 34:27:19 N 135:22:20 E,34:27:03 N 135:27:06 E AC E AN Kansai TCA-E2 AL 5000 FT AMSL AH 10000 FT AMSL DP 34:59:55 N 135:07:42 E V X=34:47:04 N 135:26:21 E DB 34:56:42 N 135:12:22 E,34:53.9544 N 135:42:34 E DP 34:53.9544 N 135:42:34 E DP 34:53:42 N 135:42:42 E V D=- V X=34:47:04 N 135:26:21 E DB 34:51:12 N 135:37:25 E,34:42:43 N 135:15.4195 E DP 34:42:43 N 135:15.4195 E V X=34:37:58 N 135:13:26 E DB 34:42:42 N 135:15:26 E,34:39.8539 N 135:7.7906 E DP 34:39.8539 N 135:7.7906 E DP 34:39:31 N 135:07:40 E DP 34:39:15 N 135:04:01 E DP 34:40.0687 N 135:03:35 E DP 34:40:55 N 135:3.22235 E V D=+ V X=34:47:04 N 135:26:21 E DB 34:40:55 N 135:3.22235 E,34:59:55 N 135:07:42 E AC E AN Kansai TCA-E20 AL 5000 FT AMSL AH 10000 FT AMSL DP 34:28:58 N 135:55:22 E DP 34:28.3039 N 135:54:51 E DP 34:27:28 N 135:54:00 E V X=34:47:04 N 135:26:21 E DB 34:27:28 N 135:54:00 E,34:18:30 N 135:37:36 E DP 34:18:30 N 135:37:36 E DP 34:17:59 N 135:37:27 E DP 34:17:10 N 135:37:00 E V X=34:25.805 N 135:15.1067 E DB 34:17:10 N 135:37:00 E,34:06:58 N 135:06:52 E DP 34:06:58 N 135:06:52 E V D=- V X=34:25.8049 N 135:15.1066 E DB 34:16:23 N 135:10:59 E,34:26:26 N 135:27:14 E DP 34:26:26 N 135:27:14 E V X=34:47:04 N 135:26:21 E DB 34:27:03 N 135:27:06 E,34:29.0911 N 135:37:05 E DP 34:29.0911 N 135:37:05 E DP 34:29:31 N 135:38:02 E DP 34:28:58 N 135:55:22 E AC E AN Kansai TCA-E21 AL 4001 FT AMSL AH 10000 FT AMSL DP 34:21:19 N 135:12:02 E DP 34:19:43 N 135:09:38 E DP 34:23:47 N 135:05:38 E V D=- V X=34:26:03 N 135:13:58 E DB 34:25:20 N 135:07:58 E,34:21:22 N 135:11:52 E DP 34:21:22 N 135:11:52 E DP 34:21:19 N 135:12:02 E AC E AN Kansai TCA-E22 AL 5001 FT AMSL AH 10000 FT AMSL DP 34:19:43 N 135:09:38 E DP 34:18:27 N 135:07:45 E DP 34:22:31 N 135:03:45 E DP 34:23:47 N 135:05:38 E DP 34:19:43 N 135:09:38 E AC E AN Kansai TCA-E23 AL 7001 FT AMSL AH 10000 FT AMSL DP 34:18:27 N 135:07:45 E DP 34:14:49 N 135:02:19 E DP 34:18:53 N 134:58:20 E DP 34:22:31 N 135:03:45 E DP 34:18:27 N 135:07:45 E AC E AN Kansai TCA-E24 AL 3000 FT AMSL AH 10000 FT AMSL DP 34:21:19 N 135:12:02 E DP 34:21:11 N 135:12:33 E DP 34:21:06 N 135:13:03 E V X=34:25.805 N 135:15.1067 E DB 34:06:58 N 135:06:52 E,34:18:27 N 134:52.5373 E DP 34:18:27 N 134:52.5373 E DP 34:18:54 N 134:52:26 E DP 34:15:27 N 134:41:06 E DP 34:16.4715 N 134:40:38 E DP 34:17:31 N 134:40:14 E V X=34:25.8049 N 135:15.1068 E DB 34:17:31 N 134:40:14 E,34:44:56 N 134:47:06 E DP 34:44:56 N 134:47:06 E V D=- V X=34:47:04 N 135:26:21 E DB 34:48:42 N 135:02:07 E,34:39:56 N 135:03:40 E DP 34:39:56 N 135:03:40 E DP 34:39:15 N 135:04:01 E DP 34:38:35 N 134:55:31 E DP 34:37:49 N 134:55:29 E DP 34:37.0357 N 134:55:31 E V X=34:37:52 N 135:13.7181 E DB 34:37.0357 N 134:55:31 E,34:34:20 N 134:56:00 E DP 34:34:20 N 134:56:00 E V D=+ V X=34:37.9675 N 135:13:26 E DB 34:35:23 N 135:08:14 E,34:39:30 N 135:07:39 E DP 34:39:30 N 135:07:39 E DP 34:39.804 N 135:08:31 E DP 34:40:04 N 135:9.40253 E V X=34:25.8049 N 135:15.1067 E DB 34:40:04 N 135:9.40253 E,34:40:32 N 135:18:39 E V X=34:37.9739 N 135:13:30 E DB 34:40:32 N 135:18:39 E,34:38:15 N 135:19:30 E DP 34:38:15 N 135:19:30 E DP 34:38:24 N 135:12:15 E V D=- V X=34:26:04 N 135:13:58 E DB 34:30:47 N 135:12:01 E,34:25:20 N 135:07:58 E DP 34:25:20 N 135:07:58 E DP 34:18:53 N 134:58:20 E DP 34:14:49 N 135:02:19 E DP 34:21:19 N 135:12:02 E AC E AN Kansai TCA-E3 AL 3500 FT AMSL AH 10000 FT AMSL DP 34:52:04 N 135:15:50 E DP 34:52.6056 N 135:16.2343 E DP 34:53.12 N 135:16:41 E V X=34:47:04 N 135:26:21 E DB 34:53.12 N 135:16:41 E,34:51:12 N 135:37:25 E DP 34:51:12 N 135:37:25 E DP 34:46:23 N 135:27:10 E DP 34:44:35 N 135:22:33 E DP 34:44.9021 N 135:22.2573 E DP 34:45:15 N 135:22:01 E V X=34:47:04 N 135:26:21 E DB 34:45:15 N 135:22:01 E,34:49:04 N 135:22:08 E DP 34:49:04 N 135:22:08 E DP 34:52:04 N 135:15:50 E AC E AN Kansai TCA-E4 AL 4500 FT AMSL AH 10000 FT AMSL DP 34:52:04 N 135:15:50 E V D=- V X=34:47:04 N 135:26:21 E DB 34:49:04 N 135:22:08 E,34:44.8883 N 135:22.2682 E DP 34:44.8883 N 135:22.2682 E DP 34:44:35 N 135:22:33 E DP 34:42:15 N 135:16:35 E DP 34:42.4687 N 135:16:07 E DP 34:42:39 N 135:15:37 E V D=+ V X=34:47:04 N 135:26:21 E DB 34:42:42 N 135:15:26 E,34:52:04 N 135:15:50 E AC E AN Kansai TCA-E5 AL 3001 FT AMSL AH 10000 FT AMSL DP 34:48:42 N 135:32:05 E DP 34:48:17 N 135:32.2559 E DP 34:47.8386 N 135:32:22 E V X=34:47:04 N 135:26:21 E DB 34:47.8386 N 135:32:22 E,34:45:19 N 135:32:03 E DP 34:45:19 N 135:32:03 E DP 34:43:35 N 135:34:09 E DP 34:40:38 N 135:30:34 E V X=34:47:04 N 135:26:21 E DB 34:42:23 N 135:28:28 E,34:43:57 N 135:21.6009 E DP 34:43:57 N 135:21.6009 E DP 34:44:08 N 135:21:26 E DP 34:46:23 N 135:27:10 E DP 34:48:42 N 135:32:05 E AC E AN Kansai TCA-E6 AL 4001 FT AMSL AH 10000 FT AMSL DP 34:43:35 N 135:34:09 E DP 34:42:50 N 135:35:04 E DP 34:39:53 N 135:31:28 E DP 34:40:38 N 135:30:34 E DP 34:43:35 N 135:34:09 E AC E AN Kansai TCA-E7 AL 2500 FT AMSL AH 10000 FT AMSL DP 34:48:42 N 135:32:05 E DP 34:51:12 N 135:37:25 E DP 34:50.6189 N 135:37.7181 E DP 34:50.0215 N 135:37.9683 E V X=34:47:04 N 135:26:21 E DB 34:50.0215 N 135:37.9683 E,34:41:37 N 135:36:32 E DP 34:41:37 N 135:36:32 E V D=- V X=34:47:04 N 135:26:21 E DB 34:45:19 N 135:32:03 E,34:48:24 N 135:32.2192 E DP 34:48:24 N 135:32.2192 E DP 34:48:42 N 135:32:05 E AC E AN Kansai TCA-E8 AL 5001 FT AMSL AH 10000 FT AMSL DP 34:42:50 N 135:35:04 E DP 34:36:39 N 135:42:30 E DP 34:36:37 N 135:42:29 E DP 34:36:07 N 135:42.0872 E V X=34:41:12 N 135:33:04 E DB 34:36:07 N 135:42.0872 E,34:33:17 N 135:27:52 E DP 34:33:17 N 135:27:52 E DP 34:39:30 N 135:31:57 E DP 34:39:53 N 135:31:28 E DP 34:42:50 N 135:35:04 E AC E AN Kansai TCA-E9 AL 3500 FT AMSL AH 10000 FT AMSL DP 34:51:12 N 135:37:25 E DP 34:56:11 N 135:47:59 E DP 34:55.4031 N 135:48:31 E DP 34:54:35 N 135:48:57 E V X=34:47:04 N 135:26:21 E DB 34:54:35 N 135:48:57 E,34:29:31 N 135:38:02 E DP 34:29:31 N 135:38:02 E DP 34:29:38 N 135:34:25 E DP 34:32:15 N 135:34:03 E DP 34:31.8889 N 135:35.3205 E DP 34:32:16 N 135:36.2067 E V D=- V X=34:47:04 N 135:26:21 E DB 34:32:16 N 135:36.2067 E,34:36:39 N 135:42:30 E DP 34:36:39 N 135:42:30 E V X=34:47:04 N 135:26:21 E DB 34:41:37 N 135:36:32 E,34:50:42 N 135:37:41 E DP 34:50:42 N 135:37:41 E DP 34:51:12 N 135:37:25 E AC E AN Kansai TCA-W1 AL 7000 FT AMSL AH 9000 FT AMSL DP 34:57:34 N 133:33:35 E DP 34:58.2513 N 133:35:06 E DP 34:58:51 N 133:36.6736 E V X=34:12:45 N 134:01:21 E DB 34:58:51 N 133:36.6736 E,35:03:01 N 134:05:18 E V X=34:40:17 N 134:00:54 E DB 35:03:01 N 134:05:18 E,34:54:26 N 134:23:01 E DP 34:54:26 N 134:23:01 E V D=- V X=34:12:45 N 134:01:21 E DB 34:53:59 N 134:23:21 E,34:53:14 N 133:37:23 E DP 34:53:14 N 133:37:23 E DP 34:52:52 N 133:36:30 E DP 34:57:34 N 133:33:35 E AC E AN Kansai TCA-W10 AL 4000 FT AMSL AH 9000 FT AMSL V X=34:12:45 N 134:01:21 E DB 34:44:15 N 134:17:35 E,34:38:42 N 134:28.403 E DP 34:38:42 N 134:28.403 E DP 34:38:27 N 134:28:40 E DP 34:34:12 N 134:29:50 E DP 34:33:32 N 134:29:50 E DP 34:22:19 N 134:16:42 E DP 34:21:14 N 134:14:57 E DP 34:21:51 N 134:14.4203 E DP 34:22.406 N 134:13:49 E V D=- V X=34:12:45 N 134:01:21 E DB 34:22.406 N 134:13:49 E,34:26:32 N 134:05:03 E DP 34:26:32 N 134:05:03 E DP 34:35:15 N 134:05:03 E DP 34:45:05 N 134:11:51 E DP 34:46:22 N 134:18:41 E DP 34:44:15 N 134:17:35 E AC E AN Kansai TCA-W11 AL 3100 FT AMSL AH 9000 FT AMSL DP 34:21:39 N 133:35:45 E DP 34:12:45 N 134:01:21 E V X=34:12:45 N 134:01:21 E DB 34:08:39 N 133:51:41 E,34:11:30 N 133:50.5908 E DP 34:11:30 N 133:50.5908 E DP 34:11:38 N 133:50:35 E DP 34:10:23 N 133:38:37 E DP 34:09:50 N 133:33:51 E DP 34:10:47 N 133:33.708 E DP 34:11.7391 N 133:33:38 E V X=34:12:45 N 134:01:21 E DB 34:11.7391 N 133:33:38 E,34:21:39 N 133:35:45 E AC E AN Kansai TCA-W12 AL 2800 FT AMSL AH 9000 FT AMSL DP 34:16:16 N 133:51:13 E DP 34:16:50 N 133:51.4901 E DP 34:17.3566 N 133:51.8377 E V X=34:12:45 N 134:01:21 E DB 34:17.3566 N 133:51.8377 E,34:21:51 N 134:01:56 E DP 34:21:51 N 134:01:56 E V D=- V X=34:12:51 N 134:00:56 E DB 34:17:49 N 134:01:40 E,34:14:59 N 133:55:28 E DP 34:14:59 N 133:55:28 E DP 34:14:49 N 133:55:24 E DP 34:16:16 N 133:51:13 E AC E AN Kansai TCA-W13 AL 2700 FT AMSL AH 9000 FT AMSL V X=34:12:45 N 134:01:21 E DB 34:26:51 N 134:02:15 E,34:21.4711 N 134:14.7895 E DP 34:21.4711 N 134:14.7895 E DP 34:21:14 N 134:14:57 E DP 34:22:19 N 134:16:42 E DP 34:17:31 N 134:11:05 E V D=- V X=34:12:52 N 134:00:57 E DB 34:16:07 N 134:05:31 E,34:17:49 N 134:01:40 E DP 34:17:49 N 134:01:40 E DP 34:26:51 N 134:02:15 E AC E AN Kansai TCA-W14 AL 2700 FT AMSL AH 6000 FT AMSL V X=34:12:45 N 134:01:21 E DB 34:24:11 N 134:19:41 E,34:17.1363 N 134:23:41 E DP 34:17.1363 N 134:23:41 E DP 34:16:40 N 134:23:47 E DP 34:15:49 N 134:18:50 E DP 34:19:11 N 134:17:34 E DP 34:17:31 N 134:11:05 E DP 34:22:19 N 134:16:42 E DP 34:24:11 N 134:19:41 E AC E AN Kansai TCA-W15 AL 4501 FT AMSL AH 6000 FT AMSL DP 34:17:31 N 134:11:05 E DP 34:19:11 N 134:17:34 E DP 34:15:49 N 134:18:50 E DP 34:15:21 N 134:19:00 E DP 34:12:59 N 134:09:42 E DP 34:12:58 N 134:09:24 E DP 34:16:11 N 134:09:31 E DP 34:17:31 N 134:11:05 E AC E AN Kansai TCA-W16 AL 3600 FT AMSL AH 6000 FT AMSL DP 34:15:49 N 134:18:50 E DP 34:16:40 N 134:23:47 E DP 34:15:49 N 134:23:59 E DP 34:14:57 N 134:24:08 E DP 34:14:05 N 134:24.2219 E DP 34:13:19 N 134:24:16 E DP 34:13:15 N 134:19:37 E DP 34:12:59 N 134:09:42 E DP 34:15:21 N 134:19:00 E DP 34:15:49 N 134:18:50 E AC E AN Kansai TCA-W17 AL 4000 FT AMSL AH 6000 FT AMSL DP 34:33:32 N 134:29:50 E DP 34:25:49 N 134:29:50 E DP 34:13:25 N 134:28:27 E DP 34:13:19 N 134:24:16 E DP 34:14.1869 N 134:24:14 E DP 34:15.0536 N 134:24:08 E V D=- V X=34:12:45 N 134:01:21 E DB 34:15.0536 N 134:24:08 E,34:24:11 N 134:19:41 E DP 34:24:11 N 134:19:41 E DP 34:22:19 N 134:16:42 E DP 34:33:32 N 134:29:50 E AC E AN Kansai TCA-W18 AL 6000 FT AMSL AH 9000 FT AMSL DP 34:08:44 N 133:23:30 E DP 34:09:50 N 133:33:51 E V D=- V X=34:12:45 N 134:01:19 E DB 34:10:22 N 133:38:37 E,34:07:06 N 133:39:29 E DP 34:07:06 N 133:39:29 E V D=+ V X=34:19:35 N 133:57:12 E DB 34:03:45 N 133:26:30 E,34:8.62144 N 133:23.5195 E DP 34:8.62144 N 133:23.5195 E DP 34:08:44 N 133:23:30 E AC E AN Kansai TCA-W19 AL 4000 FT AMSL AH 9000 FT AMSL DP 34:10:22 N 133:38:37 E DP 34:11:38 N 133:50:35 E DP 34:11.0403 N 133:50.6851 E DP 34:10.4563 N 133:50:51 E DP 34:10:04 N 133:50:59 E V X=34:12:45 N 134:1.30399 E DB 34:07:06 N 133:39:29 E,34:10:22 N 133:38:37 E AC E AN Kansai TCA-W2 AL 7000 FT AMSL AH 9000 FT AMSL DP 34:52:52 N 133:36:30 E V D=- V X=34:12:45 N 134:01:21 E DB 34:43:14 N 133:42:28 E,34:39:25 N 133:35:20 E DP 34:39:25 N 133:35:20 E DP 34:38:50 N 133:34:32 E DP 34:40:00 N 133:35:00 E DP 34:40:20 N 133:34:22 E DP 34:44:38 N 133:26:01 E DP 34:47:02 N 133:26:00 E DP 34:47:56 N 133:27.2208 E V D=+ V X=34:12:45 N 134:01:21 E DB 34:47:56 N 133:27.2208 E,34:52:52 N 133:36:30 E AC E AN Kansai TCA-W20 AL 8000 FT AMSL AH 9000 FT AMSL DP 34:03:45 N 133:26:30 E DP 34:07:06 N 133:39:29 E DP 34:06:16 N 133:39:47 E DP 34:5.45284 N 133:40:10 E V D=- V X=34:12:45 N 134:01:21 E DB 34:5.45284 N 133:40:10 E,33:58:49 N 133:45:46 E DP 33:58:49 N 133:45:46 E V X=33:32.5067 N 133:40:49 E DB 33:57:23 N 133:44:16 E,33:57.0225 N 133:34.6681 E DP 33:57.0225 N 133:34.6681 E DP 33:56:49 N 133:33:39 E DP 33:57:33 N 133:32:40 E V D=+ V X=34:19:35 N 133:57:12 E DB 33:57:33 N 133:32:40 E,34:03:23 N 133:26:43 E DP 34:03:23 N 133:26:43 E DP 34:03:45 N 133:26:30 E AC E AN Kansai TCA-W21 AL 5000 FT AMSL AH 9000 FT AMSL DP 34:07:06 N 133:39:29 E DP 34:10:04 N 133:50:59 E DP 34:09:30 N 133:51.221 E DP 34:08:57 N 133:51.5058 E DP 34:08:39 N 133:51:41 E DP 34:12:45 N 134:01:21 E DP 34:12:58 N 134:09:24 E DP 34:08:30 N 134:09:13 E DP 34:07:05 N 134:09:47 E DP 34:06:38 N 134:09:19 E DP 34:6.20297 N 134:8.80193 E V X=34:12:45 N 134:01:21 E DB 34:6.20297 N 134:8.80193 E,34:06:09 N 133:53:58 E DP 34:06:09 N 133:53:58 E DP 34:02:24 N 133:49:47 E V X=34:12:45 N 134:01:21 E DB 33:58:49 N 133:45:46 E,34:06:47 N 133:39:34 E DP 34:06:47 N 133:39:34 E DP 34:07:06 N 133:39:29 E AC E AN Kansai TCA-W22 AL 3001 FT AMSL AH 9000 FT AMSL DP 34:14:49 N 133:55:24 E DP 34:15:14 N 133:55:37 E DP 34:15:37 N 133:55.8877 E V X=34:12:51 N 134:00:56 E DB 34:15:37 N 133:55.8877 E,34:16:07 N 134:05:31 E DP 34:16:07 N 134:05:31 E DP 34:17:31 N 134:11:05 E DP 34:16:11 N 134:09:31 E DP 34:12:58 N 134:09:24 E DP 34:12:45 N 134:01:21 E DP 34:14:49 N 133:55:24 E AC E AN Kansai TCA-W23 AL 8000 FT AMSL AH 9000 FT AMSL DP 34:06:09 N 133:53:58 E DP 34:5.74057 N 133:54:30 E DP 34:05:23 N 133:55.0748 E V D=- V X=34:12:45 N 134:01:21 E DB 34:05:23 N 133:55.0748 E,34:03:44 N 134:01:21 E DP 34:03:44 N 134:01:21 E V D=+ V X=34:12:45 N 134:01:21 E DB 33:58:53 N 133:58:10 E,34:02:08 N 133:50:07 E DP 34:02:08 N 133:50:07 E DP 34:06:09 N 133:53:58 E AC E AN Kansai TCA-W24 AL 5000 FT AMSL AH 6000 FT AMSL DP 34:12:58 N 134:09:24 E DP 34:13:15 N 134:19:37 E DP 34:11:36 N 134:19:00 E DP 34:08:30 N 134:19:00 E DP 34:04:30 N 134:16:27 E DP 34:07:50 N 134:10:21 E DP 34:7.3083 N 134:10:00 E DP 34:07:05 N 134:09:47 E DP 34:08:30 N 134:09:13 E DP 34:12:58 N 134:09:24 E AC E AN Kansai TCA-W3 AL 5000 FT AMSL AH 9000 FT AMSL DP 34:52:52 N 133:36:30 E DP 34:53:30 N 133:37:57 E DP 34:54.0567 N 133:39:26 E V X=34:12:45 N 134:01:21 E DB 34:54.0567 N 133:39:26 E,34:57:46 N 134:04:13 E DP 34:57:46 N 134:04:13 E V D=- V X=34:12:45 N 134:01:21 E DB 34:52:46 N 134:03:54 E,34:52:36 N 133:56:12 E DP 34:52:36 N 133:56:12 E DP 34:52:31 N 133:55:26 E V X=34:12:45 N 134:01:21 E DB 34:46:45 N 133:56:17 E,34:43.3695 N 133:42.721 E DP 34:43.3695 N 133:42.721 E DP 34:43:13 N 133:42:28 E DP 34:52:52 N 133:36:30 E AC E AN Kansai TCA-W4 AL 4000 FT AMSL AH 9000 FT AMSL V X=34:12:45 N 134:01:21 E DB 34:57:46 N 134:04:13 E,34:54.5897 N 134:21.724 E DP 34:54.5897 N 134:21.724 E DP 34:54:13 N 134:22:44 E DP 34:49:36 N 134:20:21 E DP 34:50:07 N 134:18.9389 E DP 34:50:33 N 134:17:30 E V D=- V X=34:12:45 N 134:01:21 E DB 34:50:33 N 134:17:30 E,34:52:46 N 134:03:54 E DP 34:52:46 N 134:03:54 E DP 34:57:46 N 134:04:13 E AC E AN Kansai TCA-W5 AL 5000 FT AMSL AH 9000 FT AMSL DP 34:54:13 N 134:22:44 E DP 34:53:59 N 134:23:21 E DP 34:53.2014 N 134:24:02 E DP 34:52:24 N 134:24:40 E DP 34:51:50 N 134:25:03 E DP 34:45:12 N 134:26:50 E DP 34:38:27 N 134:28:40 E DP 34:39:15 N 134:27.6208 E DP 34:39.9692 N 134:26.5067 E V D=- V X=34:12:45 N 134:01:21 E DB 34:39.9692 N 134:26.5067 E,34:44:15 N 134:17:35 E DP 34:44:15 N 134:17:35 E DP 34:49:36 N 134:20:21 E DP 34:54:13 N 134:22:44 E AC E AN Kansai TCA-W6 AL 6001 FT AMSL AH 9000 FT AMSL DP 34:40:20 N 133:34:22 E DP 34:40:00 N 133:35:00 E DP 34:36:03 N 133:33:24 E DP 34:21:47 N 133:27:38 E DP 34:32:06 N 133:20:20 E DP 34:40:20 N 133:34:22 E AC E AN Kansai TCA-W7 AL 5000 FT AMSL AH 9000 FT AMSL DP 34:43:14 N 133:42:28 E V D=- V X=34:12:45 N 134:01:21 E DB 34:33:15 N 133:48:40 E,34:10:12 N 133:33:42 E DP 34:10:12 N 133:33:42 E DP 34:09:50 N 133:33:51 E DP 34:08:44 N 133:23:30 E DP 34:09:44 N 133:22.9511 E DP 34:09:44 N 133:22:57 E DP 34:21:47 N 133:27:38 E DP 34:36:03 N 133:33:24 E DP 34:38:50 N 133:34:32 E DP 34:39:36 N 133:35.6081 E DP 34:40:19 N 133:36.7367 E V D=+ V X=34:12:45 N 134:01:21 E DB 34:40:19 N 133:36.7367 E,34:43:14 N 133:42:28 E AC E AN Kansai TCA-W8 AL 4000 FT AMSL AH 9000 FT AMSL DP 34:43:13 N 133:42:28 E DP 34:43.7697 N 133:43.7213 E DP 34:44:15 N 133:45.02 E V X=34:12:45 N 134:01:21 E DB 34:44:15 N 133:45.02 E,34:46:45 N 133:56:17 E DP 34:46:45 N 133:56:17 E V D=- V X=34:12:45 N 134:01:21 E DB 34:35:37 N 133:57:57 E,34:33:26 N 133:49.0558 E DP 34:33:26 N 133:49.0558 E DP 34:33:15 N 133:48:40 E DP 34:43:13 N 133:42:28 E AC E AN Kansai TCA-W9 AL 3000 FT AMSL AH 9000 FT AMSL V X=34:12:45 N 134:01:21 E DB 34:52:31 N 133:55:26 E,34:49.8748 N 134:19:38 E DP 34:49.8748 N 134:19:38 E DP 34:49:36 N 134:20:21 E DP 34:46:22 N 134:18:41 E DP 34:45:05 N 134:11:51 E DP 34:35:15 N 134:05:03 E V D=- V X=34:12:56 N 134:01:23 E DB 34:26:32 N 134:05:03 E,34:26:51 N 134:02:15 E DP 34:26:51 N 134:02:15 E V X=34:12:45 N 134:01:21 E DB 34:21:51 N 134:01:56 E,34:16.5541 N 133:51:20 E DP 34:16.5541 N 133:51:20 E DP 34:16:16 N 133:51:13 E DP 34:21:39 N 133:35:45 E DP 34:22:34 N 133:36.1198 E DP 34:23.4226 N 133:36.6347 E V D=+ V X=34:12:45 N 134:01:21 E DB 34:23.4226 N 133:36.6347 E,34:35:37 N 133:57:57 E DP 34:35:37 N 133:57:57 E DP 34:52:31 N 133:55:26 E AC E AN Komatsu ACA-1 AL 700 FT AMSL AH 7000 FT AMSL DP 36:44:20 N 136:51:27 E DP 36:43:32 N 136:52:23 E DP 36:42:42 N 136:53.2575 E V X=36:23:47 N 136:24:18 E DB 36:42:42 N 136:53.2575 E,36:06:55 N 135:53:34 E DP 36:06:55 N 135:53:34 E DP 36:26:59 N 136:21:19 E DP 36:44:20 N 136:51:27 E AC E AN Komatsu ACA-2 AL 700 FT AMSL AH FL150 DP 36:27:24 N 136:22:03 E DP 36:26:59 N 136:21:19 E V X=36:23:44 N 136:24:03 E DB 35:53:32 N 135:35:03 E,36:12:17 N 135:23:58 E DP 36:12:17 N 135:23:58 E DP 36:12:29 N 135:24:56 E DP 36:27:24 N 136:22:03 E AC E AN Komatsu ACA-3 AL 700 FT AMSL AH FL230 DP 36:50:03 N 137:01:22 E DP 36:27:24 N 136:22:03 E DP 36:12:29 N 135:24:56 E V X=36:23.774 N 136:24:15 E DB 36:12:17 N 135:23:58 E,37:11:54 N 136:41:07 E DP 37:11:54 N 136:41:07 E DP 36:50:03 N 137:01:22 E AC E AN Komatsu TCA-1 AL 3000 FT AMSL AH 10000 FT AMSL DP 36:46:40 N 136:48:25 E DP 36:39:02 N 136:40:23 E DP 36:39.5536 N 136:39.5875 E DP 36:40.0879 N 136:38:42 E DP 36:40.5895 N 136:37.7717 E DP 36:41:03 N 136:36:49 E V X=36:23:47 N 136:24:18 E DB 36:49:42 N 136:43:05 E,36:47:22 N 136:47:22 E DP 36:47:22 N 136:47:22 E DP 36:46:40 N 136:48:25 E AC E AN Komatsu TCA-10 AL 7000 FT AMSL AH 7000 FT AMSL V X=36:23.7549 N 136:24.3201 E DB 36:23:47 N 136:42:55 E,36:10:11 N 136:32:06 E DP 36:10:11 N 136:32:06 E V D=- V X=36:23:47 N 136:24:18 E DB 36:15:37 N 136:28:59 E,36:23:11 N 136:35:27 E DP 36:23:11 N 136:35:27 E DP 36:23:47 N 136:35:28 E DP 36:23:47 N 136:42:55 E AC E AN Komatsu TCA-11 AL 6000 FT AMSL AH 7000 FT AMSL DP 36:15:37 N 136:28:59 E V X=36:23:45 N 136:24:19 E DB 36:10:11 N 136:32:06 E,36:08:48 N 136:24:18 E DP 36:08:48 N 136:24:18 E DP 35:58:48 N 136:24:18 E DP 35:58:48 N 136:23.6712 E DP 35:58.8409 N 136:22.4372 E V X=36:23:47 N 136:24:18 E DB 35:58.8409 N 136:22.4372 E,35:59:38 N 136:16:21 E DP 35:59:38 N 136:16:21 E V D=- V X=36:23:47 N 136:24:18 E DB 36:15:05 N 136:21:26 E,36:15:23 N 136:28:18 E DP 36:15:23 N 136:28:18 E DP 36:15:37 N 136:28:59 E AC E AN Komatsu TCA-12 AL 7000 FT AMSL AH 7000 FT AMSL DP 36:10:11 N 136:32:06 E DP 36:01:07 N 136:37:18 E DP 36:00:46 N 136:36:20 E DP 36:00:24 N 136:35:11 E V X=36:23:47 N 136:24:18 E DB 36:00:24 N 136:35:11 E,35:58:48 N 136:24:18 E DP 35:58:48 N 136:24:18 E V D=- V X=36:23.7734 N 136:24.3043 E DB 36:08:48 N 136:24:18 E,36:10:11 N 136:32:06 E AC E AN Komatsu TCA-14 AL 6000 FT AMSL AH 7000 FT AMSL V X=36:23:38 N 136:24:27 E DC 5 AC E AN Komatsu TCA-15 AL 3000 FT AMSL AH 7000 FT AMSL DP 36:18:38 N 136:24:18 E DP 36:16:24 N 136:17:56 E DP 36:16.4686 N 136:17:48 E DP 36:16:50 N 136:17.2065 E V X=36:23:47 N 136:24:18 E DB 36:16:50 N 136:17.2065 E,36:18:35 N 136:15:11 E DP 36:18:35 N 136:15:11 E V D=- V X=36:23.6206 N 136:24:26 E DB 36:20:54 N 136:19:15 E,36:18:38 N 136:24:18 E AC E AN Komatsu TCA-16 AL 2000 FT AMSL AH 7000 FT AMSL DP 36:20:54 N 136:19:15 E DP 36:12:14 N 136:04:04 E DP 36:12:54 N 136:03:30 E DP 36:13.6561 N 136:02:55 E DP 36:14.4359 N 136:2.36833 E DP 36:15.2344 N 136:1.8702 E DP 36:16:03 N 136:01:25 E DP 36:18:03 N 136:05:03 E DP 36:22:04 N 136:18:33 E DP 36:21.6875 N 136:18:44 E DP 36:21:17 N 136:18:58 E DP 36:20:54 N 136:19:15 E AC E AN Komatsu TCA-17 AL 3500 FT AMSL AH 7000 FT AMSL DP 36:16:24 N 136:17:56 E DP 35:59:10 N 136:03:07 E DP 35:59.6021 N 136:2.3392 E DP 36:00:16 N 136:01:16 E V X=36:23:47 N 136:24:18 E DB 36:00:16 N 136:01:16 E,36:10:21 N 135:51:03 E DP 36:10:21 N 135:51:03 E V D=- V X=36:23:47 N 136:24:18 E DB 36:16:03 N 136:01:25 E,36:12.9683 N 136:3.43652 E DP 36:12.9683 N 136:3.43652 E DP 36:12:14 N 136:04:04 E V X=36:23:47 N 136:24:18 E DB 36:18:35 N 136:15:11 E,36:16.752 N 136:17:20 E DP 36:16.752 N 136:17:20 E DP 36:16:24 N 136:17:56 E AC E AN Komatsu TCA-18 AL 2000 FT AMSL AH 10000 FT AMSL DP 36:18:03 N 136:05:03 E DP 36:16:03 N 136:01:25 E DP 36:16:51 N 136:01:02 E DP 36:18:03 N 136:05:03 E AC E AN Komatsu TCA-19 AL 3500 FT AMSL AH 10000 FT AMSL DP 36:16:51 N 136:01:02 E DP 36:16:03 N 136:01:25 E DP 36:10:21 N 135:51:03 E DP 36:10:23 N 135:51:02 E DP 36:11:22 N 135:50.4405 E DP 36:12:22 N 135:49:54 E DP 36:13:23 N 135:49:24 E DP 36:16:51 N 136:01:02 E AC E AN Komatsu TCA-2 AL 4000 FT AMSL AH 10000 FT AMSL DP 36:41:08 N 136:54:43 E DP 36:36:26 N 136:43:33 E DP 36:36.4863 N 136:43.5021 E DP 36:37:10 N 136:42:47 E DP 36:37:49 N 136:42:01 E DP 36:38.4393 N 136:41:13 E DP 36:39:02 N 136:40:23 E V X=36:23:47 N 136:24:18 E DB 36:46:40 N 136:48:25 E,36:42.0197 N 136:53:55 E DP 36:42.0197 N 136:53:55 E DP 36:41:08 N 136:54:43 E AC E AN Komatsu TCA-20 AL 1500 FT AMSL AH 7000 FT AMSL DP 36:25:33 N 136:18:43 E DP 36:25:09 N 136:18:32 E DP 36:24:43 N 136:18:23 E V D=- V X=36:23:38 N 136:24:27 E DB 36:24:43 N 136:18:23 E,36:22:04 N 136:18:33 E DP 36:22:04 N 136:18:33 E DP 36:18:03 N 136:05:03 E DP 36:25:33 N 136:18:43 E AC E AN Komatsu TCA-21 AL 1500 FT AMSL AH 10000 FT AMSL DP 36:49:42 N 136:43:05 E DP 36:30:19 N 136:29:02 E V D=- V X=36:23:38 N 136:24:27 E DB 36:28:37 N 136:25:00 E,36:25.9574 N 136:18:57 E DP 36:25.9574 N 136:18:57 E DP 36:25:33 N 136:18:43 E DP 36:18:03 N 136:05:03 E V D=+ V X=36:23:48 N 136:24:19 E DB 36:13:23 N 135:49:24 E,36:49:42 N 136:43:05 E AC E AN Komatsu TCA-3 AL 4000 FT AMSL AH 7000 FT AMSL DP 36:36:47 N 136:57:54 E V D=- V X=36:23:47 N 136:24.3014 E DB 36:31:09 N 136:43:20 E,36:33.9899 N 136:41.1907 E DP 36:33.9899 N 136:41.1907 E DP 36:34:38 N 136:40:33 E DP 36:36:04 N 136:42:43 E DP 36:41:08 N 136:54:43 E DP 36:40:35 N 136:55:12 E DP 36:39:40 N 136:55.9367 E DP 36:38.7224 N 136:56.635 E DP 36:37:46 N 136:57.2897 E DP 36:36:47 N 136:57:54 E AC E AN Komatsu TCA-4 AL 5000 FT AMSL AH 7000 FT AMSL DP 36:23:47 N 137:01:33 E V D=- V X=36:23.7891 N 136:24.3865 E DB 36:23:47 N 136:35:28 E,36:27:41 N 136:34:22 E DP 36:27:41 N 136:34:22 E DP 36:36:47 N 136:57:54 E DP 36:36:31 N 136:58.0727 E DP 36:35:31 N 136:58:38 E V D=+ V X=36:23:47 N 136:24:18 E DB 36:35:31 N 136:58:38 E,36:23:47 N 137:01:33 E AC E AN Komatsu TCA-5 AL 2000 FT AMSL AH 10000 FT AMSL DP 36:36:26 N 136:43:33 E DP 36:30:19 N 136:29:02 E DP 36:41:03 N 136:36:49 E DP 36:40.5893 N 136:37:46 E DP 36:40.088 N 136:38.686 E V X=36:23:47 N 136:24:18 E DB 36:40.088 N 136:38.686 E,36:36:26 N 136:43:33 E AC E AN Komatsu TCA-6 AL 2000 FT AMSL AH 7000 FT AMSL DP 36:36:04 N 136:42:43 E DP 36:29:32 N 136:32:54 E DP 36:29.2191 N 136:33:13 E DP 36:28:44 N 136:33.64 E DP 36:28:13 N 136:34:02 E DP 36:27:41 N 136:34:22 E V D=- V X=36:23:40 N 136:24.5049 E DB 36:25:58 N 136:29:56 E,36:28:02 N 136:27:23 E DP 36:28:02 N 136:27:23 E DP 36:30:19 N 136:29:02 E DP 36:36:04 N 136:42:43 E AC E AN Komatsu TCA-7 AL 3000 FT AMSL AH 7000 FT AMSL DP 36:31:09 N 136:43:20 E DP 36:27:41 N 136:34:22 E DP 36:28:03 N 136:34:09 E DP 36:28:34 N 136:33.7733 E DP 36:29:04 N 136:33.3568 E DP 36:29:32 N 136:32:54 E DP 36:34:38 N 136:40:33 E DP 36:34:37 N 136:40:35 E DP 36:33:58 N 136:41:13 E V X=36:23:47 N 136:24:18 E DB 36:33:58 N 136:41:13 E,36:31:09 N 136:43:20 E AC E AN Komatsu TCA-8 AL 1500 FT AMSL AH 7000 FT AMSL DP 36:30:19 N 136:29:02 E DP 36:28:02 N 136:27:23 E DP 36:28:09 N 136:27:08 E DP 36:28.321 N 136:26.6224 E DP 36:28:28 N 136:26:06 E DP 36:28.5572 N 136:25.5511 E DP 36:28:37 N 136:25:00 E DP 36:30:19 N 136:29:02 E AC E AN Komatsu TCA-9 AL 3000 FT AMSL AH 7000 FT AMSL V X=36:23.788 N 136:24.3554 E DB 36:27:41 N 136:34:22 E,36:23:47 N 136:35:28 E DP 36:23:47 N 136:35:28 E V D=- V X=36:23:39 N 136:24.4863 E DB 36:23:47 N 136:30:39 E,36:25:58 N 136:29:56 E DP 36:25:58 N 136:29:56 E DP 36:27:41 N 136:34:22 E AC E AN Kumamoto ACA-1 AL 700 FT AMSL AH 6000 FT AMSL DP 32:40:18 N 130:18:40 E DP 32:27:34 N 130:22:15 E DP 32:25:22 N 130:23:06 E DP 32:22:39 N 130:35:02 E DP 32:19:21 N 130:33:59 E V X=32:28:51 N 130:09:36 E DB 32:19:21 N 130:08:26 E,32:33:25 N 129:59:39 E DP 32:33:25 N 129:59:39 E DP 32:33:53 N 130:00:08 E DP 32:35:44 N 129:59:05 E DP 32:38:28 N 130:05:26 E DP 32:40:18 N 130:18:40 E AC E AN Kumamoto ACA-2 AL 700 FT AMSL AH 7000 FT AMSL DP 32:40:18 N 130:18:40 E DP 32:44:07 N 130:17:35 E DP 32:49:50 N 130:22:18 E DP 33:03:09 N 130:21:04 E DP 33:05:55 N 131:07:57 E DP 33:07:12 N 131:10:52 E DP 32:52:48 N 131:20:04 E DP 32:18:13 N 130:54:23 E DP 32:22:39 N 130:35:02 E DP 32:25:22 N 130:23:06 E DP 32:27:34 N 130:22:15 E DP 32:40:18 N 130:18:40 E AC E AN Kumamoto TCA-1 AL 6000 FT AMSL AH 9000 FT AMSL DP 33:03:09 N 130:21:04 E V D=- V X=32:50:14 N 130:51:19 E DB 33:03:55 N 130:33:57 E,32:43:07 N 130:29.1021 E DP 32:43:07 N 130:29.1021 E DP 32:42:21 N 130:29:31 E DP 32:41:28 N 130:27:03 E DP 32:39:02 N 130:20:19 E DP 32:38:36 N 130:19:09 E DP 32:44:07 N 130:17:35 E DP 32:49:50 N 130:22:18 E DP 33:03:09 N 130:21:04 E AC E AN Kumamoto TCA-10 AL 3000 FT AMSL AH 9000 FT AMSL V X=32:50:21 N 130:51:19 E DB 32:59:55 N 130:48:14 E,33:00:13 N 130:52:21 E DP 33:00:13 N 130:52:21 E V D=- V X=32:50:15 N 130:51:19 E DB 32:55:13 N 130:51:50 E,32:55:04 N 130:49:47 E DP 32:55:04 N 130:49:47 E DP 32:58:57 N 130:48:33 E DP 32:59:55 N 130:48:14 E AC E AN Kumamoto TCA-11 AL 3001 FT AMSL AH 9000 FT AMSL V X=32:50:14 N 130:51:19 E DC 5 AC E AN Kumamoto TCA-12 AL 6000 FT AMSL AH 9000 FT AMSL V X=32:50:14 N 130:51:19 E DB 32:58:26 N 130:58:09 E,32:43.4388 N 131:0.0560756 E DP 32:43.4388 N 131:0.0560756 E DP 32:43:08 N 130:59:41 E DP 32:46:41 N 130:55:30 E DP 32:47.0061 N 130:55.8676 E DP 32:47:22 N 130:56:12 E V D=- V X=32:50:14 N 130:51:19 E DB 32:47:22 N 130:56:12 E,32:54:20 N 130:54:44 E DP 32:54:20 N 130:54:44 E DP 32:58:26 N 130:58:09 E AC E AN Kumamoto TCA-13 AL 2600 FT AMSL AH 9000 FT AMSL DP 32:48:16 N 130:45:52 E DP 32:47.8572 N 130:46:05 E DP 32:47.4738 N 130:46.3523 E V D=- V X=32:50:14 N 130:51:19 E DB 32:47.4738 N 130:46.3523 E,32:45:24 N 130:49:47 E DP 32:45:24 N 130:49:47 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:40:33 N 130:48:15 E,32:46.0845 N 130:40:28 E DP 32:46.0845 N 130:40:28 E DP 32:46:17 N 130:40:25 E DP 32:47:52 N 130:44:46 E DP 32:48:16 N 130:45:52 E AC E AN Kumamoto TCA-14 AL 4000 FT AMSL AH 9000 FT AMSL V D=- V X=32:50:14 N 130:51:19 E DB 32:45:24 N 130:49:47 E,32:46:23 N 130:55:07 E DP 32:46:23 N 130:55:07 E DP 32:46:41 N 130:55:30 E DP 32:43:08 N 130:59:41 E DP 32:42:54 N 130:59.4355 E DP 32:42:29 N 130:58.8687 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:42:29 N 130:58.8687 E,32:40:33 N 130:48:15 E DP 32:40:33 N 130:48:15 E DP 32:45:24 N 130:49:47 E AC E AN Kumamoto TCA-15 AL 6500 FT AMSL AH 9000 FT AMSL DP 33:05:42 N 131:04:11 E V X=32:50:14 N 130:51:19 E DB 33:05:53 N 131:07:17 E,32:47.1352 N 131:15:33 E DP 32:47.1352 N 131:15:33 E DP 32:46:26 N 131:15:20 E DP 32:36:16 N 131:07:48 E DP 32:39:35 N 131:03:52 E DP 32:43:08 N 130:59:41 E DP 32:43:35 N 131:00:13 E DP 32:44.0682 N 131:00:42 E V D=- V X=32:50:14 N 130:51:19 E DB 32:44.0682 N 131:00:42 E,32:58:26 N 130:58:09 E DP 32:58:26 N 130:58:09 E DP 33:05:42 N 131:04:11 E AC E AN Kumamoto TCA-16 AL 5300 FT AMSL AH 9000 FT AMSL DP 32:41:09 N 130:46:20 E DP 32:40.8873 N 130:47:01 E DP 32:40:41 N 130:47:44 E V D=- V X=32:50.2346 N 130:51:19 E DB 32:40:41 N 130:47:44 E,32:40:15 N 130:50:17 E DP 32:40:15 N 130:50:17 E DP 32:35:16 N 130:49:46 E DP 32:19:38 N 130:48:10 E DP 32:22:25 N 130:36:03 E DP 32:32:03 N 130:41:20 E DP 32:41:09 N 130:46:20 E AC E AN Kumamoto TCA-17 AL 6000 FT AMSL AH 9000 FT AMSL V D=- V X=32:50:14 N 130:51:19 E DB 32:40:15 N 130:50:17 E,32:42.7896 N 130:59:18 E DP 32:42.7896 N 130:59:18 E DP 32:43:08 N 130:59:41 E DP 32:39:35 N 131:03:52 E DP 32:39:02 N 131:3.22003 E DP 32:38:32 N 131:2.51779 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:38:32 N 131:2.51779 E,32:35:16 N 130:49:46 E DP 32:35:16 N 130:49:46 E DP 32:40:15 N 130:50:17 E AC E AN Kumamoto TCA-18 AL 7000 FT AMSL AH 9000 FT AMSL DP 32:39:35 N 131:03:52 E DP 32:36:16 N 131:07:48 E DP 32:18:13 N 130:54:23 E DP 32:19:38 N 130:48:10 E V D=- V X=32:50:14 N 130:51:19 E DB 32:35:16 N 130:49:46 E,32:39:02 N 131:3.22003 E DP 32:39:02 N 131:3.22003 E DP 32:39:35 N 131:03:52 E AC E AN Kumamoto TCA-2 AL 5001 FT AMSL AH 9000 FT AMSL DP 32:41:28 N 130:27:03 E DP 32:37:25 N 130:26:13 E DP 32:35:14 N 130:23:20 E DP 32:39:02 N 130:20:19 E DP 32:41:28 N 130:27:03 E AC E AN Kumamoto TCA-3 AL 4000 FT AMSL AH 9000 FT AMSL DP 32:38:36 N 130:19:09 E DP 32:39:02 N 130:20:19 E DP 32:35:14 N 130:23:20 E DP 32:37:25 N 130:26:13 E DP 32:41:28 N 130:27:03 E DP 32:42:21 N 130:29:31 E DP 32:41.5061 N 130:29:53 E DP 32:40:43 N 130:30:22 E V D=- V X=32:50:14 N 130:51:19 E DB 32:40:43 N 130:30:22 E,32:32:03 N 130:41:20 E DP 32:32:03 N 130:41:20 E DP 32:22:25 N 130:36:03 E DP 32:22:55 N 130:33:51 E DP 32:23:28 N 130:32:42 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:23:28 N 130:32:42 E,32:32:26 N 130:21.1231 E DP 32:32:26 N 130:21.1231 E DP 32:33:04 N 130:20:42 E DP 32:38:36 N 130:19:09 E AC E AN Kumamoto TCA-4 AL 4000 FT AMSL AH 9000 FT AMSL DP 33:03:55 N 130:33:57 E V D=- V X=32:50:14 N 130:51:19 E DB 33:04:25 N 130:42:27 E,32:54:47 N 130:33:02 E DP 32:54:47 N 130:33:02 E DP 32:54:21 N 130:32:58 E DP 32:55:23 N 130:28:22 E DP 32:56.2523 N 130:28:37 E DP 32:57:06 N 130:28.9578 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:57:06 N 130:28.9578 E,33:03:55 N 130:33:57 E AC E AN Kumamoto TCA-5 AL 5000 FT AMSL AH 9000 FT AMSL DP 32:55:23 N 130:28:22 E V D=- V X=32:50:14 N 130:51:19 E DB 32:54:21 N 130:32:58 E,32:48:49 N 130:32:25 E DP 32:48:49 N 130:32:25 E DP 32:48:48 N 130:32:34 E DP 32:48:31 N 130:28:31 E DP 32:52:55 N 130:29:27 E DP 32:54:02 N 130:28:00 E DP 32:54.9063 N 130:28.2234 E DP 32:55:23 N 130:28:22 E AC E AN Kumamoto TCA-6 AL 5001 FT AMSL AH 9000 FT AMSL DP 32:48:31 N 130:28:31 E V X=32:50:14 N 130:51:19 E DB 32:46:27 N 130:27:41 E,32:53:12 N 130:27.5034 E DP 32:53:12 N 130:27.5034 E DP 32:54:02 N 130:28:00 E DP 32:52:55 N 130:29:27 E DP 32:48:31 N 130:28:31 E AC E AN Kumamoto TCA-7 AL 3400 FT AMSL AH 9000 FT AMSL DP 33:04:25 N 130:42:27 E DP 33:04:40 N 130:46:43 E DP 32:59:55 N 130:48:14 E V D=- V X=32:50:14 N 130:51:19 E DB 32:58:57 N 130:48:33 E,32:53:34 N 130:41.3345 E DP 32:53:34 N 130:41.3345 E DP 32:53:19 N 130:41:16 E V X=32:50.2399 N 130:51.2845 E DB 32:52:17 N 130:44:37 E,32:47:52 N 130:44:46 E DP 32:47:52 N 130:44:46 E DP 32:46:17 N 130:40:25 E DP 32:45:42 N 130:40.7077 E DP 32:45:09 N 130:41.0699 E V X=32:50:14 N 130:51:19 E DB 32:45:09 N 130:41.0699 E,32:41:09 N 130:46:20 E DP 32:41:09 N 130:46:20 E DP 32:32:03 N 130:41:20 E DP 32:32.2716 N 130:40:17 E DP 32:32.7014 N 130:39:21 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:32.7014 N 130:39:21 E,32:46:27 N 130:27:41 E DP 32:46:27 N 130:27:41 E DP 32:48:31 N 130:28:31 E DP 32:48:48 N 130:32:34 E DP 32:49:35 N 130:32.2716 E DP 32:50:23 N 130:32.2551 E V X=32:50:14 N 130:51:19 E DB 32:50:23 N 130:32.2551 E,33:04:25 N 130:42:27 E AC E AN Kumamoto TCA-8 AL 2000 FT AMSL AH 9000 FT AMSL DP 32:58:57 N 130:48:33 E V D=- V X=32:50:14 N 130:51:19 E DB 32:55:04 N 130:49:47 E,32:48:41 N 130:45:40 E DP 32:48:41 N 130:45:40 E DP 32:48:16 N 130:45:52 E V D=+ V X=32:50.2395 N 130:51:17 E DB 32:47:52 N 130:44:46 E,32:52:17 N 130:44:37 E DP 32:52:17 N 130:44:37 E DP 32:53:19 N 130:41:16 E DP 32:53:34 N 130:41.3345 E DP 32:54:07 N 130:41.6197 E V X=32:50:14 N 130:51:19 E DB 32:54:07 N 130:41.6197 E,32:58:57 N 130:48:33 E AC E AN Kumamoto TCA-9 AL 5000 FT AMSL AH 9000 FT AMSL DP 33:04:40 N 130:46:43 E DP 33:05:42 N 131:04:11 E DP 32:58:26 N 130:58:09 E V D=- V X=32:50:18 N 130:51:20 E DB 32:54:20 N 130:54:44 E,32:55:13 N 130:51:50 E DP 32:55:13 N 130:51:50 E V X=32:50:21 N 130:51:19 E DB 33:00:13 N 130:52:21 E,32:59:55 N 130:48:14 E DP 32:59:55 N 130:48:14 E DP 33:04:40 N 130:46:43 E AC E AN Matsushima ACA-1 AL 700 FT AMSL AH 6000 FT AMSL DP 39:00:00 N 141:08:21 E DP 38:12:17 N 141:00:54 E DP 38:12:36 N 140:49:17 E DP 38:12:42 N 140:49.2389 E DP 38:13:08 N 140:49:06 E V X=38:14:08 N 140:55:23 E DB 38:13:08 N 140:49:06 E,38:16:12 N 140:49:32 E DP 38:16:12 N 140:49:32 E V D=- V X=38:23:19 N 140:21:28 E DB 38:19:26 N 140:39:56 E,38:33.2578 N 140:35.8013 E DP 38:33.2578 N 140:35.8013 E DP 38:33:49 N 140:35:07 E DP 39:00:00 N 140:54:24 E DP 39:00:00 N 141:08:21 E AC E AN Matsushima ACA-2 AL 700 FT AMSL AH 10000 FT AMSL DP 39:00:00 N 141:33:51 E DP 38:44:08 N 141:22:01 E DP 38:11:28 N 141:03:41 E DP 38:12:17 N 141:00:54 E DP 39:00:00 N 141:08:21 E DP 39:00:00 N 141:33:51 E AC E AN Matsushima ACA-3 AL 700 FT AMSL AH FL140 DP 39:00:00 N 142:06:08 E DP 38:59:07 N 142:7.08993 E DP 38:57.9524 N 142:8.27404 E V X=38:24:11 N 141:12:43 E DB 38:57.9524 N 142:8.27404 E,38:26:23 N 142:22:49 E DP 38:26:23 N 142:22:49 E DP 37:55:58 N 141:49:42 E DP 38:11:28 N 141:03:41 E DP 38:44:08 N 141:22:01 E DP 39:00:00 N 141:33:51 E DP 39:00:00 N 142:06:08 E AC E AN Matsushima TCA-1 AL 4000 FT AMSL AH 6000 FT AMSL DP 38:53:52 N 141:07:21 E V D=- V X=38:24:14 N 141:12:38 E DB 38:43:16 N 141:05:42 E,38:34:01 N 140:50:41 E DP 38:34:01 N 140:50:41 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:39:02 N 140:39:25 E,38:53.7017 N 141:05:58 E DP 38:53.7017 N 141:05:58 E DP 38:53:52 N 141:07:21 E AC E AN Matsushima TCA-10 AL 5000 FT AMSL AH 10000 FT AMSL DP 38:29:13 N 141:50:27 E V D=- V X=38:24:15 N 141:12.7364 E DB 38:28:23 N 141:44:10 E,38:48:47 N 141:18:19 E DP 38:48:47 N 141:18:19 E V D=+ V X=38:24.187 N 141:12.7363 E DB 38:53:42 N 141:19:26 E,38:29:13 N 141:50:27 E AC E AN Matsushima TCA-2 AL 2000 FT AMSL AH 6000 FT AMSL DP 38:43:16 N 141:05:42 E V D=- V X=38:14:08 N 140:55:23 E DB 38:15:50 N 141:01:25 E,38:18:41 N 140:58:08 E DP 38:18:41 N 140:58:08 E DP 38:18:51 N 140:57:36 E DP 38:19.3858 N 140:57:19 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:19.3858 N 140:57:19 E,38:27.8678 N 140:56.8037 E DP 38:27.8678 N 140:56.8037 E DP 38:28:33 N 140:57:06 E V X=38:24:16 N 141:12:41 E DB 38:30:52 N 140:48:50 E,38:43:16 N 141:05:42 E AC E AN Matsushima TCA-3 AL 3500 FT AMSL AH 6000 FT AMSL V D=- V X=38:24:12 N 141:12.6677 E DB 38:28:33 N 140:57:06 E,38:21:51 N 140:56:25 E DP 38:21:51 N 140:56:25 E DP 38:20:37 N 140:47:48 E DP 38:21.2077 N 140:47.6683 E DP 38:22.0911 N 140:47.5208 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:22.0911 N 140:47.5208 E,38:30:52 N 140:48:50 E DP 38:30:52 N 140:48:50 E DP 38:28:33 N 140:57:06 E AC E AN Matsushima TCA-4 AL 3000 FT AMSL AH 6000 FT AMSL DP 38:21:51 N 140:56:25 E DP 38:21.5873 N 140:56.4692 E DP 38:20.8856 N 140:56:41 E DP 38:20:12 N 140:56.9379 E DP 38:19:31 N 140:57:15 E DP 38:18:51 N 140:57:36 E DP 38:18:59 N 140:57:09 E DP 38:19:05 N 140:56.5883 E V D=- V X=38:14:08 N 140:55:23 E DB 38:19:05 N 140:56.5883 E,38:16:12 N 140:49:32 E V D=+ V X=38:24.1231 N 141:12:25 E DB 38:16:12 N 140:49:32 E,38:20:37 N 140:47:48 E DP 38:20:37 N 140:47:48 E DP 38:21:51 N 140:56:25 E AC E AN Matsushima TCA-5 AL 5000 FT AMSL AH 6000 FT AMSL DP 38:12:16 N 141:01:20 E V X=38:14:08 N 140:55:23 E DB 38:12:36 N 140:49:17 E,38:12:16 N 141:01:20 E AC E AN Matsushima TCA-6 AL 4000 FT AMSL AH 10000 FT AMSL DP 38:53:42 N 141:19:26 E DP 38:48:47 N 141:18:19 E DP 38:48:41 N 141:19:04 E DP 38:48.4573 N 141:20:19 E V X=38:24:11 N 141:12:43 E DB 38:48.4573 N 141:20:19 E,38:28:23 N 141:44:10 E DP 38:28:23 N 141:44:10 E DP 38:27:12 N 141:35:21 E DP 38:28:01 N 141:35:10 E DP 38:28.8408 N 141:34:55 E V D=- V X=38:24:11 N 141:12:43 E DB 38:28.8408 N 141:34:55 E,38:41:54 N 141:16:45 E DP 38:41:54 N 141:16:45 E V X=38:24.2233 N 141:12.7059 E DB 38:43:44 N 141:17:10 E,38:43:16 N 141:05:42 E DP 38:43:16 N 141:05:42 E V D=+ V X=38:24.4217 N 141:12.6865 E DB 38:53:52 N 141:07:21 E,38:53:42 N 141:19:26 E AC E AN Matsushima TCA-7 AL 2000 FT AMSL AH 10000 FT AMSL DP 38:43:44 N 141:17:10 E V D=- V X=38:24:11 N 141:12.7227 E DB 38:29:06 N 141:13:50 E,38:20:57 N 141:17:34 E DP 38:20:57 N 141:17:34 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:11:20 N 141:32:01 E,38:05:50 N 141:22:23 E DP 38:05:50 N 141:22:23 E DP 38:05:31 N 141:21:19 E DP 38:12:16 N 141:01:20 E DP 38:12.3203 N 141:01:22 E DP 38:12:45 N 141:01:33 E V D=- V X=38:14:08 N 140:55:23 E DB 38:12:45 N 141:01:33 E,38:15:50 N 141:01:25 E DP 38:15:50 N 141:01:25 E DP 38:43:16 N 141:05:42 E DP 38:43.3021 N 141:5.85564 E DP 38:43.5239 N 141:06:58 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:43.5239 N 141:06:58 E,38:43:44 N 141:17:10 E AC E AN Matsushima TCA-8 AL 3000 FT AMSL AH 10000 FT AMSL V X=38:24:08 N 141:12:47 E DB 38:29:13 N 141:50:27 E,38:00:30 N 141:36:06 E DP 38:00:30 N 141:36:06 E DP 38:05:31 N 141:21:19 E DP 38:05:42 N 141:21.9738 E DP 38:06:03 N 141:23.0183 E V D=- V X=38:24:11 N 141:12:43 E DB 38:06:03 N 141:23.0183 E,38:11:20 N 141:32:01 E DP 38:11:20 N 141:32:01 E DP 38:20:57 N 141:17:34 E DP 38:21.1076 N 141:17.7353 E DP 38:21.4714 N 141:18:04 E V X=38:24:11 N 141:12:43 E DB 38:21.4714 N 141:18:04 E,38:29:06 N 141:13:50 E DP 38:29:06 N 141:13:50 E V D=+ V X=38:24:11 N 141:12:43 E DB 38:41:54 N 141:16:45 E,38:28.0344 N 141:35.1578 E DP 38:28.0344 N 141:35.1578 E DP 38:27:12 N 141:35:21 E DP 38:29:13 N 141:50:27 E AC E AN Matsushima TCA-9 AL 5000 FT AMSL AH 10000 FT AMSL V X=38:24:11 N 141:12:43 E DC 5 AC E AN Miho ACA-1 AL 700 FT AMSL AH FL150 DP 35:50:32 N 132:42:37 E DP 35:51:28 N 132:43:27 E DP 35:52:19 N 132:44.4029 E V X=35:29.6065 N 133:13.9517 E DB 35:52:19 N 132:44.4029 E,36:01:44 N 133:04:26 E DP 36:01:44 N 133:04:26 E DP 36:01:07 N 133:05:01 E DP 36:00:32 N 133:5.63688 E V D=- V X=36:10.6051 N 133:19.3699 E DB 36:00:32 N 133:5.63688 E,35:59:21 N 133:31:37 E V D=+ V X=35:29.6067 N 133:13.9517 E DB 35:59:21 N 133:31:37 E,35:47:15 N 133:48:18 E DP 35:47:15 N 133:48:18 E DP 35:46:20 N 133:48:51 E V X=35:29.6067 N 133:13.9517 E DB 35:41:25 N 133:40:58 E,35:35:51 N 133:43:38 E DP 35:35:51 N 133:43:38 E DP 35:34:56 N 133:43:53 E DP 35:35:44 N 133:11:52 E DP 35:50:32 N 132:42:37 E AC E AN Miho ACA-2 AL 700 FT AMSL AH 10000 FT AMSL DP 35:50:32 N 132:42:37 E DP 35:35:44 N 133:11:52 E DP 35:34:56 N 133:43:53 E DP 35:33.955 N 133:44:08 E DP 35:32.9682 N 133:44:19 E V X=35:29.6068 N 133:13.9513 E DB 35:32.9682 N 133:44:19 E,35:20:48 N 133:42:35 E DP 35:20:48 N 133:42:35 E DP 35:23:02 N 133:30:41 E DP 35:12:22 N 133:05:19 E V X=35:29.6067 N 133:13.9517 E DB 34:59:38 N 132:57:00 E,35:50:07 N 132:42:06 E DP 35:50:07 N 132:42:06 E DP 35:50:32 N 132:42:37 E AC E AN Miho ACA-3 AL 700 FT AMSL AH 8000 FT AMSL DP 35:20:48 N 133:42:35 E DP 35:20.106 N 133:42.3537 E DP 35:19.1896 N 133:41:52 E V X=35:29.6067 N 133:13.9517 E DB 35:19.1896 N 133:41:52 E,35:06:42 N 133:01:37 E DP 35:06:42 N 133:01:37 E DP 35:12:22 N 133:05:19 E DP 35:23:02 N 133:30:41 E DP 35:20:48 N 133:42:35 E AC E AN Misawa ACA-1 AL 700 FT AMSL AH FL150 DP 41:00:00 N 140:55:31 E DP 41:25:00 N 141:07:45 E V X=40:44:20 N 140:42:19 E DB 41:25:00 N 142:13:25 E,41:00:01 N 142:25:48 E DP 41:00:01 N 142:25:48 E DP 41:00:00 N 142:25:44 E DP 41:00:00 N 140:55:31 E AC E AN Misawa ACA-2 AL 9000 FT AMSL AH FL200 V X=40:44:20 N 140:42:19 E DB 40:59:27 N 140:55:15 E,40:56:07 N 141:00:19 E DP 40:56:07 N 141:00:19 E DP 40:55:37 N 141:00:50 E DP 40:55:16 N 141:1.18881 E V X=40:52:30 N 140:55:41 E DB 40:55:16 N 141:1.18881 E,40:48:34 N 140:59:45 E DP 40:48:34 N 140:59:45 E DP 40:43:48 N 140:47:35 E DP 40:59:27 N 140:55:15 E AC E AN Misawa ACA-3 AL 700 FT AMSL AH FL200 DP 41:00:00 N 140:55:31 E DP 41:00:00 N 142:25:44 E DP 40:58:15 N 142:26:13 E DP 40:56.486 N 142:26.573 E V X=40:44:20 N 140:42:19 E DB 40:56.486 N 142:26.573 E,40:05:35 N 142:13:57 E DP 40:05:35 N 142:13:57 E V X=40:42:14 N 141:22:52 E DB 39:49:51 N 141:44:56 E,39:55.9895 N 140:43:46 E DP 39:55.9895 N 140:43:46 E DP 39:56:14 N 140:43:24 E DP 40:14:53 N 140:42:59 E DP 40:43:48 N 140:47:35 E V D=- V X=40:52:30 N 140:55:41 E DB 40:48:34 N 140:59:45 E,40:55:23 N 141:01:05 E DP 40:55:23 N 141:01:05 E DP 40:55:37 N 141:00:50 E DP 40:56:17 N 141:00:08 E V X=40:44:20 N 140:42:19 E DB 40:56:17 N 141:00:08 E,40:59:27 N 140:55:15 E DP 40:59:27 N 140:55:15 E DP 41:00:00 N 140:55:31 E AC E AN Misawa ACA-4 AL 700 FT AMSL AH FL170 DP 40:05:35 N 142:13:57 E DP 40:04:02 N 142:12.8026 E DP 40:2.50423 N 142:11.5852 E DP 40:1.00145 N 142:10.3245 E DP 40:00:00 N 142:09:27 E DP 40:00:00 N 142:03:41 E DP 40:05:35 N 142:13:57 E AC E AN Misawa TCA-1 AL 1500 FT AMSL AH 10000 FT AMSL V X=40:42.2068 N 141:22.1199 E DB 41:08:07 N 141:42:00 E,40:22:51 N 141:52:15 E DP 40:22:51 N 141:52:15 E V D=- V X=40:33:08 N 141:28:02 E DB 40:34:16 N 141:34:26 E,40:37.6183 N 141:25.1878 E DP 40:37.6183 N 141:25.1878 E DP 40:37:38 N 141:25:11 E DP 40:37.7378 N 141:25.1078 E DP 40:37:48 N 141:25:15 E DP 40:38.0205 N 141:25:46 E V X=40:42:11 N 141:22:06 E DB 40:38.0205 N 141:25:46 E,40:37:33 N 141:24:34 E DP 40:37:33 N 141:24:34 E DP 40:37:44 N 141:25:06 E V X=40:33:08 N 141:27:59 E DB 40:37:37 N 141:25:11 E,40:33:12 N 141:21:28 E V D=+ V X=40:42:12 N 141:22.0888 E DB 40:33:12 N 141:21:28 E,40:49:10 N 141:14:37 E DP 40:49:10 N 141:14:37 E DP 40:49:10 N 141:24:47 E DP 40:51:51 N 141:29:47 E DP 40:52:12 N 141:29:47 E DP 41:08:07 N 141:42:00 E AC E AN Misawa TCA-10 AL 3500 FT AMSL AH 10000 FT AMSL DP 40:49:10 N 141:08:23 E DP 40:48:10 N 141:08:23 E DP 40:54:49 N 140:52:59 E DP 41:04:33 N 140:57:44 E DP 40:56:04 N 141:07:17 E DP 40:49:10 N 141:07:17 E DP 40:49:10 N 141:08:23 E AC E AN Misawa TCA-11 AL 3000 FT AMSL AH 10000 FT AMSL DP 41:08:07 N 141:42:00 E V D=- V X=40:42:13 N 141:22.1204 E DB 40:55:16 N 141:32:08 E,40:57:16 N 141:23:38 E DP 40:57:16 N 141:23:38 E DP 40:59:10 N 141:20:47 E DP 40:59:10 N 141:07:17 E DP 40:56:04 N 141:07:17 E DP 41:04:33 N 140:57:44 E DP 41:06:20 N 140:58:37 E DP 41:06:45 N 140:59.3572 E V D=+ V X=40:42:11 N 141:22:06 E DB 41:06:45 N 140:59.3572 E,41:08:07 N 141:42:00 E AC E AN Misawa TCA-2 AL 3000 FT AMSL AH 10000 FT AMSL DP 40:22:51 N 141:52:15 E DP 40:22:23 N 141:51:44 E DP 40:21.5691 N 141:50.7572 E V X=40:42:11 N 141:22:06 E DB 40:21.5691 N 141:50.7572 E,40:16:11 N 141:41:45 E DP 40:16:11 N 141:41:45 E DP 40:29:05 N 141:32:03 E DP 40:29.0221 N 141:31:55 E DP 40:28:40 N 141:31:00 E DP 40:28:52 N 141:31.474 E DP 40:29:07 N 141:31:58 E V D=- V X=40:33:07 N 141:28:02 E DB 40:29:07 N 141:31:58 E,40:34:16 N 141:34:26 E DP 40:34:16 N 141:34:26 E DP 40:22:51 N 141:52:15 E AC E AN Misawa TCA-3 AL 4000 FT AMSL AH 10000 FT AMSL DP 40:34:07 N 140:59:30 E V D=- V X=40:42:11 N 141:22:06 E DB 40:35:46 N 141:04:03 E,40:28:43 N 141:31:09 E DP 40:28:43 N 141:31:09 E DP 40:29:06 N 141:32:02 E DP 40:16:11 N 141:41:45 E DP 40:15:45 N 141:40.7405 E DP 40:15:15 N 141:39:28 E DP 40:14:47 N 141:38:10 E DP 40:14.3561 N 141:36.8407 E DP 40:13:58 N 141:35:30 E V D=+ V X=40:42:11 N 141:22:06 E DB 40:24:19 N 141:30:36 E,40:33.3183 N 140:59:58 E DP 40:33.3183 N 140:59:58 E DP 40:34:07 N 140:59:30 E AC E AN Misawa TCA-4 AL 5000 FT AMSL AH 10000 FT AMSL DP 40:29:27 N 140:46:27 E DP 40:34:07 N 140:59:30 E DP 40:33.3183 N 140:59:58 E DP 40:32.558 N 141:0.520297 E V D=- V X=40:42:11 N 141:22:06 E DB 40:32.558 N 141:0.520297 E,40:24:19 N 141:30:36 E DP 40:24:19 N 141:30:36 E V D=+ V X=40:42:11 N 141:22:06 E DB 40:13:58 N 141:35:30 E,40:28:49 N 140:46:44 E DP 40:28:49 N 140:46:44 E DP 40:29:27 N 140:46:27 E AC E AN Misawa TCA-5 AL 3000 FT AMSL AH 10000 FT AMSL DP 40:28:40 N 141:31:00 E DP 40:28.6227 N 141:30:55 E DP 40:28:18 N 141:29.9888 E V X=40:42:11 N 141:22:06 E DB 40:28:18 N 141:29.9888 E,40:35:46 N 141:04:03 E DP 40:35:46 N 141:04:03 E V D=- V X=40:42:11 N 141:22:06 E DB 40:43:00 N 141:06:19 E,40:37:43 N 141:07:26 E DP 40:37:43 N 141:07:26 E DP 40:37:05 N 141:07:48 E DP 40:37:31 N 141:08:59 E DP 40:37.4375 N 141:09:01 E DP 40:36:51 N 141:09:25 E V X=40:42:11 N 141:22:06 E DB 40:36:51 N 141:09:25 E,40:32:39 N 141:14:52 E DP 40:32:39 N 141:14:52 E V X=40:42.0745 N 141:22:05 E DB 40:34:23 N 141:16:11 E,40:33:12 N 141:21:28 E V X=40:33:07 N 141:28.0362 E DB 40:33:12 N 141:21:28 E,40:28:40 N 141:31:00 E AC E AN Misawa TCA-6 AL 2000 FT AMSL AH 10000 FT AMSL DP 40:34:23 N 141:16:11 E V X=40:42:11 N 141:22:06 E DB 40:32:39 N 141:14:52 E,40:36.9205 N 141:09:22 E DP 40:36.9205 N 141:09:22 E DP 40:37:31 N 141:08:59 E V X=40:42:12 N 141:21:58 E DB 40:42:12 N 141:08:55 E,40:44:22 N 141:09:14 E DP 40:44:22 N 141:09:14 E DP 40:49:10 N 141:09:14 E DP 40:49:10 N 141:14:37 E DP 40:49:09 N 141:14:34 E DP 40:48:45 N 141:13.9719 E V D=- V X=40:42:11 N 141:22:06 E DB 40:48:45 N 141:13.9719 E,40:34:23 N 141:16:11 E AC E AN Misawa TCA-7 AL 2500 FT AMSL AH 10000 FT AMSL DP 40:49:10 N 141:09:14 E V D=- V X=40:42:14 N 141:21:43 E DB 40:44:22 N 141:09:14 E,40:42:12 N 141:08:55 E DP 40:42:12 N 141:08:55 E DP 40:37:31 N 141:08:59 E DP 40:37:05 N 141:07:48 E DP 40:37:30 N 141:07:33 E DP 40:38:09 N 141:07:13 E V D=+ V X=40:42:11 N 141:22:06 E DB 40:38:09 N 141:07:13 E,40:48:10 N 141:08:23 E DP 40:48:10 N 141:08:23 E DP 40:49:10 N 141:08:23 E DP 40:49:10 N 141:09:14 E AC E AN Misawa TCA-8 AL 4400 FT AMSL AH 10000 FT AMSL V D=- V X=40:42.2178 N 141:22.0046 E DB 40:48:10 N 141:08:23 E,40:43:00 N 141:06:19 E DP 40:43:00 N 141:06:19 E DP 40:35:46 N 141:04:03 E V D=+ V X=40:42:13 N 141:22:01 E DB 40:35:24 N 141:03:01 E,40:50:09 N 141:03:48 E DP 40:50:09 N 141:03:48 E DP 40:48:10 N 141:08:23 E AC E AN Misawa TCA-9 AL 6300 FT AMSL AH 10000 FT AMSL DP 40:50:09 N 141:03:48 E DP 40:50:01 N 141:03:42 E DP 40:49:19 N 141:3.20191 E V D=- V X=40:42:11 N 141:22:06 E DB 40:49:19 N 141:3.20191 E,40:35:24 N 141:03:01 E DP 40:35:24 N 141:03:01 E DP 40:29:27 N 140:46:27 E DP 40:30:00 N 140:46:07 E DP 40:31:00 N 140:45:33 E DP 40:43:48 N 140:47:35 E DP 40:54:49 N 140:52:59 E DP 40:50:09 N 141:03:48 E AC E AN Nagasaki ACA-1 AL 700 FT AMSL AH 10000 FT AMSL DP 33:32:57 N 129:58:00 E V D=- V X=33:08:54 N 130:17:34 E DB 33:19:29 N 130:10:48 E,33:10.5896 N 130:3.37267 E DP 33:10.5896 N 130:3.37267 E V D=+ V X=32:54:19 N 129:55:05 E DB 33:09:54 N 130:03:18 E,33:2.53888 N 130:12.8695 E DP 33:2.53888 N 130:12.8695 E V D=- V X=33:08:54 N 130:17.5686 E DB 33:01:47 N 130:13:16 E,33:01:32 N 130:21:13 E DP 33:01:32 N 130:21:13 E DP 32:49:50 N 130:22:18 E DP 32:44:07 N 130:17:35 E DP 32:40:18 N 130:18:40 E DP 32:38:28 N 130:05:26 E DP 32:35:44 N 129:59:05 E V X=32:28:51 N 130:09:36 E DB 32:33:53 N 130:00:08 E,32:25.9414 N 129:58:58 E DP 32:25.9414 N 129:58:58 E DP 32:25:22 N 129:59:13 E DP 32:25:22 N 129:30:21 E DP 32:57:52 N 129:12:35 E DP 33:30:46 N 129:41:36 E DP 33:30.4214 N 129:42.0024 E DP 33:30:14 N 129:42:55 E V X=33:45:08 N 129:46:56 E DB 33:30:14 N 129:42:55 E,33:32:57 N 129:58:00 E AC E AN Nagasaki ACA-2 AL 6000 FT AMSL AH 10000 FT AMSL DP 32:25:22 N 129:59:13 E DP 32:25.9414 N 129:58:58 E DP 32:26:32 N 129:58:46 E V X=32:28:51 N 130:09:36 E DB 32:26:32 N 129:58:46 E,32:33:53 N 130:00:08 E DP 32:33:53 N 130:00:08 E DP 32:35:44 N 129:59:05 E DP 32:38:28 N 130:05:26 E DP 32:40:18 N 130:18:40 E DP 32:27:34 N 130:22:15 E DP 32:25:22 N 130:23:06 E DP 32:25:22 N 129:59:13 E AC E AN Nagasaki TCA-1 AL 4000 FT AMSL AH 10000 FT AMSL DP 33:11:20 N 129:24:50 E DP 33:12:18 N 129:25.4689 E DP 33:13:11 N 129:26.239 E V X=32:55:01 N 129:54:49 E DB 33:13:11 N 129:26.239 E,33:25:02 N 129:56:42 E DP 33:25:02 N 129:56:42 E V D=- V X=32:55:01 N 129:54:49 E DB 33:15:02 N 129:56:04 E,33:13.1527 N 129:44:38 E DP 33:13.1527 N 129:44:38 E DP 33:12:52 N 129:44:00 E V X=32:55:01 N 129:54:49 E DB 33:17:19 N 129:41:17 E,33:8.72416 N 129:29.8559 E DP 33:8.72416 N 129:29.8559 E DP 33:08:36 N 129:29:50 E DP 33:11:20 N 129:24:50 E AC E AN Nagasaki TCA-10 AL 5000 FT AMSL AH 10000 FT AMSL DP 33:11:20 N 129:24:50 E V D=- V X=32:55:01 N 129:54:49 E DB 33:08:36 N 129:29:50 E,33:05:05 N 129:27:35 E DP 33:05:05 N 129:27:35 E DP 33:04:45 N 129:27:26 E DP 33:03:35 N 129:30:43 E DP 33:2.73545 N 129:30.2358 E DP 33:01:51 N 129:29.868 E V X=32:55:01 N 129:54:49 E DB 33:01:51 N 129:29.868 E,32:36:21 N 129:40:56 E DP 32:36:21 N 129:40:56 E DP 32:35:12 N 129:38:52 E V D=+ V X=32:55:01 N 129:54:49 E DB 32:35:12 N 129:28:05 E,33:10.8221 N 129:24.4382 E DP 33:10.8221 N 129:24.4382 E DP 33:11:20 N 129:24:50 E AC E AN Nagasaki TCA-11 AL 4000 FT AMSL AH 10000 FT AMSL DP 33:03:35 N 129:30:43 E DP 33:02:02 N 129:35:06 E DP 33:01:15 N 129:34:44 E DP 33:00:27 N 129:34.4025 E DP 32:59:38 N 129:34.1217 E DP 32:59:03 N 129:33:58 E DP 32:58:23 N 129:37:27 E DP 32:57.6372 N 129:37:12 E DP 32:56.871 N 129:37:04 E V D=- V X=32:55:01 N 129:54:49 E DB 32:56.871 N 129:37:04 E,32:41:30 N 129:47:02 E DP 32:41:30 N 129:47:02 E DP 32:38:55 N 129:45:34 E V D=+ V X=32:55:01 N 129:54:49 E DB 32:36:21 N 129:40:56 E,33:3.45709 N 129:30.5736 E DP 33:3.45709 N 129:30.5736 E DP 33:03:35 N 129:30:43 E AC E AN Nagasaki TCA-12 AL 4000 FT AMSL AH 10000 FT AMSL DP 32:58:23 N 129:37:27 E DP 32:56:08 N 129:49:02 E DP 32:55:42 N 129:48.9053 E DP 32:55.254 N 129:48.8565 E V D=- V X=32:55:01 N 129:54:49 E DB 32:55.254 N 129:48.8565 E,32:50:22 N 129:57:02 E DP 32:50:22 N 129:57:02 E DP 32:47:35 N 129:58:22 E DP 32:47.3876 N 129:57.7352 E DP 32:47:14 N 129:57.0875 E V D=+ V X=32:55:01 N 129:54:49 E DB 32:47:14 N 129:57.0875 E,32:47:09 N 129:53:00 E DP 32:47:09 N 129:53:00 E V X=32:54.8353 N 129:54.7533 E DB 32:45:11 N 129:52:33 E,32:46:00 N 129:49:37 E DP 32:46:00 N 129:49:37 E V X=32:55:01 N 129:54:49 E DB 32:41:30 N 129:47:02 E,32:58.3037 N 129:37.3566 E DP 32:58.3037 N 129:37.3566 E DP 32:58:23 N 129:37:27 E AC E AN Nagasaki TCA-13 AL 3001 FT AMSL AH 10000 FT AMSL DP 32:58:40 N 129:58:52 E V X=32:55:01 N 129:54:49 E DB 32:57:57 N 129:58:04 E,32:55.1062 N 129:59.587 E DP 32:55.1062 N 129:59.587 E DP 32:54:48 N 129:59:34 E V X=32:55.0205 N 129:54.8202 E DB 32:54:45 N 130:00:45 E,32:58:40 N 129:58:52 E AC E AN Nagasaki TCA-14 AL 5000 FT AMSL AH 10000 FT AMSL DP 32:58:40 N 129:58:52 E V X=32:55:01 N 129:54:49 E DB 33:06:00 N 130:07:00 E,32:54.9712 N 130:12.6858 E DP 32:54.9712 N 130:12.6858 E DP 32:54:12 N 130:12:36 E DP 32:54:45 N 130:00:45 E DP 32:54:48 N 129:59:34 E DP 32:55.1062 N 129:59.587 E DP 32:55.5052 N 129:59.5527 E V D=- V X=32:55:01 N 129:54:49 E DB 32:55.5052 N 129:59.5527 E,32:57:57 N 129:58:04 E DP 32:57:57 N 129:58:04 E DP 32:58:40 N 129:58:52 E AC E AN Nagasaki TCA-15 AL 6000 FT AMSL AH 10000 FT AMSL DP 33:06:00 N 130:07:00 E V X=32:54:19 N 129:55:05 E DB 33:07:12 N 130:08:20 E,33:2.03509 N 130:13.1539 E DP 33:2.03509 N 130:13.1539 E DP 33:01:47 N 130:13:16 E DP 33:1.54031 N 130:13.8745 E V D=- V X=33:08:54 N 130:17:34 E DB 33:1.54031 N 130:13.8745 E,33:00:55 N 130:17:32 E V D=+ V X=32:55:01 N 129:54:49 E DB 33:00:55 N 130:17:32 E,32:54.7532 N 130:18:35 E DP 32:54.7532 N 130:18:35 E DP 32:53:55 N 130:18:32 E DP 32:54:12 N 130:12:36 E DP 32:54.9712 N 130:12.6858 E DP 32:55:45 N 130:12:40 E V D=- V X=32:55:01 N 129:54:49 E DB 32:55:45 N 130:12:40 E,33:06:00 N 130:07:00 E AC E AN Nagasaki TCA-16 AL 8000 FT AMSL AH 10000 FT AMSL DP 33:13:40 N 130:16:18 E DP 33:09:15 N 130:20:28 E DP 32:53:45 N 130:21:56 E DP 32:53:55 N 130:18:32 E DP 32:54.8076 N 130:18:37 E DP 32:55.7011 N 130:18.6043 E V D=- V X=32:55:01 N 129:54:49 E DB 32:55.7011 N 130:18.6043 E,33:09:30 N 130:11:14 E DP 33:09:30 N 130:11:14 E DP 33:13:40 N 130:16:18 E AC E AN Nagasaki TCA-17 AL 5000 FT AMSL AH 10000 FT AMSL DP 32:47:35 N 129:58:22 E DP 32:41:05 N 130:01:28 E DP 32:41.036 N 130:1.3373 E DP 32:40.7723 N 130:0.471865 E V X=32:55:01 N 129:54:49 E DB 32:40.7723 N 130:0.471865 E,32:41:30 N 129:47:02 E DP 32:41:30 N 129:47:02 E V D=- V X=32:54:50 N 129:54.7521 E DB 32:46:00 N 129:49:37 E,32:45:11 N 129:52:33 E DP 32:45:11 N 129:52:33 E V X=32:55:01 N 129:54:49 E DB 32:47:09 N 129:53:00 E,32:47.3876 N 129:57.7352 E DP 32:47.3876 N 129:57.7352 E DP 32:47:35 N 129:58:22 E AC E AN Nagasaki TCA-18 AL 2500 FT AMSL AH 10000 FT AMSL DP 32:54:45 N 130:00:45 E DP 32:54:12 N 130:12:36 E DP 32:53.4246 N 130:12:36 E DP 32:52.6569 N 130:12.4743 E V X=32:55:01 N 129:54:49 E DB 32:52.6569 N 130:12.4743 E,32:41:05 N 130:01:28 E DP 32:41:05 N 130:01:28 E DP 32:47:35 N 129:58:22 E V D=- V X=32:55:01 N 129:54:49 E DB 32:50:22 N 129:57:02 E,32:54:26 N 130:0.741416 E DP 32:54:26 N 130:0.741416 E DP 32:54:45 N 130:00:45 E AC E AN Nagasaki TCA-19 AL 5000 FT AMSL AH 10000 FT AMSL DP 32:54:12 N 130:12:36 E DP 32:53:55 N 130:18:32 E DP 32:53:02 N 130:18:28 E DP 32:52.1394 N 130:18.3343 E V X=32:55:01 N 129:54:49 E DB 32:52.1394 N 130:18.3343 E,32:48:39 N 130:17:20 E V D=- V X=32:45:41 N 130:17:56 E DB 32:48:39 N 130:17:20 E,32:44:24 N 130:14:42 E DP 32:44:24 N 130:14:42 E DP 32:44:14 N 130:14:49 E DP 32:43:30 N 130:14.222 E DP 32:42:47 N 130:13.5887 E DP 32:42:33 N 130:13:14 E V X=32:55:01 N 129:54:49 E DB 32:45:32 N 130:08:37 E,32:54:02 N 130:12.62 E DP 32:54:02 N 130:12.62 E DP 32:54:12 N 130:12:36 E AC E AN Nagasaki TCA-2 AL 6000 FT AMSL AH 10000 FT AMSL V X=32:55:01 N 129:54:49 E DB 33:25:02 N 129:56:42 E,33:23.3033 N 130:06:58 E DP 33:23.3033 N 130:06:58 E DP 33:23:11 N 130:07:11 E V D=- V X=33:08:54 N 130:17:34 E DB 33:19:30 N 130:10:46 E,33:13:26 N 130:04:15 E DP 33:13:26 N 130:04:15 E DP 33:13:24 N 130:04:17 E DP 33:13.757 N 130:3.30244 E DP 33:14.0563 N 130:02:18 E V X=32:55:01 N 129:54:49 E DB 33:14.0563 N 130:02:18 E,33:15:02 N 129:56:04 E DP 33:15:02 N 129:56:04 E DP 33:25:02 N 129:56:42 E AC E AN Nagasaki TCA-20 AL 6000 FT AMSL AH 10000 FT AMSL DP 32:53:55 N 130:18:32 E DP 32:53:45 N 130:21:56 E DP 32:49:50 N 130:22:18 E DP 32:44:07 N 130:17:35 E DP 32:40:18 N 130:18:40 E DP 32:40:01 N 130:16:38 E DP 32:42:33 N 130:13:14 E DP 32:42:47 N 130:13.5887 E DP 32:43:30 N 130:14.222 E DP 32:44:14 N 130:14:49 E DP 32:44:24 N 130:14:42 E DP 32:44:43 N 130:14:33 E V X=32:45:41 N 130:17:56 E DB 32:44:43 N 130:14:33 E,32:48:39 N 130:17:20 E V D=- V X=32:55:01 N 129:54.8178 E DB 32:48:39 N 130:17:20 E,32:53:02 N 130:18:28 E DP 32:53:02 N 130:18:28 E DP 32:53:55 N 130:18:32 E AC E AN Nagasaki TCA-21 AL 5000 FT AMSL AH 10000 FT AMSL V D=- V X=32:55:01 N 129:54:49 E DB 32:41:30 N 129:47:02 E,32:41.036 N 130:1.3373 E DP 32:41.036 N 130:1.3373 E DP 32:41:05 N 130:01:28 E DP 32:37:30 N 130:03:11 E DP 32:35:44 N 129:59:05 E DP 32:33:53 N 130:00:08 E DP 32:33:23 N 129:59:47 E DP 32:33:13 N 129:58.688 E V D=+ V X=32:55.0179 N 129:54:49 E DB 32:33:13 N 129:58.688 E,32:32:59 N 129:54:01 E DP 32:32:59 N 129:54:01 E DP 32:35:12 N 129:52:52 E DP 32:40:12 N 129:47:52 E DP 32:38:55 N 129:45:34 E DP 32:41:30 N 129:47:02 E AC E AN Nagasaki TCA-22 AL 3000 FT AMSL AH 10000 FT AMSL V D=- V X=32:55:01 N 129:54:49 E DB 32:41:05 N 130:01:28 E,32:45.0568 N 130:8.18555 E DP 32:45.0568 N 130:8.18555 E DP 32:45:32 N 130:08:37 E DP 32:42:33 N 130:13:14 E DP 32:41.7863 N 130:12:40 E DP 32:41:08 N 130:11:57 E V D=+ V X=32:55:01 N 129:54:49 E DB 32:41:08 N 130:11:57 E,32:38:58 N 130:09:01 E DP 32:38:58 N 130:09:01 E DP 32:38:28 N 130:05:26 E DP 32:37:30 N 130:03:11 E DP 32:41:05 N 130:01:28 E AC E AN Nagasaki TCA-23 AL 4000 FT AMSL AH 10000 FT AMSL DP 32:42:33 N 130:13:14 E DP 32:40:01 N 130:16:38 E V D=- V X=32:55:01 N 129:54:49 E DB 32:38:58 N 130:09:01 E,32:41.7863 N 130:12:40 E DP 32:41.7863 N 130:12:40 E DP 32:42:33 N 130:13:14 E AC E AN Nagasaki TCA-24 AL 6000 FT AMSL AH 10000 FT AMSL V D=- V X=32:55:01 N 129:54:49 E DB 32:32:59 N 129:54:01 E,32:33.3369 N 129:59:34 E DP 32:33.3369 N 129:59:34 E V X=32:28:51 N 130:09:36 E DB 32:33:23 N 129:59:47 E,32:25.6574 N 129:59.0749 E DP 32:25.6574 N 129:59.0749 E DP 32:25:22 N 129:59:13 E DP 32:25:22 N 129:57:59 E DP 32:32:59 N 129:54:01 E AC E AN Nagasaki TCA-25 AL 6001 FT AMSL AH 10000 FT AMSL DP 32:37:30 N 130:03:11 E DP 32:38:28 N 130:05:26 E DP 32:38:58 N 130:09:01 E DP 32:40:01 N 130:16:38 E DP 32:40:18 N 130:18:40 E V X=32:55:01 N 129:54:49 E DB 32:34:08 N 130:20:24 E,32:25:25 N 130:00:31 E DP 32:25:25 N 130:00:31 E DP 32:25:22 N 129:59:13 E DP 32:25:38 N 129:59.09 E DP 32:26:13 N 129:58:52 E V X=32:28:51 N 130:09:36 E DB 32:26:13 N 129:58:52 E,32:33:53 N 130:00:08 E DP 32:33:53 N 130:00:08 E DP 32:35:44 N 129:59:05 E DP 32:37:30 N 130:03:11 E AC E AN Nagasaki TCA-3 AL 3000 FT AMSL AH 10000 FT AMSL DP 33:04:45 N 129:27:26 E DP 33:05:42 N 129:27.8386 E DP 33:6.58832 N 129:28:22 E V X=32:55:01 N 129:54:49 E DB 33:6.58832 N 129:28:22 E,33:17:19 N 129:41:17 E DP 33:17:19 N 129:41:17 E DP 33:12:52 N 129:44:00 E DP 33:08:24 N 129:46:42 E DP 33:07:31 N 129:47:15 E DP 33:07:10 N 129:46:28 E DP 33:6.76819 N 129:45.7028 E DP 33:06:21 N 129:44:58 E DP 33:06:13 N 129:44:47 E V D=- V X=32:55:01 N 129:54:49 E DB 33:09:24 N 129:41:55 E,33:02:09 N 129:35.1188 E DP 33:02:09 N 129:35.1188 E DP 33:02:02 N 129:35:06 E DP 33:04:45 N 129:27:26 E AC E AN Nagasaki TCA-4 AL 3700 FT AMSL AH 10000 FT AMSL DP 33:12:52 N 129:44:00 E DP 33:13:17 N 129:44.951 E DP 33:13:38 N 129:45.935 E V X=32:55:01 N 129:54:49 E DB 33:13:38 N 129:45.935 E,33:15:02 N 129:56:04 E DP 33:15:02 N 129:56:04 E V D=- V X=32:55:01 N 129:54:49 E DB 33:10:01 N 129:55:45 E,33:08:27 N 129:46.7911 E DP 33:08:27 N 129:46.7911 E DP 33:08:24 N 129:46:42 E DP 33:12:52 N 129:44:00 E AC E AN Nagasaki TCA-5 AL 2000 FT AMSL AH 10000 FT AMSL DP 33:07:31 N 129:47:15 E DP 33:06:37 N 129:47:47 E DP 33:02:09 N 129:50:30 E DP 33:02:17 N 129:50:47 E DP 33:02:30 N 129:51:24 E V D=- V X=32:55:01 N 129:54:49 E DB 32:59:42 N 129:52:41 E,32:56.5719 N 129:49.1378 E DP 32:56.5719 N 129:49.1378 E DP 32:56:08 N 129:49:02 E DP 32:58:23 N 129:37:27 E DP 32:59:03 N 129:33:58 E DP 32:59.7409 N 129:34.1226 E DP 33:0.554185 N 129:34:25 E V D=+ V X=32:55:01 N 129:54:49 E DB 33:0.554185 N 129:34:25 E,33:09:24 N 129:41:55 E DP 33:09:24 N 129:41:55 E DP 33:06:13 N 129:44:47 E DP 33:06:21 N 129:44:58 E DP 33:6.76819 N 129:45.7028 E DP 33:07:10 N 129:46:28 E DP 33:07:31 N 129:47:15 E AC E AN Nagasaki TCA-6 AL 2300 FT AMSL AH 10000 FT AMSL DP 33:06:37 N 129:47:47 E DP 33:06:56 N 129:48:34 E DP 33:07:10 N 129:49:16 E DP 33:02:30 N 129:51:24 E DP 33:02:17 N 129:50:47 E DP 33:02:09 N 129:50:30 E DP 33:06:37 N 129:47:47 E AC E AN Nagasaki TCA-7 AL 3000 FT AMSL AH 10000 FT AMSL DP 33:08:24 N 129:46:42 E DP 33:8.74005 N 129:47:32 E DP 33:9.0371 N 129:48.386 E V X=32:55:01 N 129:54:49 E DB 33:9.0371 N 129:48.386 E,33:08:51 N 130:01:48 E DP 33:08:51 N 130:01:48 E V D=- V X=32:55:03 N 129:54.8075 E DB 32:59:38 N 129:57:09 E,32:59:42 N 129:52:41 E DP 32:59:42 N 129:52:41 E DP 33:02:30 N 129:51:24 E DP 33:07:10 N 129:49:16 E DP 33:06:54 N 129:48.4705 E DP 33:06:37 N 129:47:47 E DP 33:07:31 N 129:47:15 E DP 33:08:24 N 129:46:42 E AC E AN Nagasaki TCA-8 AL 4000 FT AMSL AH 10000 FT AMSL V D=- V X=33:08:54 N 130:17:34 E DB 33:13:24 N 130:04:17 E,33:10.5887 N 130:03:23 E DP 33:10.5887 N 130:03:23 E V D=+ V X=32:54:19 N 129:55:05 E DB 33:09:54 N 130:03:18 E,33:07:45 N 130:7.59153 E DP 33:07:45 N 130:7.59153 E DP 33:07:12 N 130:08:20 E DP 33:06:00 N 130:07:00 E DP 32:58:40 N 129:58:52 E DP 32:58:57 N 129:58.5233 E DP 32:59:13 N 129:58.0905 E DP 32:59.4403 N 129:57:38 E DP 32:59:38 N 129:57:09 E V D=- V X=32:55.0675 N 129:54.8247 E DB 33:08:51 N 130:01:48 E,33:10:01 N 129:55:45 E DP 33:10:01 N 129:55:45 E V D=+ V X=32:55:01 N 129:54:49 E DB 33:15:02 N 129:56:04 E,33:13.757 N 130:3.30244 E DP 33:13.757 N 130:3.30244 E DP 33:13:24 N 130:04:17 E AC E AN Nagasaki TCA-9 AL 6001 FT AMSL AH 10000 FT AMSL DP 33:19:30 N 130:10:46 E DP 33:13:40 N 130:16:18 E V X=32:55:01 N 129:54:49 E DB 33:09:30 N 130:11:14 E,33:1.77283 N 130:17:14 E DP 33:1.77283 N 130:17:14 E V X=33:08:54 N 130:17:34 E DB 33:00:55 N 130:17:32 E,33:1.54031 N 130:13.8745 E DP 33:1.54031 N 130:13.8745 E DP 33:01:47 N 130:13:16 E DP 33:02:07 N 130:13.1368 E V D=- V X=32:54:19 N 129:55:05 E DB 33:02:07 N 130:13.1368 E,33:09:54 N 130:03:18 E DP 33:09:54 N 130:03:18 E DP 33:10.0738 N 130:03:16 E DP 33:10:46 N 130:3.36953 E V D=+ V X=33:08:54 N 130:17:34 E DB 33:10:46 N 130:3.36953 E,33:19:30 N 130:10:46 E AC E AN Naha ACA-1 AL 700 FT AMSL AH FL160 V D=- V X=26:12:31 N 127:38:34 E DB 26:52:03 N 126:48:26 E,25:54:08 N 126:35:15 E DP 25:54:08 N 126:35:15 E V D=+ V X=26:22:17 N 126:43:19 E DB 25:53:00 N 126:35:47 E,26:52:03 N 126:48:26 E AC E AN Naha ACA-2 AL 700 FT AMSL AH FL200 DP 26:52:03 N 126:48:26 E DP 26:53:19 N 126:49:27 E DP 26:54.4374 N 126:50:39 E V X=26:12:31 N 127:38:34 E DB 26:54.4374 N 126:50:39 E,25:14:00 N 127:24:04 E DP 25:14:00 N 127:24:04 E V X=26:12:31 N 127:38:34 E DB 25:23:17 N 127:28:04 E,25:51:55 N 126:47.7028 E DP 25:51:55 N 126:47.7028 E V X=26:22.2887 N 126:43:20 E DB 25:52:29 N 126:47:41 E,26:52:03 N 126:48:26 E AC E AN Naha TCA-1 AL 2000 FT AMSL AH 10000 FT AMSL DP 26:37.7733 N 127:6.87333 E DP 26:38:46 N 127:07:43 E DP 26:39:39 N 127:08:41 E V X=26:12:31 N 127:38:34 E DB 26:39:39 N 127:08:41 E,26:50:05 N 127:31:25 E DP 26:50:05 N 127:31:25 E V D=- V X=26:12:31 N 127:38:34 E DB 26:42:25 N 127:34:53 E,26:25.2896 N 127:08:11 E DP 26:25.2896 N 127:08:11 E DP 26:24:31 N 127:07:57 E DP 26:24:44 N 127:07:45 E DP 26:24:55 N 127:07:30 E DP 26:25.0559 N 127:07:14 E DP 26:25:10 N 127:6.9385 E DP 26:25:11 N 127:6.89 E DP 26:37.7733 N 127:6.87333 E AC E AN Naha TCA-2 AL 2000 FT AMSL AH 3999 FT AMSL DP 26:23:00 N 127:51:18 E DP 26:29:25 N 127:59:07 E DP 26:28.721 N 127:59.9238 E DP 26:27:57 N 128:00:38 E V X=26:12:31 N 127:38:34 E DB 26:27:57 N 128:00:38 E,25:47:32 N 127:40:59 E DP 25:47:32 N 127:40:59 E DP 25:52:32 N 127:40:30 E DP 26:02:32 N 127:39:32 E DP 26:01:52 N 127:40:20 E DP 26:01:59 N 127:41:03 E V D=- V X=26:12:31 N 127:38:34 E DB 26:01:59 N 127:41:03 E,26:17:17 N 127:49.335 E V X=26:21:20 N 127:46:04 E DB 26:17:17 N 127:49.335 E,26:22:51 N 127:51.3861 E DP 26:22:51 N 127:51.3861 E DP 26:23:00 N 127:51:18 E AC E AN Naha TCA-3 AL 3000 FT AMSL AH 3999 FT AMSL DP 26:29:25 N 127:59:07 E DP 26:32:49 N 128:03:14 E DP 26:31:49 N 128:04:11 E DP 26:31:02 N 128:05:03 E V X=26:12:31 N 127:38:34 E DB 26:31:02 N 128:05:03 E,25:42:32 N 127:41:28 E DP 25:42:32 N 127:41:28 E V D=- V X=26:12:31 N 127:38:34 E DB 25:47:32 N 127:40:59 E,26:28.8746 N 127:59:47 E DP 26:28.8746 N 127:59:47 E DP 26:29:25 N 127:59:07 E AC E AN Naha TCA-4 AL 4000 FT AMSL AH 10000 FT AMSL V X=26:12:31 N 127:38:34 E DB 26:59:53 N 128:10:03 E,26:44:57 N 128:28.324 E DP 26:44:57 N 128:28.324 E DP 26:44.5183 N 128:28:31 E V X=26:12:31 N 127:38:34 E DB 26:29:37 N 128:16.3883 E,26:12:04 N 126:56:16 E DP 26:12:04 N 126:56:16 E DP 26:12:14 N 126:56:19 E DP 26:12:14 N 127:05:13 E DP 26:11.1359 N 127:5.09096 E DP 26:10:03 N 127:5.17191 E V D=- V X=26:12:31 N 127:38:34 E DB 26:10:03 N 127:5.17191 E,26:40:48 N 127:49:58 E V X=26:44:14 N 127:45.8867 E DB 26:40:48 N 127:49:58 E,26:46:13 N 127:51.0362 E DP 26:46:13 N 127:51.0362 E DP 26:46:18 N 127:50:59 E DP 26:48:49 N 127:57.2517 E DP 26:59:53 N 128:10:03 E AC E AN Niigata ACA-1 AL 700 FT AMSL AH 8000 FT AMSL V X=37:57:30 N 139:6.93848 E DB 38:26:52 N 139:14:32 E,37:54:26 N 139:44:42 E DP 37:54:26 N 139:44:42 E DP 37:51:18 N 139:28:19 E DP 37:41:17 N 139:38:49 E DP 37:41.0511 N 139:38:38 E DP 37:40:09 N 139:37:51 E V X=37:57:30 N 139:06:54 E DB 37:40:09 N 139:37:51 E,37:27:32 N 139:05:47 E DP 37:27:32 N 139:05:47 E DP 37:33:18 N 139:03:10 E V X=37:57:30 N 139:06:54 E DB 36:58:43 N 138:34:05 E,37:22:42 N 137:58.6025 E DP 37:22:42 N 137:58.6025 E DP 37:31:34 N 138:12:54 E DP 37:33:10 N 138:16:15 E DP 38:00:01 N 139:02:37 E DP 38:26:52 N 139:14:32 E AC E AN Niigata ACA-2 AL 700 FT AMSL AH FL140 DP 38:26:52 N 139:14:32 E DP 38:00:01 N 139:02:37 E DP 37:33:10 N 138:16:15 E DP 37:31:34 N 138:12:54 E DP 37:31:39 N 138:12.8385 E DP 37:32:52 N 138:11:56 E V X=37:57:30 N 139:06:54 E DB 37:32:52 N 138:11:56 E,38:38:20 N 138:30:13 E DP 38:38:20 N 138:30:13 E DP 38:33:43 N 138:34:21 E V X=37:57:30 N 139:06:54 E DB 38:22:43 N 138:46:16 E,38:27:05 N 139:13:10 E DP 38:27:05 N 139:13:10 E DP 38:26:52 N 139:14:32 E AC E AN Oita ACA AL 700 FT AMSL AH 9000 FT AMSL DP 33:44:08 N 132:06:44 E V X=33:13:13 N 131:42:12 E DB 33:31:15 N 132:02:54 E,33:23:05 N 132:09:40 E DP 33:23:05 N 132:09:40 E DP 33:22:49 N 132:09:45 E DP 33:23:35 N 132:14:31 E DP 33:22:36 N 132:15:02 E DP 33:21.5684 N 132:15.4193 E V X=33:13:13 N 131:42:12 E DB 33:21.5684 N 132:15.4193 E,32:51:35 N 131:19:10 E DP 32:51:35 N 131:19:10 E DP 32:52:48 N 131:20:04 E DP 33:07:12 N 131:10:52 E DP 33:18:44 N 131:36:43 E DP 33:38:15 N 131:38:33 E DP 33:49:25 N 131:54:25 E DP 33:48:45 N 131:55:19 E DP 33:48:09 N 131:56.274 E V D=- V X=34:08:27 N 132:13:57 E DB 33:48:09 N 131:56.274 E,33:44:08 N 132:06:44 E AC E AN Sakishima ACA-1 AL 700 FT AMSL AH FL160 DP 25:02:56 N 124:05:31 E DP 25:03:18 N 124:06:52 E DP 25:03:30 N 124:08:15 E V X=24:23:46 N 124:14:17 E DB 25:03:30 N 124:08:15 E,25:02:30 N 124:25:43 E DP 25:02:30 N 124:25:43 E DP 25:3.85166 N 124:26.1701 E DP 25:05:11 N 124:26.7074 E V X=24:47:10 N 125:18.0678 E DB 25:05:11 N 124:26.7074 E,25:09:48 N 124:28:58 E DP 25:09:48 N 124:28:58 E DP 25:03:00 N 124:43:43 E DP 25:04:07 N 124:44:11 E DP 25:05:09 N 124:44:50 E V X=24:47:10 N 125:18:04 E DB 25:05:09 N 124:44:50 E,25:22:00 N 125:22:47 E DP 25:22:00 N 125:22:47 E V X=24:47:10 N 125:18:04 E DB 25:36:57 N 125:24:48 E,24:10:48 N 125:56:01 E DP 24:10:48 N 125:56:01 E DP 24:10:24 N 125:55:21 E DP 24:21:26 N 125:44:10 E DP 24:20.5892 N 125:43.253 E DP 24:19:50 N 125:42.2532 E V X=24:47:10 N 125:18:04 E DB 24:19:50 N 125:42.2532 E,24:13:35 N 125:06:54 E DP 24:13:35 N 125:06:54 E V X=24:47:10 N 125:18:04 E DB 23:59:11 N 125:02:06 E,24:02:58 N 124:52.0884 E DP 24:02:58 N 124:52.0884 E DP 24:03:09 N 124:51:49 E DP 24:2.00345 N 124:51:13 E DP 24:0.952428 N 124:50.4413 E V X=24:23:46 N 124:14:17 E DB 24:0.952428 N 124:50.4413 E,23:45:50 N 124:0.00572644 E DP 23:45:50 N 124:0.00572644 E DP 24:01:15 N 124:05:28 E DP 25:02:56 N 124:05:31 E AC E AN Sakishima ACA-2 AL 700 FT AMSL AH 7000 FT AMSL DP 25:09:48 N 124:28:58 E V X=24:47:10 N 125:18:04 E DB 25:10:07 N 124:28:52 E,25:36:57 N 125:24:48 E DP 25:36:57 N 125:24:48 E V D=- V X=24:47:10 N 125:18:04 E DB 25:22:00 N 125:22:47 E,25:04:07 N 124:44:11 E DP 25:04:07 N 124:44:11 E DP 25:03:00 N 124:43:43 E DP 25:09:48 N 124:28:58 E AC E AN Sakishima ACA-3 AL 700 FT AMSL AH 7000 FT AMSL DP 24:10:24 N 125:55:21 E DP 24:9.44133 N 125:54.3519 E DP 24:08:32 N 125:53.1682 E V X=24:47:10 N 125:18:04 E DB 24:08:32 N 125:53.1682 E,23:59:11 N 125:02:06 E DP 23:59:11 N 125:02:06 E V D=- V X=24:47:10 N 125:18:04 E DB 24:13:35 N 125:06:54 E,24:20.5892 N 125:43.253 E DP 24:20.5892 N 125:43.253 E DP 24:21:26 N 125:44:10 E DP 24:10:24 N 125:55:21 E AC E AN Sapporo Okadama ACA-1 AL 700 FT AMSL AH 11000 FT AMSL V X=43:10:29 N 141:18:09 E DB 43:50:29 N 141:16:46 E,43:48.406 N 141:35.7356 E DP 43:48.406 N 141:35.7356 E DP 43:48:19 N 141:36:04 E DP 43:27:14 N 141:37:42 E DP 43:10:55 N 141:36:59 E DP 43:09:11 N 141:33:25 E DP 43:8.64155 N 141:33.6387 E DP 43:08:05 N 141:33:46 E V X=43:07:03 N 141:22:53 E DB 43:08:05 N 141:33:46 E,42:59:16 N 141:20:18 E DP 42:59:16 N 141:20:18 E DP 42:47:39 N 141:16:16 E DP 42:49:36 N 140:48:24 E DP 42:48:29 N 140:31:30 E DP 43:10:09 N 140:39:47 E DP 43:50:29 N 141:16:46 E AC E AN Sapporo Okadama ACA-2 AL 700 FT AMSL AH 8000 FT AMSL V X=43:10:29 N 141:18:09 E DB 43:48:19 N 141:36:04 E,43:37:13 N 141:59:07 E DP 43:37:13 N 141:59:07 E DP 43:36:24 N 141:59:58 E DP 43:22:00 N 141:59:58 E DP 43:10:55 N 141:36:59 E DP 43:27:14 N 141:37:42 E DP 43:48:19 N 141:36:04 E AC E AN Sapporo Okadam ACA-3 AL 700 FT AMSL AH 7000 FT AMSL V X=43:10:29 N 141:18:09 E DB 43:36:24 N 141:59:58 E,43:26.79 N 142:8.25444 E DP 43:26.79 N 142:8.25444 E DP 43:26:08 N 142:08:35 E DP 43:22:00 N 141:59:58 E DP 43:36:24 N 141:59:58 E AC E AN Sendai ACA AL 700 FT AMSL AH FL160 DP 37:55:55 N 141:49:37 E DP 37:47:15 N 141:40:05 E V X=38:08:23 N 140:55:01 E DB 37:18:49 N 141:03:52 E,37:19:07 N 140:43:51 E DP 37:19:07 N 140:43:51 E DP 37:19:27 N 140:42:07 E DP 37:19.4684 N 140:42:07 E DP 37:20.1354 N 140:41.6859 E DP 37:20:47 N 140:41:13 E V D=- V X=37:13:28 N 140:26:14 E DB 37:27:37 N 140:43:58 E,37:33:24 N 140:27:51 E DP 37:33:24 N 140:27:51 E V X=38:23:18 N 140:21.5243 E DB 38:09:11 N 140:27:51 E,38:19:23 N 140:39:55 E DP 38:19:23 N 140:39:55 E V X=38:14:08 N 140:55:23 E DB 38:16:12 N 140:49:32 E,38:13:02 N 140:49:08 E DP 38:13:02 N 140:49:08 E DP 38:12:36 N 140:49:17 E DP 38:12:16 N 141:01:20 E DP 37:55:55 N 141:49:37 E AC E AN Sendai TCA-1 AL 3000 FT AMSL AH 10000 FT AMSL DP 38:11:15 N 141:04:22 E V X=38:08:23 N 140:55:01 E DB 38:10:52 N 141:00:32 E,38:12.272 N 140:51.0223 E DP 38:12.272 N 140:51.0223 E DP 38:12:32 N 140:51:29 E DP 38:12:16 N 141:01:20 E DP 38:11:15 N 141:04:22 E AC E AN Sendai TCA-10 AL 5000 FT AMSL AH 10000 FT AMSL DP 37:50:46 N 141:04:30 E V X=38:08:23 N 140:55:01 E DB 37:40:41 N 141:09:42 E,37:38:28 N 140:58:11 E DP 37:38:28 N 140:58:11 E DP 37:38:26 N 140:56:48 E DP 37:18:24 N 140:54:34 E DP 37:18:25 N 140:53.3886 E DP 37:18:28 N 140:51:37 E V X=38:08:23 N 140:55:01 E DB 37:18:28 N 140:51:37 E,37:19:05 N 140:44:33 E DP 37:19:05 N 140:44:33 E DP 37:39:08 N 140:46:44 E DP 37:39:08 N 140:46.7178 E DP 37:39.3903 N 140:45.3741 E V X=38:08:23 N 140:55:01 E DB 37:39.3903 N 140:45.3741 E,37:45:20 N 140:30:43 E DP 37:45:20 N 140:30:43 E DP 37:53:01 N 140:38:48 E DP 37:52:30 N 140:39.6208 E DP 37:51.9711 N 140:40.5367 E V D=- V X=38:08:23 N 140:55:01 E DB 37:51.9711 N 140:40.5367 E,37:48:49 N 140:49:50 E DP 37:48:49 N 140:49:50 E DP 37:49:46 N 140:50:06 E DP 37:49:36 N 140:50.3915 E DP 37:49:27 N 140:51:29 E V X=38:08:23 N 140:55:01 E DB 37:49:27 N 140:51:29 E,37:50:46 N 141:04:30 E AC E AN Sendai TCA-2 AL 4000 FT AMSL AH 10000 FT AMSL V X=38:08:23 N 140:55:01 E DB 38:09:18 N 141:10:13 E,37:56:25 N 140:55:54 E DP 37:56:25 N 140:55:54 E DP 37:56:24 N 140:55:01 E DP 38:03:24 N 140:55:01 E DP 38:3.38803 N 140:55:14 E DP 38:3.42323 N 140:55:48 E V D=- V X=38:08:23 N 140:55:01 E DB 38:3.42323 N 140:55:48 E,38:10:52 N 141:00:32 E DP 38:10:52 N 141:00:32 E DP 38:11:15 N 141:04:22 E DP 38:09:18 N 141:10:13 E AC E AN Sendai TCA-3 AL 1500 FT AMSL AH 10000 FT AMSL DP 38:01:50 N 141:32:11 E DP 38:01:36 N 141:32:11 E DP 38:0.53489 N 141:31:50 E V X=38:08:23 N 140:55:01 E DB 38:0.53489 N 141:31:50 E,37:40:41 N 141:09:42 E DP 37:40:41 N 141:09:42 E V X=38:08:13 N 140:55:02 E DB 37:50:46 N 141:04:30 E,37:49:15 N 140:55:01 E DP 37:49:15 N 140:55:01 E DP 37:56:24 N 140:55:01 E DP 37:56:24 N 140:55:30 E DP 37:56:27 N 140:56:23 E V D=- V X=38:08:23 N 140:55:01 E DB 37:56:27 N 140:56:23 E,38:09:18 N 141:10:13 E DP 38:09:18 N 141:10:13 E DP 38:01:50 N 141:32:11 E AC E AN Sendai TCA-4 AL 2000 FT AMSL AH 10000 FT AMSL DP 37:44:34 N 141:18:11 E DP 37:35:19 N 141:24:41 E DP 37:29:31 N 141:17:26 E DP 37:40:37 N 141:09:21 E DP 37:40:44 N 141:9.82062 E DP 37:41.1749 N 141:11.0863 E V D=- V X=38:08:23 N 140:55:01 E DB 37:41.1749 N 141:11.0863 E,37:44:34 N 141:18:11 E AC E AN Sendai TCA-5 AL 2500 FT AMSL AH 10000 FT AMSL V D=- V X=38:08:23 N 140:55:01 E DB 38:12:32 N 140:51:29 E,38:03:25 N 140:54:27 E DP 38:03:25 N 140:54:27 E DP 38:03:24 N 140:55:01 E DP 37:55:06 N 140:55:01 E DP 37:55.1031 N 140:54.3854 E DP 37:55:09 N 140:53:28 E V D=+ V X=38:08:23 N 140:55:01 E DB 37:55:09 N 140:53:28 E,38:01:28 N 140:40:36 E DP 38:01:28 N 140:40:36 E DP 38:07:20 N 140:40:36 E DP 38:07:54 N 140:40:33 E DP 38:8.57476 N 140:40:32 E V X=38:08:23 N 140:55:01 E DB 38:8.57476 N 140:40:32 E,38:17:21 N 140:46:04 E DP 38:17:21 N 140:46:04 E V D=- V X=38:14:08 N 140:55:23 E DB 38:16:12 N 140:49:32 E,38:13:02 N 140:49:08 E DP 38:13:02 N 140:49:08 E DP 38:12:36 N 140:49:17 E DP 38:12:32 N 140:51:29 E AC E AN Sendai TCA-7 AL 4500 FT AMSL AH 10000 FT AMSL V D=- V X=38:8.39152 N 140:54:59 E DB 38:17:21 N 140:46:04 E,38:10:18 N 140:40:44 E DP 38:10:18 N 140:40:44 E V D=+ V X=38:08:23 N 140:55:01 E DB 38:10:54 N 140:36:13 E,38:18:20 N 140:40:44 E DP 38:18:20 N 140:40:44 E DP 38:18:53 N 140:41:25 E DP 38:17:21 N 140:46:04 E AC E AN Sendai TCA-8 AL 4000 FT AMSL AH 10000 FT AMSL V D=- V X=38:08:23 N 140:55:01 E DB 38:10:18 N 140:40:44 E,38:8.00626 N 140:40.5386 E DP 38:8.00626 N 140:40.5386 E DP 38:07:20 N 140:40:36 E V X=38:8.32224 N 140:55:01 E DB 37:59:12 N 140:36:52 E,37:51:24 N 140:55:01 E DP 37:51:24 N 140:55:01 E DP 37:49:15 N 140:55:01 E DP 37:49.2531 N 140:54:28 E DP 37:49:18 N 140:53.3548 E DP 37:49.3725 N 140:52.2523 E DP 37:49.4916 N 140:51.1555 E DP 37:49:39 N 140:50:04 E V D=+ V X=38:08:23 N 140:55:01 E DB 37:48:49 N 140:49:50 E,38:0.290607 N 140:31:48 E DP 38:0.290607 N 140:31:48 E DP 38:01:07 N 140:31:22 E DP 38:05:27 N 140:34:31 E V X=38:8.37095 N 140:54:53 E DB 38:05:42 N 140:36:16 E,38:10:54 N 140:36:13 E DP 38:10:54 N 140:36:13 E DP 38:10:18 N 140:40:44 E AC E AN Sendai TCA-9 AL 4000 FT AMSL AH 10000 FT AMSL DP 38:05:27 N 140:34:31 E V D=- V X=38:08:22 N 140:54:57 E DB 38:01:07 N 140:31:22 E,37:53:01 N 140:38:48 E DP 37:53:01 N 140:38:48 E DP 37:45:20 N 140:30:43 E DP 37:46.0353 N 140:29:41 E DP 37:46:47 N 140:28:40 E DP 37:47:33 N 140:27:41 E DP 38:04:26 N 140:27:28 E DP 38:05:27 N 140:34:31 E AC E AN Tokushima ACA-1 AL 700 FT AMSL AH 5000 FT AMSL DP 34:13:00 N 134:28:35 E V X=34:07:47 N 134:36.5375 E DB 34:13:00 N 134:38:38 E,34:05:27 N 134:42:32 E DP 34:05:27 N 134:42:32 E DP 33:58:37 N 134:38:56 E DP 33:58:01 N 134:19:00 E DP 34:11:36 N 134:19:00 E DP 34:13:00 N 134:19:32 E DP 34:13:00 N 134:28:35 E AC E AN Tokushima ACA-2 AL 700 FT AMSL AH 3000 FT AMSL DP 34:13:00 N 134:38:38 E DP 34:13:00 N 134:50:28 E DP 33:55:51 N 135:09:41 E DP 33:46:36 N 135:05:00 E DP 33:43:23 N 135:05:00 E DP 33:58:37 N 134:38:56 E V D=- V X=34:07:47 N 134:36.5377 E DB 34:05:27 N 134:42:32 E,34:13:00 N 134:38:38 E AC E AN Tokushima ACA-3 AL 700 FT AMSL AH 6000 FT AMSL DP 33:58:01 N 134:19:00 E DP 33:58:37 N 134:38:56 E DP 33:43:23 N 135:05:00 E DP 33:35:00 N 135:05:00 E DP 33:37:02 N 134:19:00 E DP 33:58:01 N 134:19:00 E AC E AN Tokyo ACA-1 AL GND AH 8000 FT AMSL V X=35:46:56 N 140:21:45 E DB 35:56:00 N 141:09:47 E,35:40:32 N 141:10.3521 E DP 35:40:32 N 141:10.3521 E DP 35:39:17 N 141:10:04 E DP 35:40:07 N 141:05:17 E DP 35:39:21 N 141:5.08644 E DP 35:38:11 N 141:04:44 E DP 35:42:38 N 140:54:07 E DP 35:56:00 N 140:35:35 E DP 35:56:00 N 141:09:47 E AC E AN Tokyo ACA-10 AL 2500 FT AMSL AH FL150 DP 35:56:00 N 140:35:35 E DP 35:56:00 N 140:31:54 E DP 35:56:26 N 140:30:02 E DP 35:57:32 N 140:29:39 E DP 35:56:00 N 140:35:35 E AC E AN Tokyo ACA-11 AL 7000 FT AMSL AH FL150 DP 36:16:19 N 140:26:19 E DP 36:08:58 N 140:26:26 E DP 36:12:04 N 140:18:53 E DP 36:13:21 N 140:09:30 E DP 36:16:59 N 140:10:15 E DP 36:16:19 N 140:26:19 E AC E AN Tokyo ACA-12 AL 4000 FT AMSL AH FL150 DP 36:10:53 N 140:21:47 E DP 36:06:02 N 140:20:56 E DP 36:07:05 N 140:15:14 E DP 36:07:05 N 140:11:34 E V D=- V X=36:02:05 N 140:11:34 E DB 36:7.08748 N 140:11:34 E,36:06:23 N 140:08:24 E DP 36:06:23 N 140:08:24 E DP 36:13:21 N 140:09:30 E DP 36:12:04 N 140:18:53 E DP 36:10:53 N 140:21:47 E AC E AN Tokyo ACA-13 AL 3000 FT AMSL AH FL150 DP 36:04:53 N 140:27:03 E DP 35:57:32 N 140:29:39 E V D=- V X=36:02:06 N 140:11.569 E DB 36:00:23 N 140:17:23 E,36:07:05 N 140:11:34 E DP 36:07:05 N 140:11:34 E DP 36:07:05 N 140:15:14 E DP 36:04:53 N 140:27:03 E AC E AN Tokyo ACA-14 AL 1800 FT AMSL AH FL150 DP 35:57:32 N 140:29:39 E DP 35:56:26 N 140:30:02 E DP 35:59:30 N 140:16:51 E DP 35:59.5739 N 140:16:55 E DP 35:59.9702 N 140:17.1723 E DP 36:00:23 N 140:17:23 E DP 35:57:32 N 140:29:39 E AC E AN Tokyo ACA-15 AL 10000 FT AMSL AH FL150 DP 36:16:59 N 140:10:15 E DP 36:13:21 N 140:09:30 E V X=36:02:05 N 140:11:34 E DB 36:06:23 N 140:08:24 E,35:59.8871 N 140:17:08 E DP 35:59.8871 N 140:17:08 E DP 35:59:30 N 140:16:51 E DP 35:56:00 N 140:31:54 E DP 35:56:00 N 140:35:35 E DP 35:42:38 N 140:54:07 E V X=35:46:56 N 140:21:45 E DB 35:38:11 N 141:04:44 E,35:12:05 N 140:32:45 E DP 35:12:05 N 140:32:45 E DP 35:11:49 N 140:31:19 E DP 35:09:27 N 140:32:47 E DP 35:01:28 N 139:38:51 E DP 35:11:36 N 139:43:10 E DP 35:33:25 N 139:38:40 E DP 35:53:39 N 139:41:46 E V D=- V X=36:29:03 N 139:51:59 E DB 36:14:15 N 139:51:23 E,36:16.7845 N 140:2.28843 E DP 36:16.7845 N 140:2.28843 E DP 36:17:17 N 140:03:01 E DP 36:16:59 N 140:10:15 E AC E AN Tokyo ACA-2 AL 4000 FT AMSL AH 8000 FT AMSL DP 35:40:07 N 141:05:17 E DP 35:39:17 N 141:10:04 E DP 35:38:03 N 141:09:45 E DP 35:36.8193 N 141:9.37439 E DP 35:36:18 N 141:09:12 E DP 35:38:11 N 141:04:44 E DP 35:39:21 N 141:5.08644 E DP 35:40:07 N 141:05:17 E AC E AN Tokyo ACA-3 AL 4000 FT AMSL AH FL150 DP 35:38:11 N 141:04:44 E V X=35:46:56 N 140:21:45 E DB 35:36:18 N 141:09:12 E,35:8.00518 N 140:32:55 E DP 35:8.00518 N 140:32:55 E DP 35:07:55 N 140:32:25 E DP 35:09:27 N 140:32:47 E DP 35:11:49 N 140:31:19 E DP 35:12:05 N 140:32:45 E DP 35:12:24 N 140:34:10 E V D=- V X=35:46:56 N 140:21:45 E DB 35:12:24 N 140:34:10 E,35:38:11 N 141:04:44 E AC E AN Tokyo ACA-4 AL 700 FT AMSL AH 10000 FT AMSL DP 35:09:27 N 140:32:47 E DP 34:54:50 N 140:29:19 E DP 34:52:21 N 140:01:53 E V X=34:59.1851 N 139:49:50 E DB 34:50:16 N 139:40:14 E,34:55:09 N 139:36:10 E DP 34:55:09 N 139:36:10 E DP 35:01:28 N 139:38:51 E DP 35:09:27 N 140:32:47 E AC E AN Tokyo ACA-5 AL 6000 FT AMSL AH 8000 FT AMSL DP 35:56:00 N 141:03:08 E DP 35:56:00 N 140:47:46 E DP 36:02:50 N 140:38:03 E DP 36:04:20 N 140:30:00 E DP 36:08:11 N 140:28:18 E DP 36:05:00 N 140:36:00 E DP 36:05:00 N 140:43:47 E DP 36:00:12 N 140:45:54 E DP 36:00:11 N 140:52:41 E DP 35:56:00 N 141:03:08 E AC E AN Tokyo ACA-6 AL 5000 FT AMSL AH 8000 FT AMSL DP 35:56:00 N 140:47:46 E DP 35:56:00 N 140:38:28 E DP 36:04:07 N 140:31:12 E DP 36:02:50 N 140:38:03 E DP 35:56:00 N 140:47:46 E AC E AN Tokyo ACA-7 AL 4000 FT AMSL AH 8000 FT AMSL DP 35:56:00 N 140:38:28 E DP 35:56:00 N 140:35:35 E DP 35:58:00 N 140:32:48 E DP 36:04:20 N 140:30:00 E DP 36:04:07 N 140:31:12 E DP 35:56:00 N 140:38:28 E AC E AN Tokyo ACA-8 AL 6000 FT AMSL AH FL150 DP 36:08:11 N 140:28:18 E DP 36:04:20 N 140:30:00 E DP 36:06:02 N 140:20:56 E DP 36:10:53 N 140:21:47 E DP 36:08:11 N 140:28:18 E AC E AN Tokyo ACA-9 AL 4000 FT AMSL AH FL150 DP 36:04:20 N 140:30:00 E DP 35:58:00 N 140:32:48 E DP 35:56:00 N 140:35:35 E DP 35:57:32 N 140:29:39 E DP 36:04:53 N 140:27:03 E DP 36:04:20 N 140:30:00 E AC E AN Tokyo TCA-1 AL 2000 FT AMSL AH 8000 FT AMSL V X=35:46.9203 N 140:21:52 E DB 35:56:00 N 140:57:00 E,35:41:02 N 140:57:57 E DP 35:41:02 N 140:57:57 E DP 35:42:38 N 140:54:07 E V D=- V X=35:46:56 N 140:21:45 E DB 35:43:56 N 140:52:19 E,35:55:04 N 140:50:54 E DP 35:55:04 N 140:50:54 E DP 35:56:00 N 140:50:28 E DP 35:56:00 N 140:57:00 E AC E AN Tokyo TCA-10 AL 1800 FT AMSL AH 10000 FT AMSL DP 35:57:32 N 140:29:39 E DP 35:56:26 N 140:30:02 E DP 35:57:41 N 140:24:40 E DP 35:58:54 N 140:23:47 E DP 35:57:32 N 140:29:39 E AC E AN Tokyo TCA-11 AL 1800 FT AMSL AH 10000 FT AMSL DP 35:56:00 N 140:35:35 E V X=35:46:56 N 140:21:45 E DB 35:43:56 N 140:52:19 E,35:35.2512 N 140:48:57 E DP 35:35.2512 N 140:48:57 E DP 35:34:23 N 140:48:20 E DP 35:41:55 N 140:32:24 E DP 35:41:32 N 140:32:07 E DP 35:41:01 N 140:31.6679 E DP 35:40:31 N 140:31:11 E DP 35:43:52 N 140:28:45 E DP 35:43.9862 N 140:28.8208 E DP 35:44.4059 N 140:29:01 E V D=- V X=35:45:55 N 140:23:08 E DB 35:44.4059 N 140:29:01 E,35:50:54 N 140:23:41 E DP 35:50:54 N 140:23:41 E DP 35:52:38 N 140:22:25 E DP 35:57:41 N 140:24:40 E DP 35:56:00 N 140:31:54 E DP 35:56:00 N 140:35:35 E AC E AN Tokyo TCA-12 AL 2000 FT AMSL AH 10000 FT AMSL V X=35:46:56 N 140:21:45 E DB 35:36:50 N 140:43:08 E,35:32:09 N 140:38.488 E DP 35:32:09 N 140:38.488 E DP 35:31:34 N 140:37:39 E DP 35:40:31 N 140:31:11 E DP 35:40:52 N 140:31.5347 E DP 35:41:23 N 140:31.9877 E DP 35:41:55 N 140:32:24 E DP 35:36:50 N 140:43:08 E AC E AN Tokyo TCA-13 AL 6000 FT AMSL AH 10000 FT AMSL DP 36:02:26 N 140:21:13 E DP 35:58:54 N 140:23:47 E V D=- V X=36:02:05 N 140:11:34 E DB 36:00:23 N 140:17:23 E,36:02:51 N 140:17:41 E DP 36:02:51 N 140:17:41 E DP 36:03:17 N 140:17:34 E DP 36:02:26 N 140:21:13 E AC E AN Tokyo TCA-14A AL 1800 FT AMSL AH 3000 FT AMSL DP 35:58:54 N 140:23:47 E DP 35:57:41 N 140:24:40 E DP 35:58:37 N 140:20:38 E DP 35:59:50 N 140:19:45 E DP 35:58:54 N 140:23:47 E AC E AN Tokyo TCA-14B AL 6000 FT AMSL AH 10000 FT AMSL DP 35:58:54 N 140:23:47 E DP 35:57:41 N 140:24:40 E DP 35:58:37 N 140:20:38 E DP 35:59:50 N 140:19:45 E DP 35:58:54 N 140:23:47 E AC E AN Tokyo TCA-15A AL 1800 FT AMSL AH 3000 FT AMSL DP 35:57:41 N 140:24:40 E DP 35:52:38 N 140:22:25 E DP 35:57:43 N 140:18:43 E DP 35:58:37 N 140:20:38 E DP 35:57:41 N 140:24:40 E AC E AN Tokyo TCA-15B AL 6000 FT AMSL AH 10000 FT AMSL DP 35:57:41 N 140:24:40 E DP 35:52:38 N 140:22:25 E DP 35:57:43 N 140:18:43 E DP 35:58:37 N 140:20:38 E DP 35:57:41 N 140:24:40 E AC E AN Tokyo TCA-16 AL 6000 FT AMSL AH 10000 FT AMSL DP 36:03:17 N 140:17:34 E DP 36:3.25172 N 140:17:35 E DP 36:02:49 N 140:17.6852 E V X=36:02:05 N 140:11:34 E DB 36:02:49 N 140:17.6852 E,35:57:05 N 140:11:41 E DP 35:57:05 N 140:11:41 E DP 36:01:17 N 140:08:38 E DP 36:03:15 N 140:12:47 E DP 36:03:17 N 140:17:34 E AC E AN Tokyo TCA-17A AL 1800 FT AMSL AH 3000 FT AMSL DP 35:55:04 N 140:13:08 E V D=- V X=36:2.07064 N 140:11.5688 E DB 35:57:05 N 140:11:41 E,36:00:23 N 140:17:23 E DP 36:00:23 N 140:17:23 E DP 35:59:50 N 140:19:45 E DP 35:58:37 N 140:20:38 E DP 35:55:04 N 140:13:08 E AC E AN Tokyo TCA-17B AL 6000 FT AMSL AH 10000 FT AMSL DP 35:55:04 N 140:13:08 E V D=- V X=36:2.07064 N 140:11.5688 E DB 35:57:05 N 140:11:41 E,36:00:23 N 140:17:23 E DP 36:00:23 N 140:17:23 E DP 35:59:50 N 140:19:45 E DP 35:58:37 N 140:20:38 E DP 35:55:04 N 140:13:08 E AC E AN Tokyo TCA-18 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:57:43 N 140:18:43 E DP 35:52:38 N 140:22:25 E DP 35:49:57 N 140:16:47 E DP 35:55:04 N 140:13:08 E DP 35:57:43 N 140:18:43 E AC E AN Tokyo TCA-19 AL 3000 FT AMSL AH 10000 FT AMSL DP 35:48:26 N 140:17:49 E DP 35:49:57 N 140:16:47 E DP 35:52:38 N 140:22:25 E V X=35:45:55 N 140:23:08 E DB 35:50:54 N 140:23:41 E,35:48:03 N 140:17:33 E DP 35:48:03 N 140:17:33 E DP 35:48:26 N 140:17:49 E AC E AN Tokyo TCA-2 AL 2000 FT AMSL AH 10000 FT AMSL DP 35:41:02 N 140:57:57 E V X=35:46:56 N 140:21:45 E DB 35:41:02 N 140:57:58 E,35:31:52 N 140:53:39 E DP 35:31:52 N 140:53:39 E DP 35:34:23 N 140:48:20 E DP 35:34.5182 N 140:48:27 E DP 35:35:24 N 140:49.0347 E V D=- V X=35:46:56 N 140:21:45 E DB 35:35:24 N 140:49.0347 E,35:43:56 N 140:52:19 E DP 35:43:56 N 140:52:19 E DP 35:42:38 N 140:54:07 E DP 35:41:02 N 140:57:57 E AC E AN Tokyo TCA-20 AL 4000 FT AMSL AH 10000 FT AMSL V D=- V X=35:45:55 N 140:23:08 E DB 35:40:55 N 140:23:15 E,35:43:37 N 140:28:36 E DP 35:43:37 N 140:28:36 E DP 35:43:52 N 140:28:45 E DP 35:40:08 N 140:31:28 E DP 35:37:24 N 140:25:45 E DP 35:40:55 N 140:23:15 E AC E AN Tokyo TCA-21 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:37:24 N 140:25:45 E DP 35:40:08 N 140:31:28 E DP 35:37:51 N 140:33:08 E DP 35:35:07 N 140:27:23 E DP 35:37:24 N 140:25:45 E AC E AN Tokyo TCA-22 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:37:51 N 140:33:08 E DP 35:31:34 N 140:37:39 E DP 35:31.5215 N 140:37.6066 E DP 35:30:58 N 140:36:45 E V X=35:46:56 N 140:21:45 E DB 35:30:58 N 140:36:45 E,35:28:40 N 140:32:02 E DP 35:28:40 N 140:32:02 E DP 35:28:49 N 140:31:55 E DP 35:35:07 N 140:27:23 E DP 35:37:51 N 140:33:08 E AC E AN Tokyo TCA-23 AL 3000 FT AMSL AH 10000 FT AMSL DP 36:03:17 N 140:17:34 E DP 36:03:15 N 140:12:47 E DP 36:01:17 N 140:08:38 E V X=36:2.08608 N 140:11:35 E DB 35:57:05 N 140:11:41 E,36:03:17 N 140:17:34 E AC E AN Tokyo TCA-24 AL 2000 FT AMSL AH 10000 FT AMSL DP 35:57:05 N 140:11:41 E DP 35:49:10 N 140:17:18 E DP 35:48:40 N 140:16:51 E DP 35:35:10 N 140:16:51 E DP 35:58:06 N 140:07:51 E DP 35:57.9749 N 140:08:03 E DP 35:57.7368 N 140:08:31 E V D=- V X=36:02:05 N 140:11:34 E DB 35:57.7368 N 140:08:31 E,35:57:05 N 140:11:41 E AC E AN Tokyo TCA-25 AL 1800 FT AMSL AH 10000 FT AMSL DP 35:28:40 N 140:32:02 E DP 35:28.3699 N 140:31:12 E DP 35:28:03 N 140:30:10 E DP 35:23:27 N 140:32:13 E DP 35:23:25 N 140:32.1043 E DP 35:23:06 N 140:30:57 E V X=35:46:56 N 140:21:45 E DB 35:23:06 N 140:30:57 E,35:22:05 N 140:24:57 E DP 35:22:05 N 140:24:57 E DP 35:35:10 N 140:16:51 E DP 35:48:40 N 140:16:51 E DP 35:49:10 N 140:17:18 E DP 35:48:26 N 140:17:49 E DP 35:48:10 N 140:17:38 E DP 35:47.7569 N 140:17.4015 E V D=- V X=35:45:55 N 140:23:08 E DB 35:47.7569 N 140:17.4015 E,35:40:55 N 140:23:15 E DP 35:40:55 N 140:23:15 E DP 35:28:40 N 140:32:02 E AC E AN Tokyo TCA-26 AL 3000 FT AMSL AH 10000 FT AMSL DP 35:17:22 N 140:27:53 E DP 35:17:19 N 140:27.5081 E DP 35:17:10 N 140:26:11 E V X=35:46:56 N 140:21:45 E DB 35:17:10 N 140:26:11 E,35:17:13 N 140:16:49 E V D=- V X=35:33:44 N 139:45:40 E DB 35:17:13 N 140:16:49 E,35:25:55 N 140:21.6025 E DP 35:25:55 N 140:21.6025 E DP 35:26:59 N 140:21:55 E DP 35:17:22 N 140:27:53 E AC E AN Tokyo TCA-27 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:58:06 N 140:07:51 E DP 35:49:07 N 140:11:22 E DP 35:46:40 N 140:00:57 E DP 35:48:57 N 139:56:29 E DP 35:44:49 N 139:52:55 E DP 35:41:48 N 139:39:57 E DP 35:53:39 N 139:41:46 E DP 36:04:00 N 139:46:31 E DP 36:3.98433 N 139:47.6575 E DP 36:3.90543 N 139:49:01 E V X=35:33:44 N 139:45:40 E DB 36:3.90543 N 139:49:01 E,35:58:06 N 140:07:51 E AC E AN Tokyo TCA-28 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:42:19 N 140:09:31 E DP 35:32:18 N 140:09:31 E DP 35:32:15 N 139:58:22 E DP 35:37:01 N 139:58:21 E DP 35:39:49 N 139:54:50 E DP 35:42:09 N 139:50:37 E DP 35:43:37 N 139:51:53 E DP 35:48:57 N 139:56:29 E DP 35:42:19 N 140:09:31 E AC E AN Tokyo TCA-29 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:42:09 N 139:50:37 E DP 35:39:49 N 139:54:50 E DP 35:37:01 N 139:58:21 E DP 35:32:15 N 139:58:22 E DP 35:32:15 N 139:56:06 E DP 35:35:09 N 139:56:05 E DP 35:37:58 N 139:52:35 E DP 35:40:02 N 139:48:46 E DP 35:42:09 N 139:50:37 E AC E AN Tokyo TCA-3 AL 3000 FT AMSL AH 10000 FT AMSL DP 35:31:52 N 140:53:39 E DP 35:31.7889 N 140:53:36 E DP 35:30.8558 N 140:52:54 E V X=35:46:56 N 140:21:45 E DB 35:30.8558 N 140:52:54 E,35:17:22 N 140:27:53 E DP 35:17:22 N 140:27:53 E V D=- V X=35:46:56 N 140:21:45 E DB 35:22:05 N 140:24:57 E,35:23.1219 N 140:31:04 E DP 35:23.1219 N 140:31:04 E DP 35:23:27 N 140:32:13 E DP 35:28:03 N 140:30:10 E DP 35:28:15 N 140:30.8238 E DP 35:28:36 N 140:31.8384 E V X=35:46:56 N 140:21:45 E DB 35:28:36 N 140:31.8384 E,35:36:50 N 140:43:08 E DP 35:36:50 N 140:43:08 E DP 35:31:52 N 140:53:39 E AC E AN Tokyo TCA-30 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:40:02 N 139:48:46 E DP 35:37:58 N 139:52:35 E DP 35:35:09 N 139:56:05 E DP 35:32:15 N 139:56:06 E DP 35:32:13 N 139:52:53 E DP 35:32:04 N 139:52:51 E DP 35:31.6363 N 139:52.702 E DP 35:31.2186 N 139:52.5068 E DP 35:30:49 N 139:52:16 E DP 35:28:25 N 139:53:58 E DP 35:25:57 N 139:48:45 E V X=35:33:12 N 139:46:52 E DB 35:28:12 N 139:47:09 E,35:38.2017 N 139:46:38 E DP 35:38.2017 N 139:46:38 E DP 35:38:11 N 139:47:11 E DP 35:40:02 N 139:48:46 E AC E AN Tokyo TCA-31 AL 5000 FT AMSL AH 10000 FT AMSL DP 35:28:25 N 139:53:58 E DP 35:26:15 N 139:55:31 E DP 35:23:47 N 139:50:18 E DP 35:25:57 N 139:48:45 E DP 35:28:25 N 139:53:58 E AC E AN Tokyo TCA-32 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:26:15 N 139:55:31 E DP 35:19:04 N 140:00:36 E DP 35:16:36 N 139:55:22 E DP 35:23:47 N 139:50:18 E DP 35:26:15 N 139:55:31 E AC E AN Tokyo TCA-33 AL 2500 FT AMSL AH 10000 FT AMSL DP 35:44:49 N 139:52:55 E V D=- V X=35:33:12 N 139:46:52 E DB 35:38:11 N 139:47:11 E,35:30:10 N 139:42:00 E DP 35:30:10 N 139:42:00 E DP 35:28:01 N 139:39:47 E DP 35:33:25 N 139:38:40 E DP 35:41:48 N 139:39:57 E DP 35:44:49 N 139:52:55 E AC E AN Tokyo TCA-34 AL 2500 FT AMSL AH 10000 FT AMSL DP 35:26:59 N 140:21:55 E DP 35:26.1068 N 140:21.6543 E DP 35:25:03 N 140:21.2867 E V X=35:33:44 N 139:45:40 E DB 35:25:03 N 140:21.2867 E,35:06:25 N 140:01:40 E DP 35:06:25 N 140:01:40 E DP 35:06:45 N 140:01:22 E DP 35:7.27479 N 140:0.818367 E DP 35:07:47 N 140:0.234786 E DP 35:08:15 N 139:59:37 E DP 35:06:27 N 139:40:58 E DP 35:11:36 N 139:43:10 E DP 35:28:01 N 139:39:47 E DP 35:30:10 N 139:42:00 E DP 35:29.8861 N 139:42.2575 E DP 35:29:34 N 139:42.6393 E V D=- V X=35:33:12 N 139:46:52 E DB 35:29:34 N 139:42.6393 E,35:28:12 N 139:47:09 E DP 35:28:12 N 139:47:09 E DP 35:16:36 N 139:55:22 E DP 35:19:04 N 140:00:36 E V X=35:33:44 N 139:45:40 E DB 35:22:39 N 139:58:04 E,35:31:31 N 140:3.8916 E DP 35:31:31 N 140:3.8916 E DP 35:32:17 N 140:04:00 E DP 35:32:18 N 140:09:31 E DP 35:42:19 N 140:09:31 E DP 35:46:40 N 140:00:57 E DP 35:49:07 N 140:11:22 E DP 35:35:10 N 140:16:51 E DP 35:26:59 N 140:21:55 E AC E AN Tokyo TCA-35 AL 2000 FT AMSL AH 10000 FT AMSL DP 35:32:17 N 140:04:00 E DP 35:32:06 N 140:3.98529 E DP 35:31:20 N 140:3.85555 E V X=35:33:44 N 139:45:40 E DB 35:31:20 N 140:3.85555 E,35:22:39 N 139:58:04 E DP 35:22:39 N 139:58:04 E DP 35:30:49 N 139:52:16 E DP 35:30.9517 N 139:52.3535 E DP 35:31:22 N 139:52:35 E DP 35:31:47 N 139:52.758 E DP 35:32:13 N 139:52:53 E DP 35:32:17 N 140:04:00 E AC E AN Tokyo TCA-36 AL 4000 FT AMSL AH 10000 FT AMSL DP 35:08:15 N 139:59:37 E DP 35:7.97223 N 139:59.988 E DP 35:07:29 N 140:0.585842 E DP 35:06:58 N 140:01:09 E DP 35:06:25 N 140:01:40 E DP 35:03:50 N 139:39:51 E DP 35:06:27 N 139:40:58 E DP 35:08:15 N 139:59:37 E AC E AN Tokyo TCA-6 AL 1800 FT AMSL AH 8000 FT AMSL DP 35:56:00 N 140:50:28 E DP 35:55:44 N 140:50.6039 E DP 35:54.7867 N 140:51:01 E V X=35:46:56 N 140:21:45 E DB 35:54.7867 N 140:51:01 E,35:43:56 N 140:52:19 E DP 35:43:56 N 140:52:19 E DP 35:56:00 N 140:35:35 E DP 35:56:00 N 140:50:28 E AC E AN Tokyo TCA-7 AL 4000 FT AMSL AH 10000 FT AMSL DP 36:04:20 N 140:30:00 E DP 35:58:00 N 140:32:48 E DP 35:56:00 N 140:35:35 E DP 35:57:32 N 140:29:39 E DP 36:04:53 N 140:27:03 E DP 36:04:20 N 140:30:00 E AC E AN Tokyo TCA-8 AL 2500 FT AMSL AH 10000 FT AMSL DP 35:56:00 N 140:35:35 E DP 35:56:00 N 140:31:54 E DP 35:56:26 N 140:30:02 E DP 35:57:32 N 140:29:39 E DP 35:56:00 N 140:35:35 E AC E AN Tokyo TCA-9 AL 3000 FT AMSL AH 10000 FT AMSL DP 36:04:53 N 140:27:03 E DP 35:57:32 N 140:29:39 E DP 35:58:54 N 140:23:47 E DP 36:02:26 N 140:21:13 E V D=- V X=36:02:06 N 140:11:36 E DB 36:03:17 N 140:17:34 E,36:07:05 N 140:11:34 E DP 36:07:05 N 140:11:34 E DP 36:07:05 N 140:15:14 E DP 36:04:53 N 140:27:03 E AC E AN Tsuiki ACA-1 AL 700 FT AMSL AH 10000 FT AMSL DP 34:09:17 N 130:55:36 E DP 34:10:34 N 131:02:12 E DP 33:59:05 N 130:55:38 E DP 34:01:33 N 130:54:04 E DP 34:09:17 N 130:55:36 E AC E AN Tsuiki ACA-10 AL 10000 FT AMSL AH FL160 DP 33:49:25 N 131:54:25 E DP 33:31:12 N 131:37:54 E DP 33:38:20 N 131:38:35 E DP 33:49:25 N 131:54:25 E AC E AN Tsuiki ACA-11 AL FL150 AH FL160 DP 33:49:25 N 131:54:25 E DP 33:48:53 N 131:55:11 E DP 33:23:12 N 131:39:37 E DP 33:24:21 N 131:37:16 E DP 33:31:12 N 131:37:54 E DP 33:49:25 N 131:54:25 E AC E AN Tsuiki ACA-2 AL 700 FT AMSL AH 8000 FT AMSL DP 33:59:05 N 130:55:38 E DP 33:53:27 N 130:53:56 E DP 33:52:47 N 130:51:40 E DP 33:43:51 N 130:54:45 E DP 33:42:28 N 130:48:58 E DP 33:51:11 N 130:45:58 E DP 33:51:35 N 130:47:20 E DP 33:52:17 N 130:47:22 E DP 33:52:58 N 130:47:27 E V X=33:51:24 N 131:01:46 E DB 33:52:58 N 130:47:27 E,34:01:33 N 130:54:04 E DP 34:01:33 N 130:54:04 E DP 33:59:05 N 130:55:38 E AC E AN Tsuiki ACA-3 AL 700 FT AMSL AH 12000 FT AMSL DP 34:10:34 N 131:02:12 E DP 34:11:58 N 131:09:26 E DP 33:48:29 N 131:14:25 E DP 33:44:58 N 130:59:45 E DP 33:43:51 N 130:54:45 E DP 33:52:47 N 130:51:40 E DP 33:53:27 N 130:53:56 E DP 33:59:05 N 130:55:38 E DP 34:10:34 N 131:02:12 E AC E AN Tsuiki ACA-4 AL 700 FT AMSL AH 6000 FT AMSL DP 33:42:28 N 130:48:58 E DP 33:43:51 N 130:54:45 E DP 33:44:58 N 130:59:45 E DP 33:34:37 N 130:51:45 E DP 33:36:11 N 130:44:24 E DP 33:40:47 N 130:41:49 E DP 33:42:28 N 130:48:58 E AC E AN Tsuiki ACA-5 AL 12000 FT AMSL AH FL160 DP 33:42:28 N 130:48:58 E DP 33:43:51 N 130:54:45 E DP 33:44:58 N 130:59:45 E DP 33:34:37 N 130:51:45 E DP 33:29:44 N 130:48:00 E DP 33:36:11 N 130:44:24 E DP 33:40:47 N 130:41:49 E DP 33:42:28 N 130:48:58 E AC E AN Tsuiki ACA-6 AL 700 FT AMSL AH 9000 FT AMSL DP 33:23:53 N 130:51:16 E DP 33:27:04 N 131:04:06 E DP 33:05:51 N 131:06:45 E DP 33:05:33 N 131:01:28 E DP 33:23:53 N 130:51:16 E AC E AN Tsuiki ACA-7 AL 700 FT AMSL AH 13000 FT AMSL DP 33:27:04 N 131:04:06 E DP 33:28:56 N 131:11:43 E DP 33:08:42 N 131:14:15 E DP 33:05:55 N 131:07:57 E DP 33:05:51 N 131:06:45 E DP 33:27:04 N 131:04:06 E AC E AN Tsuiki ACA-8 AL 700 FT AMSL AH FL160 DP 34:11:58 N 131:09:26 E DP 34:13:41 N 131:18:16 E DP 34:11:19 N 131:44:00 E DP 34:10:20 N 131:43:50 E DP 34:09:20 N 131:43.7697 E V D=- V X=34:08:27 N 132:13:57 E DB 34:09:20 N 131:43.7697 E,33:49:25 N 131:54:25 E DP 33:49:25 N 131:54:25 E DP 33:38:20 N 131:38:35 E DP 33:31:12 N 131:37:54 E DP 33:24:21 N 131:37:16 E DP 33:18:35 N 131:36:43 E DP 33:08:42 N 131:14:15 E DP 33:28:56 N 131:11:43 E DP 33:27:04 N 131:04:06 E DP 33:23:53 N 130:51:16 E DP 33:29:44 N 130:48:00 E DP 33:34:37 N 130:51:45 E DP 33:44:58 N 130:59:45 E DP 33:48:29 N 131:14:25 E DP 34:11:58 N 131:09:26 E AC E AN Tsuiki ACA-9 AL 700 FT AMSL AH 10000 FT AMSL DP 34:11:19 N 131:43:57 E V D=- V X=34:08:27 N 132:13:57 E DB 34:10:11 N 131:55:57 E,33:59:17 N 131:59:38 E DP 33:59:17 N 131:59:38 E DP 33:58:58 N 131:59:56 E DP 33:56:12 N 131:47:41 E DP 33:57.0739 N 131:47:06 E DP 33:57.9717 N 131:46.5701 E V D=+ V X=34:08:27 N 132:13:57 E DB 33:57.9717 N 131:46.5701 E,34:11:19 N 131:43:57 E AC E AN Tsuiki TCA-1 AL 5000 FT AMSL AH 10000 FT AMSL DP 34:09:44 N 130:57:57 E V X=33:41:18 N 131:02:09 E DB 34:10:49 N 131:03:31 E,34:6.40734 N 131:20:54 E DP 34:6.40734 N 131:20:54 E DP 34:06:03 N 131:21:30 E DP 34:02:07 N 131:18:24 E DP 34:02:40 N 131:17:24 E DP 34:3.1556 N 131:16:21 E V D=- V X=33:41:18 N 131:02:09 E DB 34:3.1556 N 131:16:21 E,34:05:38 N 131:08:07 E V X=34:2.82003 N 131:03:08 E DB 34:05:38 N 131:08:07 E,34:06:01 N 130:58:30 E DP 34:06:01 N 130:58:30 E DP 34:09:44 N 130:57:57 E AC E AN Tsuiki TCA-10 AL 4500 FT AMSL AH 6000 FT AMSL DP 33:40:47 N 130:41:49 E V D=- V X=33:41.2869 N 131:1.91787 E DB 33:41:54 N 130:46:35 E,33:38:34 N 130:46:55 E DP 33:38:34 N 130:46:55 E DP 33:37:56 N 130:43:25 E DP 33:40:47 N 130:41:49 E AC E AN Tsuiki TCA-11 AL 4500 FT AMSL AH 6000 FT AMSL DP 33:41:57 N 130:46:47 E DP 33:42:28 N 130:48:58 E DP 33:43:06 N 130:51:35 E DP 33:42:31 N 130:51:28 E DP 33:41:55 N 130:51.3896 E DP 33:41:45 N 130:51:23 E DP 33:41:57 N 130:46:47 E AC E AN Tsuiki TCA-12 AL 3500 FT AMSL AH 10000 FT AMSL DP 33:41:45 N 130:51:23 E DP 33:42.3511 N 130:51:23 E DP 33:42:57 N 130:51.4869 E V X=33:41:18 N 131:02:09 E DB 33:42:57 N 130:51.4869 E,33:50:15 N 131:00:50 E DP 33:50:15 N 131:00:50 E V D=- V X=33:41:06 N 131:02:25 E DB 33:46:02 N 131:01:27 E,33:41:53 N 130:56:29 E DP 33:41:53 N 130:56:29 E DP 33:41:32 N 130:56:27 E DP 33:41:45 N 130:51:23 E AC E AN Tsuiki TCA-13 AL 3000 FT AMSL AH 6000 FT AMSL DP 33:41:32 N 130:56:27 E DP 33:41:09 N 130:56:26 E DP 33:40:42 N 130:56:27 E DP 33:37:57 N 130:54:20 E DP 33:35:21 N 130:48:16 E DP 33:36:11 N 130:44:24 E DP 33:37:56 N 130:43:25 E V X=33:41.2867 N 131:01:55 E DB 33:38:34 N 130:46:55 E,33:41:54 N 130:46:35 E DP 33:41:54 N 130:46:35 E DP 33:41:45 N 130:51:23 E DP 33:41:32 N 130:56:27 E AC E AN Tsuiki TCA-14 AL 3500 FT AMSL AH 6000 FT AMSL DP 33:35:21 N 130:48:16 E DP 33:37:57 N 130:54:20 E DP 33:34:37 N 130:51:45 E DP 33:35:21 N 130:48:16 E AC E AN Tsuiki TCA-15 AL 3000 FT AMSL AH 10000 FT AMSL DP 33:37:57 N 130:54:20 E V D=- V X=33:41:05 N 131:02:19 E DB 33:40:42 N 130:56:27 E,33:39:04 N 130:56:57 E DP 33:39:04 N 130:56:57 E DP 33:37:57 N 130:54:20 E AC E AN Tsuiki TCA-16 AL 6001 FT AMSL AH 10000 FT AMSL V X=33:41:06 N 131:02:25 E DC 5 AC E AN Tsuiki TCA-17 AL 3001 FT AMSL AH 10000 FT AMSL V X=33:55:48 N 131:16:43 E DB 33:56:44 N 131:22:37 E,33:55:38 N 131:10:43 E DP 33:55:38 N 131:10:43 E DP 33:55.5356 N 131:10:57 E DP 33:55.1521 N 131:11:48 E DP 33:54:44 N 131:12:37 E DP 33:55:59 N 131:13:36 E DP 33:55:41 N 131:14.1409 E DP 33:55.1889 N 131:14.955 E DP 33:54:40 N 131:15.7396 E DP 33:54:06 N 131:16:29 E DP 33:58:07 N 131:21:01 E DP 33:58:07 N 131:21.0176 E DP 33:57:27 N 131:21:51 E DP 33:56:44 N 131:22:37 E AC E AN Tsuiki TCA-18 AL 1500 FT AMSL AH 10000 FT AMSL DP 33:55:40 N 131:03:03 E V X=33:41:18 N 131:02:09 E DB 33:57:18 N 131:03:09 E,33:55:43 N 131:10.5748 E DP 33:55:43 N 131:10.5748 E V D=- V X=33:55:48 N 131:16:43 E DB 33:55:38 N 131:10:43 E,33:56:44 N 131:22:37 E V D=+ V X=33:41:18 N 131:02:09 E DB 33:56:44 N 131:22:37 E,33:42:53 N 131:29.6915 E DP 33:42:53 N 131:29.6915 E DP 33:42:03 N 131:29:42 E V X=33:41.2582 N 131:02:23 E DB 33:41:53 N 131:23:07 E,33:37:19 N 131:22:34 E DP 33:37:19 N 131:22:34 E DP 33:40:06 N 131:08:17 E DP 33:40.5374 N 131:08:24 E DP 33:40:59 N 131:08:26 E V D=- V X=33:41:06 N 131:02:25 E DB 33:40:59 N 131:08:26 E,33:45:57 N 131:03:54 E V X=33:50:44 N 131:02:06 E DB 33:45:57 N 131:03:54 E,33:55:41 N 131:3.05594 E DP 33:55:41 N 131:3.05594 E DP 33:55:40 N 131:03:03 E AC E AN Tsuiki TCA-19 AL 3000 FT AMSL AH 10000 FT AMSL DP 34:00:05 N 131:27:16 E DP 33:59.8071 N 131:27:24 E DP 33:59.4178 N 131:27:40 E V D=- V X=34:02:04 N 131:32:47 E DB 33:59.4178 N 131:27:40 E,33:57:06 N 131:32:04 E V D=+ V X=33:41:18 N 131:02:09 E DB 33:57:06 N 131:32:04 E,33:43.3184 N 131:37.4726 E DP 33:43.3184 N 131:37.4726 E DP 33:42:14 N 131:37:29 E DP 33:42:03 N 131:29:42 E DP 33:42.7875 N 131:29.7069 E DP 33:43:45 N 131:29:37 E V D=- V X=33:41:18 N 131:02:09 E DB 33:43:45 N 131:29:37 E,33:56:40 N 131:22:42 E DP 33:56:40 N 131:22:42 E DP 34:00:05 N 131:27:16 E AC E AN Tsuiki TCA-2 AL 5000 FT AMSL AH 7000 FT AMSL DP 34:01:33 N 130:54:04 E DP 33:59:05 N 130:55:38 E DP 33:57:51 N 130:55:16 E DP 33:57.5576 N 130:54.3215 E V D=- V X=33:41:18 N 131:02:09 E DB 33:57.5576 N 130:54.3215 E,33:54:31 N 130:48:20 E DP 33:54:31 N 130:48:20 E DP 33:53:59 N 130:47:40 E DP 33:54.6561 N 130:47:52 E DP 33:55:19 N 130:48:07 E V D=+ V X=33:51:24 N 131:01:46 E DB 33:55:19 N 130:48:07 E,34:01:33 N 130:54:04 E AC E AN Tsuiki TCA-20 AL 3500 FT AMSL AH 10000 FT AMSL DP 33:39:04 N 130:56:57 E DP 33:38.7224 N 130:57:08 E DP 33:38.3392 N 130:57:25 E DP 33:37:59 N 130:57.7246 E DP 33:37:39 N 130:58:05 E DP 33:37:20 N 130:58:28 E DP 33:30:14 N 130:51:51 E DP 33:30.375 N 130:51.6343 E DP 33:30.8579 N 130:50:57 E DP 33:31.3705 N 130:50:18 E DP 33:31:55 N 130:49:41 E DP 33:34:37 N 130:51:45 E DP 33:37:57 N 130:54:20 E DP 33:39:04 N 130:56:57 E AC E AN Tsuiki TCA-21 AL 6000 FT AMSL AH 10000 FT AMSL DP 33:31:55 N 130:49:41 E DP 33:31.3705 N 130:50:18 E DP 33:30.8579 N 130:50:57 E DP 33:30.375 N 130:51.6343 E DP 33:30:14 N 130:51:51 E DP 33:27:27 N 130:49:16 E DP 33:29:44 N 130:48:00 E DP 33:31:55 N 130:49:41 E AC E AN Tsuiki TCA-22 AL 8000 FT AMSL AH 10000 FT AMSL DP 33:30:14 N 130:51:51 E DP 33:29.9905 N 130:52.1681 E DP 33:29:34 N 130:52.9058 E V D=- V X=33:41:18 N 131:02:09 E DB 33:29:34 N 130:52.9058 E,33:27:21 N 131:04:02 E DP 33:27:21 N 131:04:02 E DP 33:27:04 N 131:04:06 E DP 33:23:53 N 130:51:16 E DP 33:27:27 N 130:49:16 E DP 33:30:14 N 130:51:51 E AC E AN Tsuiki TCA-23 AL 5000 FT AMSL AH 10000 FT AMSL V X=33:41:18 N 131:02:09 E DB 33:28:17 N 131:08:25 E,33:29:59 N 130:52:13 E DP 33:29:59 N 130:52:13 E DP 33:30:14 N 130:51:51 E DP 33:37:20 N 130:58:28 E DP 33:37:03 N 130:58:53 E DP 33:36:48 N 130:59:20 E V D=- V X=33:41:06 N 131:02:25 E DB 33:36:48 N 130:59:20 E,33:36:24 N 131:04:30 E DP 33:36:24 N 131:04:30 E DP 33:28:17 N 131:08:25 E AC E AN Tsuiki TCA-24 AL 8000 FT AMSL AH 9000 FT AMSL DP 33:23:53 N 130:51:16 E DP 33:27:04 N 131:04:06 E V X=33:41:18 N 131:02:09 E DB 33:21:23 N 131:04:49 E,33:23:02 N 130:52:16 E DP 33:23:02 N 130:52:16 E DP 33:23:19 N 130:51:35 E DP 33:23:53 N 130:51:16 E AC E AN Tsuiki TCA-25 AL 8000 FT AMSL AH 10000 FT AMSL DP 33:28:17 N 131:08:25 E DP 33:22:43 N 131:11:06 E DP 33:22.3885 N 131:10.1034 E DP 33:22:07 N 131:9.08442 E V X=33:41:18 N 131:02:09 E DB 33:22:07 N 131:9.08442 E,33:21:23 N 131:04:49 E DP 33:21:23 N 131:04:49 E DP 33:27:04 N 131:04:06 E V D=- V X=33:41:18 N 131:02:09 E DB 33:27:21 N 131:04:02 E,33:28.2557 N 131:08:23 E DP 33:28.2557 N 131:08:23 E DP 33:28:17 N 131:08:25 E AC E AN Tsuiki TCA-26 AL 9000 FT AMSL AH 10000 FT AMSL DP 33:22:43 N 131:11:06 E DP 33:20:51 N 131:11:59 E DP 33:16:12 N 131:14:13 E DP 33:15:49 N 131:13:04 E DP 33:15.4856 N 131:11:53 E V X=33:41:18 N 131:02:09 E DB 33:15.4856 N 131:11:53 E,33:14:24 N 131:05:41 E DP 33:14:24 N 131:05:41 E V D=- V X=33:41:18 N 131:02:09 E DB 33:21:23 N 131:04:49 E,33:22:41 N 131:11.036 E DP 33:22:41 N 131:11.036 E DP 33:22:43 N 131:11:06 E AC E AN Tsuiki TCA-27 AL 4000 FT AMSL AH 10000 FT AMSL V D=- V X=33:41:06 N 131:02:25 E DB 33:36:24 N 131:04:30 E,33:39:40 N 131:08:11 E DP 33:39:40 N 131:08:11 E DP 33:40:06 N 131:08:17 E V X=33:41.2579 N 131:2.38533 E DB 33:37:19 N 131:22:34 E,33:41:53 N 131:23:07 E DP 33:41:53 N 131:23:07 E DP 33:42:03 N 131:29:42 E DP 33:42:14 N 131:37:29 E V D=+ V X=33:41:18 N 131:02:09 E DB 33:42:14 N 131:37.5536 E,33:23:03 N 131:29:55 E DP 33:23:03 N 131:29:55 E DP 33:27:42 N 131:22:52 E DP 33:27:28 N 131:22.7215 E DP 33:26:45 N 131:22:00 E V X=33:41:18 N 131:02:09 E DB 33:26:45 N 131:22:00 E,33:20:51 N 131:11:59 E DP 33:20:51 N 131:11:59 E DP 33:22:43 N 131:11:06 E DP 33:28:17 N 131:08:25 E DP 33:36:24 N 131:04:30 E AC E AN Tsuiki TCA-28 AL 7000 FT AMSL AH 10000 FT AMSL V D=- V X=33:41:18 N 131:02:09 E DB 33:20:51 N 131:11:59 E,33:27:28 N 131:22.7215 E DP 33:27:28 N 131:22.7215 E DP 33:27:42 N 131:22:52 E DP 33:23:03 N 131:29:55 E DP 33:22.1742 N 131:29:09 E DP 33:21:22 N 131:28:17 E V D=+ V X=33:41:18 N 131:02:09 E DB 33:21:22 N 131:28:17 E,33:13:53 N 131:15:19 E DP 33:13:53 N 131:15:19 E DP 33:20:51 N 131:11:59 E AC E AN Tsuiki TCA-3 AL 6000 FT AMSL AH 9000 FT AMSL DP 34:01:33 N 130:54:04 E DP 34:05:22 N 130:54:50 E DP 34:5.60548 N 130:56.0012 E DP 34:5.79099 N 130:57:11 E DP 34:5.9369 N 130:58.3738 E DP 34:05:57 N 130:58:30 E DP 33:58:47 N 130:59:34 E V D=- V X=33:41:18 N 131:02:09 E DB 33:58:42 N 130:59:42 E,33:58:00 N 130:55:46 E DP 33:58:00 N 130:55:46 E DP 33:57:51 N 130:55:16 E DP 33:59:05 N 130:55:38 E DP 34:01:33 N 130:54:04 E AC E AN Tsuiki TCA-4 AL 5001 FT AMSL AH 10000 FT AMSL V X=34:2.82307 N 131:03:08 E DB 34:06:01 N 130:58:30 E,33:58:47 N 130:59:34 E DP 33:58:47 N 130:59:34 E DP 34:05:57 N 130:58:30 E DP 34:06:01 N 130:58:30 E AC E AN Tsuiki TCA-5 AL 4000 FT AMSL AH 10000 FT AMSL V X=33:41:18 N 131:02:09 E DB 34:05:38 N 131:08:07 E,34:2.30356 N 131:18.1053 E DP 34:2.30356 N 131:18.1053 E DP 34:02:07 N 131:18:24 E V X=33:41:18 N 131:02:09 E DB 34:06:03 N 131:21:30 E,34:2.68444 N 131:26:38 E DP 34:2.68444 N 131:26:38 E DP 34:02:31 N 131:26:48 E DP 34:2.07139 N 131:26.7689 E V D=- V X=34:02:04 N 131:32.7843 E DB 34:2.07139 N 131:26.7689 E,34:00:05 N 131:27:16 E DP 34:00:05 N 131:27:16 E DP 33:56:40 N 131:22:42 E DP 33:57:23 N 131:21:56 E DP 33:58:03 N 131:21.1019 E DP 33:58:07 N 131:21:01 E DP 33:54:06 N 131:16:29 E DP 33:54:40 N 131:15.7396 E DP 33:55.1889 N 131:14.955 E DP 33:55:41 N 131:14.1409 E DP 33:55:59 N 131:13:36 E DP 33:54:44 N 131:12:37 E DP 33:55.1679 N 131:11.8071 E DP 33:55.5517 N 131:10:58 E V X=33:41:18 N 131:02:09 E DB 33:55.5517 N 131:10:58 E,33:57:18 N 131:03:09 E DP 33:57:18 N 131:03:09 E DP 33:57:48 N 131:03:11 E DP 33:57.8236 N 131:3.72238 E V X=34:02:49 N 131:03:08 E DB 33:57.8236 N 131:3.72238 E,34:05:34 N 131:08:12 E DP 34:05:34 N 131:08:12 E DP 34:05:38 N 131:08:07 E AC E AN Tsuiki TCA-6 AL 4500 FT AMSL AH 7000 FT AMSL DP 33:53:59 N 130:47:40 E DP 33:54:34 N 130:48:24 E DP 33:55:06 N 130:49.1707 E V X=33:41:18 N 131:02:09 E DB 33:55:06 N 130:49.1707 E,33:57:51 N 130:55:16 E DP 33:57:51 N 130:55:16 E DP 33:53:27 N 130:53:56 E DP 33:52:47 N 130:51:40 E V D=- V X=33:41:18 N 131:02:09 E DB 33:46:54 N 130:53:42 E,33:43.1363 N 130:51.5736 E DP 33:43.1363 N 130:51.5736 E DP 33:43:06 N 130:51:35 E DP 33:42:28 N 130:48:58 E DP 33:51:11 N 130:45:58 E V D=+ V X=33:51.4069 N 131:1.68495 E DB 33:51:35 N 130:47:20 E,33:53:59 N 130:47:40 E AC E AN Tsuiki TCA-7 AL 4500 FT AMSL AH 10000 FT AMSL DP 33:57:51 N 130:55:16 E DP 33:57:58 N 130:55:39 E DP 33:58:12 N 130:56:37 E DP 33:58:24 N 130:57:36 E DP 33:58:34 N 130:58.585 E DP 33:58:41 N 130:59:35 E DP 33:55:26 N 131:00:04 E V D=- V X=33:41:18 N 131:02:09 E DB 33:50:15 N 131:00:50 E,33:47:23 N 130:54.1371 E DP 33:47:23 N 130:54.1371 E DP 33:46:54 N 130:53:42 E DP 33:52:47 N 130:51:40 E DP 33:53:27 N 130:53:56 E DP 33:57:51 N 130:55:16 E AC E AN Tsuiki TCA-8 AL 2000 FT AMSL AH 10000 FT AMSL DP 33:58:41 N 130:59:35 E DP 33:58:42 N 130:59:42 E DP 33:58.4521 N 131:00:09 E DP 33:58:15 N 131:00:38 E V D=- V X=34:02:49 N 131:03:08 E DB 33:58:15 N 131:00:38 E,33:57:48 N 131:03:11 E DP 33:57:48 N 131:03:11 E DP 33:57:18 N 131:03:09 E DP 33:55:40 N 131:03:03 E V X=33:50:44 N 131:02:06 E DB 33:55:40 N 131:03:03 E,33:55.5221 N 131:0.384992 E DP 33:55.5221 N 131:0.384992 E DP 33:55:26 N 131:00:04 E DP 33:58:41 N 130:59:35 E AC E AN Tsuiki TCA-9 AL 3001 FT AMSL AH 10000 FT AMSL DP 33:55:26 N 131:00:04 E DP 33:55:35 N 131:0.574566 E DP 33:55:41 N 131:1.10191 E V X=33:50:44 N 131:02:06 E DB 33:55:41 N 131:1.10191 E,33:45:57 N 131:03:54 E V D=- V X=33:41:06 N 131:02:25 E DB 33:45:57 N 131:03:54 E,33:46.075 N 131:01:46 E DP 33:46.075 N 131:01:46 E DP 33:46:02 N 131:01:27 E DP 33:50:15 N 131:00:50 E DP 33:55:26 N 131:00:04 E AC E AN Utsunomiya ACA-1 AL 700 FT AMSL AH 4000 FT AMSL DP 36:41:05 N 140:26:05 E V X=36:29:03 N 139:51:59 E DB 36:32:44 N 140:09:56 E,36:17:39 N 140:03:53 E DP 36:17:39 N 140:03:53 E DP 36:17:17 N 140:03:01 E V X=36:29:03 N 139:51:59 E DB 36:17.1887 N 140:03:00 E,36:14:15 N 139:51:23 E DP 36:14:15 N 139:51:23 E DP 36:14.0048 N 139:50:29 E DP 36:14.0869 N 139:49.5216 E V X=36:29:03 N 139:51:59 E DB 36:14.0869 N 139:49.5216 E,36:25:13 N 139:33:50 E DP 36:25:13 N 139:33:50 E DP 36:28:09 N 139:39:00 E DP 36:33:23 N 139:48:18 E DP 36:45:56 N 140:12:29 E V X=36:29:03 N 139:51:59 E DB 36:58:35 N 139:59:31 E,36:42:11 N 140:25:47 E DP 36:42:11 N 140:25:47 E DP 36:41:05 N 140:26:05 E AC E AN Utsunomiya ACA-2 AL 700 FT AMSL AH 7000 FT AMSL DP 36:58:35 N 139:59:31 E DP 36:45:56 N 140:12:29 E DP 36:33:23 N 139:48:18 E DP 36:28:09 N 139:39:00 E V X=36:29:03 N 139:51:59 E DB 36:57:25 N 139:39:00 E,36:58.8542 N 139:58:11 E DP 36:58.8542 N 139:58:11 E DP 36:58:35 N 139:59:31 E AC E AN Yokota ACA-1 AL 700 FT AMSL AH FL230 DP 37:33:11 N 139:02:48 E DP 36:31:11 N 139:30:54 E DP 36:09:11 N 138:45:49 E DP 36:06:16 N 138:17:49 E DP 36:33:18 N 138:17:49 E DP 37:03:50 N 138:38:00 E DP 37:33:11 N 139:02:48 E AC E AN Yokota ACA-2 AL 700 FT AMSL AH FL180 DP 36:31:11 N 139:30:54 E DP 35:59:18 N 139:44:24 E DP 35:52:18 N 139:26:08 E DP 35:56:26 N 139:09:39 E DP 36:09:11 N 138:45:49 E DP 36:31:11 N 139:30:54 E AC E AN Yokota ACA-3 AL 700 FT AMSL AH FL160 DP 35:56:26 N 139:09:39 E DP 35:43:16 N 139:04:33 E DP 35:21:34 N 139:08:12 E DP 34:56:14 N 139:12:25 E DP 34:54:12 N 138:59:49 E DP 35:05:11 N 138:45:49 E DP 36:09:11 N 138:45:49 E DP 35:56:26 N 139:09:39 E AC E AN Yokota ACA-4 AL 700 FT AMSL AH 12000 FT AMSL DP 35:52:18 N 139:26:08 E DP 35:47:15 N 139:24:11 E DP 35:23:43 N 139:27:49 E DP 35:21:34 N 139:08:12 E DP 35:43:16 N 139:04:33 E DP 35:56:26 N 139:09:39 E DP 35:52:18 N 139:26:08 E AC E AN Yokota ACA-5 AL 700 FT AMSL AH FL140 DP 35:23:43 N 139:27:49 E DP 35:13:01 N 139:29:26 E DP 34:58:11 N 139:24:43 E DP 34:56:14 N 139:12:25 E DP 35:21:34 N 139:08:12 E DP 35:23:43 N 139:27:49 E AC E AN Yokota ACA-6 AL 700 FT AMSL AH 8000 FT AMSL DP 35:59:18 N 139:44:24 E DP 35:53:39 N 139:41:46 E DP 35:33:25 N 139:38:40 E DP 35:11:36 N 139:43:10 E DP 35:00:19 N 139:38:18 E DP 34:58:11 N 139:24:43 E DP 35:13:01 N 139:29:26 E DP 35:23:43 N 139:27:49 E DP 35:47:15 N 139:24:11 E DP 35:52:18 N 139:26:08 E DP 35:59:18 N 139:44:24 E AC E AN Yokota RASA-1 AL 2000 FT AMSL AH FL175 DP 36:31:11 N 139:30:54 E DP 35:59:18 N 139:44:24 E DP 35:56:26 N 139:09:39 E DP 36:21:06 N 139:10:13 E DP 36:31:11 N 139:30:54 E AC E AN Yokota RASA-2 AL 2000 FT AMSL AH 7500 FT AMSL DP 35:59:18 N 139:44:24 E DP 35:53:39 N 139:41:46 E DP 35:33:25 N 139:38:40 E DP 35:24:06 N 139:40:38 E DP 35:11:36 N 139:43:10 E DP 35:00:19 N 139:38:18 E DP 34:56:14 N 139:12:25 E DP 35:43:16 N 139:04:33 E DP 35:56:26 N 139:09:39 E DP 35:59:18 N 139:44:24 E AC E AN Yokota RASA-3 AL 7500 FT AMSL AH FL155 DP 36:21:06 N 139:10:13 E DP 35:56:26 N 139:09:39 E DP 35:43:16 N 139:04:33 E DP 34:56:14 N 139:12:25 E DP 34:54:12 N 138:59:49 E DP 35:05:11 N 138:45:49 E DP 36:09:11 N 138:45:49 E DP 36:21:06 N 139:10:13 E AC E AN Yokota RASA-High Traffic Area AL 2000 FT AMSL AH 4000 FT AMSL DP 35:46:27 N 139:40:36 E DP 35:33:25 N 139:38:40 E DP 35:24:06 N 139:40:38 E DP 35:24:06 N 139:33:47 E V D=- V X=35:27.2845 N 139:27:00 E DB 35:27:49 N 139:33:05 E,35:32:13 N 139:27:52 E DP 35:32:13 N 139:27:52 E DP 35:32:57 N 139:16:21 E DP 35:39:34 N 139:15:38 E DP 35:40:04 N 139:23:07 E DP 35:46:27 N 139:40:36 E AC G AN Akashi-Kawagoe HELI AL GND AH 2000 FT AMSL V X=35:57:30 N 139:28:02 E DC 1 AC G AN Akashi-Kawasaki HELI AL GND AH 2000 FT AMSL V X=34:39:28 N 134:57:57 E DC 1 AC G AN Amauksa AP AL GND AH 3000 FT AMSL V X=32:28:56 N 130:09:32 E DC 2 AC G AN Biei GP 1171FT AL GND AH 3000 FT AMSL V X=43:31:53 N 142:33:50 E DC 1 AC G AN Chofu AP AL GND AH 3000 FT AMSL V X=35:40:18 N 139:31:41 E DC 2.7 AC G AN CK-1-1 AL GND AH 1000 FT AMSL DP 35:21:12 N 136:38:49 E DP 35:19:12 N 136:44:49 E DP 35:09:28 N 136:47:09 E DP 35:9.40669 N 136:46:07 E DP 35:9.30678 N 136:45.0848 E DP 35:09:10 N 136:44:04 E DP 35:09:00 N 136:43:10 E DP 35:21:12 N 136:38:49 E AC G AN CK-11-1 AL GND AH 2500 FT AMSL DP 34:55:58 N 135:46:18 E DP 34:53:04 N 135:47:59 E DP 34:40:51 N 135:49:08 E DP 34:40:17 N 135:48:19 E DP 34:39:05 N 135:46:46 E DP 34:42:44 N 135:37:43 E DP 34:48:52 N 135:39:03 E DP 34:50:46 N 135:37:02 E DP 34:55:58 N 135:46:18 E AC G AN CK-11-2 AL GND AH 2500 FT AMSL DP 34:40:17 N 135:48:19 E DP 34:39:27 N 135:47:57 E DP 34:38:38 N 135:47:30 E V X=34:47:16 N 135:25:37 E DB 34:38:38 N 135:47:30 E,34:33:31 N 135:43:12 E DP 34:33:31 N 135:43:12 E DP 34:35:42 N 135:42:24 E DP 34:39:05 N 135:46:46 E DP 34:40:17 N 135:48:19 E AC G AN CK-11-3 AL GND AH 3000 FT AMSL DP 34:40:51 N 135:49:08 E DP 34:31:07 N 135:50:34 E DP 34:29:32 N 135:51:13 E DP 34:29:34 N 135:44:37 E V D=- V X=34:47:16 N 135:25:37 E DB 34:33:31 N 135:43:12 E,34:39:27 N 135:47.9538 E DP 34:39:27 N 135:47.9538 E DP 34:40:17 N 135:48:19 E DP 34:40:51 N 135:49:08 E AC G AN CK-11-4 AL GND AH 2000 FT AMSL DP 34:35:45 N 135:42:05 E DP 34:35:42 N 135:42:24 E DP 34:33:31 N 135:43:12 E DP 34:29:34 N 135:44:37 E DP 34:29:35 N 135:36:51 E DP 34:29:24 N 135:36:25 E DP 34:30:21 N 135:35:51 E DP 34:30:51 N 135:35:52 E DP 34:30:50 N 135:36.407 E DP 34:30:53 N 135:36:57 E V D=- V X=34:35:48 N 135:36:02 E DB 34:30:53 N 135:36:57 E,34:35:45 N 135:42:05 E AC G AN CK-11-5 AL GND AH 4000 FT AMSL DP 34:29:35 N 135:36:51 E DP 34:29:32 N 135:51:13 E DP 34:23:58 N 135:53:26 E DP 34:18:53 N 135:36:19 E DP 34:27:29 N 135:33:51 E DP 34:28:48 N 135:34:51 E DP 34:29.1576 N 135:35:51 E DP 34:29.5513 N 135:36:49 E DP 34:29:35 N 135:36:51 E AC G AN CK-11-6 AL GND AH 2500 FT AMSL DP 34:27:29 N 135:33:51 E DP 34:18:53 N 135:36:19 E DP 34:09:19 N 135:12:34 E DP 34:15:22 N 135:18:39 E DP 34:23:52 N 135:31:42 E DP 34:27:29 N 135:33:51 E AC G AN CK-12 AL GND AH 4000 FT AMSL DP 33:28:12 N 135:29:50 E DP 33:28:12 N 135:47:50 E DP 33:14:12 N 135:47:50 E DP 33:14:12 N 135:29:50 E DP 33:28:12 N 135:29:50 E AC G AN CK-1-2-1 AL GND AH 2500 FT AMSL DP 35:22:12 N 136:35:49 E DP 35:21:12 N 136:38:49 E DP 35:16:25 N 136:40:32 E DP 35:14:36 N 136:36:22 E DP 35:22:12 N 136:35:49 E AC G AN CK-1-2-2 AL GND AH 2500 FT AMSL DP 35:16:25 N 136:40:32 E V D=- V X=34:51:29 N 136:48:11 E DB 35:09:00 N 136:43:10 E,35:7.15317 N 136:37.3911 E DP 35:7.15317 N 136:37.3911 E DP 35:06:52 N 136:36:49 E DP 35:14:36 N 136:36:22 E DP 35:16:25 N 136:40:32 E AC G AN CK-1-3 AL GND AH 2000 FT AMSL DP 35:08:12 N 136:36:49 E DP 35:00:12 N 136:36:49 E DP 34:52:12 N 136:34:50 E DP 34:51:12 N 136:27:50 E DP 35:08:12 N 136:29:50 E DP 35:08:12 N 136:36:49 E AC G AN CK-13-1 AL GND AH 2000 FT AMSL DP 34:46:28 N 134:43:00 E DP 34:40:18 N 134:55:42 E DP 34:39:32 N 134:55:34 E DP 34:38:46 N 134:55.4884 E V D=- V X=34:37:52 N 135:13:43 E DB 34:38:46 N 134:55.4884 E,34:33:20 N 134:56:19 E DP 34:33:20 N 134:56:19 E DP 34:31:00 N 134:52:28 E DP 34:31:00 N 134:43:00 E DP 34:46:28 N 134:43:00 E AC G AN CK-13-2 AL GND AH 3000 FT AMSL DP 34:45:42 N 134:35:00 E DP 34:46:28 N 134:43:00 E DP 34:31:00 N 134:43:00 E DP 34:31:00 N 134:52:28 E DP 34:26:00 N 134:47:44 E DP 34:26:00 N 134:35:00 E DP 34:45:42 N 134:35:00 E AC G AN CK-1-4 AL GND AH 2500 FT AMSL DP 34:49:03 N 137:10:06 E DP 34:38:27 N 137:10:46 E DP 34:38:21 N 137:03:31 E DP 34:48:37 N 137:02:54 E DP 34:49:03 N 137:10:06 E AC G AN CK-1-5 AL GND AH 3000 FT AMSL DP 34:49:29 N 137:17:26 E DP 34:38:31 N 137:18:08 E DP 34:38:27 N 137:10:46 E DP 34:49:03 N 137:10:06 E DP 34:49:29 N 137:17:26 E AC G AN CK-21-1 AL 6000 FT AMSL AH 10000 FT AMSL DP 35:15:11 N 133:46:50 E DP 35:13:51 N 133:55:50 E DP 35:06:12 N 134:23:50 E DP 35:04:01 N 134:26:39 E V D=- V X=34:40:17 N 134:00:54 E DB 35:00:43 N 134:13:51 E,35:03:19 N 134:00:18 E DP 35:03:19 N 134:00:18 E DP 35:03:15 N 134:00:03 E DP 35:3.60663 N 133:59:03 E DP 35:03:55 N 133:58:02 E V X=34:45.0226 N 133:50.1033 E DB 35:03:55 N 133:58:02 E,35:04:57 N 133:51:52 E DP 35:04:57 N 133:51:52 E DP 35:11:23 N 133:42:49 E DP 35:15:11 N 133:46:50 E AC G AN CK-21-2A AL GND AH 6000 FT AMSL DP 35:21:11 N 133:42:50 E V D=- V X=35:19:00 N 133:56:25 E DB 35:18:57 N 133:53:58 E,35:17.9182 N 133:58:29 E DP 35:17.9182 N 133:58:29 E DP 35:18:00 N 133:58:32 E DP 35:10:11 N 134:27:50 E DP 34:58:12 N 134:42:50 E V X=34:40:17 N 134:00:54 E DB 34:53:51 N 134:23:29 E,35:3.25765 N 134:0.285984 E DP 35:3.25765 N 134:0.285984 E DP 35:03:15 N 134:00:03 E DP 35:3.60663 N 133:59:03 E V X=34:45.0227 N 133:50.1033 E DB 35:3.60663 N 133:59:03 E,35:04:57 N 133:51:52 E DP 35:04:57 N 133:51:52 E V X=35:29.6067 N 133:13.9517 E DB 35:14:31 N 133:38:24 E,35:20.6031 N 133:42.5747 E DP 35:20.6031 N 133:42.5747 E DP 35:21:11 N 133:42:50 E AC G AN CK-21-2B AL 2000 FT AMSL AH 6000 FT AMSL DP 35:18:57 N 133:53:58 E DP 35:18:11 N 133:57:50 E DP 35:18:00 N 133:58:32 E DP 35:17.9182 N 133:58:29 E DP 35:17:42 N 133:58.2703 E V X=35:19:00 N 133:56:25 E DB 35:17:42 N 133:58.2703 E,35:18:57 N 133:53:58 E AC G AN CK-3 AL GND AH 5000 FT AMSL DP 35:21:18 N 136:16:42 E DP 35:17:16 N 136:15:06 E DP 35:13:01 N 136:06:39 E DP 35:10:41 N 136:03:25 E DP 35:09:32 N 136:03:14 E DP 35:07:40 N 135:56:53 E DP 35:02:22 N 135:54:31 E DP 35:00:07 N 135:54:21 E DP 35:01:04 N 135:51:59 E DP 35:07:25 N 135:55:57 E DP 35:09:16 N 135:56:15 E DP 35:10:50 N 135:55:14 E DP 35:16:48 N 136:01:09 E DP 35:18:59 N 136:04:45 E DP 35:19:38 N 136:04:55 E DP 35:21:22 N 136:04:05 E DP 35:22:56 N 136:02:26 E DP 35:25:20 N 136:02:55 E DP 35:25:55 N 136:02:39 E DP 35:27:07 N 136:03:49 E DP 35:26:52 N 136:05:30 E DP 35:27:14 N 136:07:33 E DP 35:26:26 N 136:08:47 E DP 35:26:39 N 136:09:14 E DP 35:27:48 N 136:09:38 E DP 35:29:00 N 136:09:33 E DP 35:29:46 N 136:11:06 E DP 35:26:50 N 136:11:06 E DP 35:23:16 N 136:12:47 E DP 35:23:01 N 136:14:58 E DP 35:21:18 N 136:16:42 E AC G AN CK-4 AL GND AH 6000 FT AMSL DP 35:26:31 N 135:26:01 E DP 35:22:11 N 135:46:50 E DP 35:10:12 N 135:41:50 E DP 35:13:12 N 135:27:50 E V D=- V X=35:29:25 N 135:22:38 E DB 35:25:28 N 135:23:27 E,35:26.2675 N 135:25.6726 E DP 35:26.2675 N 135:25.6726 E DP 35:26:31 N 135:26:01 E AC G AN CS-1 AL GND AH 4000 FT AMSL DP 34:50:12 N 133:20:51 E DP 34:50:12 N 133:29:51 E DP 34:38:12 N 133:29:51 E DP 34:30:12 N 133:36:51 E DP 34:30:12 N 133:20:51 E DP 34:50:12 N 133:20:51 E AC G AN CS-1-3 AL GND AH 4000 FT AMSL DP 34:45:12 N 134:26:50 E DP 34:34:12 N 134:29:50 E DP 34:30:12 N 134:29:50 E DP 34:30:12 N 134:14:50 E DP 34:32:12 N 134:09:50 E DP 34:36:12 N 134:09:50 E DP 34:43:12 N 134:14:50 E DP 34:45:12 N 134:26:50 E AC G AN CS-2-1 AL GND AH 2000 FT AMSL DP 34:30:12 N 133:32:51 E DP 34:27:12 N 133:44:50 E DP 34:18:12 N 133:47:50 E DP 34:07:12 N 133:37:51 E DP 34:08:12 N 133:29:51 E DP 34:30:12 N 133:32:51 E AC G AN CS-2-2 AL GND AH 4000 FT AMSL DP 34:30:12 N 133:32:51 E DP 34:08:12 N 133:29:51 E DP 34:10:12 N 133:18:51 E DP 34:23:12 N 133:23:51 E DP 34:30:12 N 133:32:51 E AC G AN Fujikawa GP 16FT AL GND AH 2000 FT AMSL V X=35:07:16 N 138:37:54 E DC 1 AC G AN Fukushimaken-Keisatsu HELI AL GND AH 2000 FT AMSL V X=37:42:31 N 140:22:44 E DC 1 AC G AN Fukushima-Sky-Park GP 1318FT AL GND AH 3000 FT AMSL V X=37:49:24 N 140:23:16 E DC 1 AC G AN Futaba GP 1029FT AL GND AH 3000 FT AMSL V X=35:40:53 N 138:29:01 E DC 1 AC G AN Gunma HELI AL GND AH 2000 FT AMSL V X=36:19:04 N 139:06:25 E DC 1 AC G AN Hamakita GP 110FT AL GND AH 2000 FT AMSL V X=34:50:30 N 137:49:27 E DC 1 AC G AN Hanyu GP 63FT AL GND AH 2000 FT AMSL V X=36:11:31 N 139:36:33 E DC 1 AC G AN Hateruma AP AL GND AH 3000 FT AMSL V X=24:03:30 N 123:48:14 E DC 2 AC G AN Hida GP 2344FT AL GND AH 4000 FT AMSL V X=36:10:46 N 137:18:49 E DC 1 AC G AN Hiroshima HELI AL GND AH 2000 FT AMSL V X=34:22:17 N 132:25:04 E DC 1 AC G AN HK-1-1 AL GND AH FL200 DP 44:18:10 N 142:38:07 E DP 44:13:18 N 142:39:16 E DP 44:03:37 N 142:31:38 E DP 44:17:16 N 142:26:30 E DP 44:18:10 N 142:38:07 E AC G AN HK-11-1 AL GND AH 1000 FT AMSL DP 43:14:46 N 141:52:31 E DP 43:03:23 N 141:47:02 E V D=- V X=43:07:03 N 141:22:53 E DB 43:04:40 N 141:40:20 E,43:08:58 N 141:40.4515 E DP 43:08:58 N 141:40.4515 E DP 43:09:38 N 141:40:17 E DP 43:14:46 N 141:52:31 E AC G AN HK-11-2 AL GND AH 2000 FT AMSL DP 43:19:58 N 141:51:17 E DP 43:14:46 N 141:52:31 E DP 43:09:38 N 141:40:17 E DP 43:10.337 N 141:40:05 E DP 43:11:02 N 141:39.8015 E V D=- V X=43:07:03 N 141:22:53 E DB 43:11:02 N 141:39.8015 E,43:15:01 N 141:36:55 E DP 43:15:01 N 141:36:55 E DP 43:19:58 N 141:51:17 E AC G AN HK-11-3 AL GND AH 5000 FT AMSL DP 43:44:20 N 141:20:25 E DP 43:29:40 N 141:54:10 E DP 43:19:58 N 141:51:17 E DP 43:15:01 N 141:36:55 E DP 43:15.5916 N 141:36.3204 E DP 43:16.1222 N 141:35:39 E V D=- V X=43:07:03 N 141:22:53 E DB 43:16.1222 N 141:35:39 E,43:19:57 N 141:25:04 E DP 43:19:57 N 141:25:04 E DP 43:24:01 N 141:26:02 E DP 43:44:20 N 141:20:25 E AC G AN HK-1-2 AL GND AH FL150 DP 44:13:18 N 142:39:16 E DP 44:06:53 N 142:42:27 E DP 44:00:37 N 142:32:42 E DP 44:03:37 N 142:31:38 E DP 44:13:18 N 142:39:16 E AC G AN HK-12-1 AL GND AH 10000 FT AMSL DP 42:49:36 N 140:48:24 E DP 42:48:53 N 140:57:01 E V D=- V X=41:46.4417 N 140:49:56 E DB 42:31:28 N 140:51:15 E,42:27:58 N 140:26:25 E DP 42:27:58 N 140:26:25 E DP 42:27:28 N 140:25:01 E DP 42:48:30 N 140:31:42 E DP 42:49:36 N 140:48:24 E AC G AN HK-12-2 AL GND AH 7000 FT AMSL DP 42:48:53 N 140:57:01 E DP 42:47:40 N 141:15:58 E DP 42:29:01 N 141:09:39 E DP 42:29.4543 N 141:07:56 E DP 42:29.8348 N 141:6.18551 E V D=- V X=41:46.4411 N 140:49:56 E DB 42:29.8348 N 141:6.18551 E,42:31:28 N 140:51:15 E DP 42:31:28 N 140:51:15 E DP 42:48:53 N 140:57:01 E AC G AN HK-12-3 AL GND AH 6000 FT AMSL DP 42:31:28 N 140:51:15 E V D=- V X=41:46:27 N 140:49:56 E DB 42:16:10 N 140:46:13 E,42:03:14 N 140:16.7575 E DP 42:03:14 N 140:16.7575 E DP 42:02:25 N 140:16:06 E DP 42:27:28 N 140:25:01 E DP 42:28.0382 N 140:26:40 E DP 42:28.5365 N 140:28:21 E V D=+ V X=41:46.4416 N 140:49:56 E DB 42:28.5365 N 140:28:21 E,42:31:28 N 140:51:15 E AC G AN HK-12-4 AL GND AH 5000 FT AMSL V X=41:46.4417 N 140:49:56 E DB 42:31:28 N 140:51:15 E,42:29.172 N 141:09:07 E DP 42:29.172 N 141:09:07 E DP 42:29:01 N 141:09:39 E DP 42:05:00 N 141:01:36 E DP 42:02:27 N 140:41:45 E DP 42:31:28 N 140:51:15 E AC G AN HK-12-5 AL GND AH 2500 FT AMSL DP 42:16:10 N 140:46:13 E DP 41:58:50 N 140:40:30 E DP 42:02:25 N 140:16:06 E DP 42:03:21 N 140:16.8687 E DP 42:4.23864 N 140:17.7203 E V X=41:46.4416 N 140:49:56 E DB 42:4.23864 N 140:17.7203 E,42:16:10 N 140:46:13 E AC G AN HK-12-6 AL GND AH 2500 FT AMSL DP 42:05:09 N 141:02:47 E DP 41:48:55 N 141:11:06 E DP 41:56:11 N 140:57:01 E DP 41:58:50 N 140:40:30 E DP 42:02:27 N 140:41:45 E DP 42:05:09 N 141:02:47 E AC G AN HK-1-3 AL GND AH 5000 FT AMSL DP 44:21:19 N 142:01:55 E DP 44:17:31 N 142:24:54 E DP 44:17:16 N 142:26:30 E DP 44:00:37 N 142:32:42 E DP 43:58:12 N 142:27:17 E DP 44:00:36 N 142:09:14 E DP 44:05:29 N 142:05:09 E DP 44:21:19 N 142:01:55 E AC G AN HK-2-1 AL 4000 FT AMSL AH 8000 FT AMSL DP 43:35:43 N 143:08:47 E DP 43:10:12 N 143:11:15 E DP 43:11:49 N 142:56:10 E DP 43:08:08 N 142:45:52 E DP 43:09:31 N 142:46:02 E DP 43:09:42 N 142:45:52 E DP 43:10:25 N 142:46:46 E DP 43:12:01 N 142:45:47 E DP 43:12:40 N 142:44:32 E DP 43:13:57 N 142:43:59 E DP 43:15:41 N 142:44:50 E DP 43:17:56 N 142:44:06 E DP 43:20:26 N 142:44:58 E DP 43:20:44 N 142:46:10 E DP 43:21:38 N 142:43:09 E DP 43:24:17 N 142:40:16 E DP 43:25:04 N 142:41:09 E DP 43:25:57 N 142:42:38 E DP 43:27:06 N 142:42:52 E DP 43:27:07 N 142:43:30 E DP 43:30:59 N 142:48:55 E DP 43:31:49 N 142:48:52 E DP 43:31:36 N 142:50:58 E DP 43:33:54 N 142:51:41 E DP 43:33:53 N 142:54:24 E DP 43:31:35 N 142:57:32 E DP 43:32:17 N 142:58:34 E DP 43:31:43 N 143:00:50 E DP 43:33:42 N 143:02:21 E DP 43:33:19 N 143:03:34 E DP 43:35:42 N 143:08:32 E DP 43:35:43 N 143:08:47 E AC G AN HK-2-11 AL GND AH 6000 FT AMSL DP 42:55:06 N 143:23:58 E DP 42:47:51 N 143:31:05 E DP 42:45:39 N 143:34:08 E DP 42:45:08 N 143:34:07 E DP 42:44:53 N 143:34:23 E DP 42:44:46 N 143:35:29 E DP 42:44:40 N 143:35:48 E DP 42:43:50 N 143:35:34 E DP 42:42:38 N 143:36:05 E DP 42:41:56 N 143:37:04 E DP 42:41:41 N 143:39:56 E DP 42:38:07 N 143:35:24 E DP 42:34:34 N 143:31:45 E DP 42:27:08 N 143:24:50 E DP 42:30:00 N 143:21:35 E DP 42:33:52 N 143:18:09 E V D=- V X=42:44:00 N 143:13:02 E DB 42:39:21 N 143:15:30 E,42:46:47 N 143:18:41 E DP 42:46:47 N 143:18:41 E DP 42:46:48 N 143:18:39 E DP 42:47:19 N 143:19:40 E DP 42:50:52 N 143:21:14 E DP 42:52:57 N 143:20:06 E DP 42:54:29 N 143:21:21 E DP 42:55:06 N 143:23:58 E AC G AN HK-2-12 AL GND AH 6000 FT AMSL DP 42:56:27 N 143:43:14 E DP 42:55:33 N 143:43:34 E DP 42:54.6571 N 143:43.972 E V D=- V X=43:02:02 N 144:12:15 E DB 42:54.6571 N 143:43.972 E,42:48:11 N 143:48:58 E DP 42:48:11 N 143:48:58 E DP 42:41:41 N 143:39:56 E DP 42:41:56 N 143:37:04 E DP 42:42:38 N 143:36:05 E DP 42:43:50 N 143:35:34 E DP 42:44:40 N 143:35:48 E DP 42:44:46 N 143:35:29 E DP 42:44:53 N 143:34:23 E DP 42:45:08 N 143:34:07 E DP 42:45:39 N 143:34:08 E DP 42:47:51 N 143:31:05 E DP 42:55:06 N 143:23:58 E DP 42:55:44 N 143:26:54 E DP 42:56:27 N 143:43:14 E AC G AN HK-2-13 AL GND AH 4000 FT AMSL V X=43:15:04 N 143:17:53 E DC 5 AC G AN HK-2-14 AL GND AH 2000 FT AMSL DP 43:10:12 N 143:11:15 E DP 43:09:18 N 143:19:36 E DP 43:02:02 N 143:18:00 E DP 43:02:27 N 143:12:34 E DP 43:10:12 N 143:11:15 E AC G AN HK-2-2 AL 2000 FT AMSL AH 6000 FT AMSL DP 43:35:43 N 143:08:47 E DP 43:33:53 N 143:38:10 E DP 43:33:02 N 143:39:07 E DP 43:32:14 N 143:40:09 E V D=- V X=43:53:06 N 144:9.97108 E DB 43:32:14 N 143:40:09 E,43:23:55 N 144:00:19 E DP 43:23:55 N 144:00:19 E V X=43:02:02 N 144:12:15 E DB 43:22:18 N 144:00:34 E,43:11:32 N 143:45:05 E DP 43:11:32 N 143:45:05 E DP 43:11:13 N 143:44:57 E DP 43:07:28 N 143:36:38 E DP 43:10:12 N 143:11:15 E DP 43:14:38 N 143:10.8212 E DP 43:14:40 N 143:11:03 E DP 43:14.3537 N 143:11:06 E DP 43:14.191 N 143:11:09 E V X=43:15:04 N 143:17:53 E DB 43:14.191 N 143:11:09 E,43:15:09 N 143:11.0412 E DP 43:15:09 N 143:11.0412 E DP 43:14.6681 N 143:11:03 E DP 43:14:38 N 143:10.8217 E DP 43:35:43 N 143:08:47 E AC G AN HK-2-2B AL 4000 FT AMSL AH 6000 FT AMSL V X=43:15:04 N 143:17:53 E DC 5 AC G AN HK-2-4 AL 3500 FT AMSL AH 6000 FT AMSL DP 43:11:49 N 142:56:10 E DP 43:10:12 N 143:11:15 E DP 42:57:28 N 143:13:23 E V D=- V X=42:53:25 N 143:09:30 E DB 42:57:32 N 143:13:22 E,42:53.9891 N 143:2.72488 E DP 42:53.9891 N 143:2.72488 E DP 42:53:59 N 143:02:45 E DP 42:54:00 N 142:45:25 E DP 42:55:32 N 142:46:39 E DP 42:56:16 N 142:45:56 E DP 42:57:53 N 142:44:59 E DP 42:58:30 N 142:45:18 E DP 42:58:39 N 142:45:50 E DP 42:59:18 N 142:45:51 E DP 43:00:14 N 142:44:28 E DP 43:00:48 N 142:45:15 E DP 43:03:26 N 142:44:50 E DP 43:04:32 N 142:43:34 E DP 43:05:17 N 142:44:37 E DP 43:05:42 N 142:44:11 E DP 43:06:37 N 142:45:04 E DP 43:06:53 N 142:44:42 E DP 43:07:21 N 142:45:09 E DP 43:07:16 N 142:45:46 E DP 43:08:08 N 142:45:52 E DP 43:11:49 N 142:56:10 E AC G AN HK-2-5 AL 3500 FT AMSL AH 6000 FT AMSL DP 43:10:12 N 143:11:15 E DP 43:07:28 N 143:36:38 E DP 43:06:58 N 143:32:39 E DP 43:04:35 N 143:29:09 E DP 43:01:49 N 143:26:41 E DP 42:58:59 N 143:27:02 E DP 42:56:11 N 143:26:18 E DP 42:55:44 N 143:26:54 E DP 42:54:29 N 143:21:21 E DP 42:52:57 N 143:20:06 E DP 42:50:52 N 143:21:14 E DP 42:47:19 N 143:19:40 E DP 42:46:48 N 143:18:39 E DP 42:47.1712 N 143:18:19 E DP 42:47.5045 N 143:17.9047 E V D=- V X=42:44:00 N 143:13:02 E DB 42:47.5045 N 143:17.9047 E,42:49:00 N 143:12:40 E DP 42:49:00 N 143:12:40 E DP 42:49.2192 N 143:13:12 E DP 42:49:29 N 143:13:42 E V X=42:53:25 N 143:09:30 E DB 42:49:29 N 143:13:42 E,42:57:32 N 143:13:22 E DP 42:57:32 N 143:13:22 E DP 43:10:12 N 143:11:15 E AC G AN HK-2-6 AL GND AH 6000 FT AMSL V D=- V X=43:02:02 N 144:12.2372 E DB 43:11:13 N 143:44:57 E,42:56:27 N 143:43:14 E DP 42:56:27 N 143:43:14 E DP 42:55:44 N 143:26:54 E DP 42:56:11 N 143:26:18 E DP 42:58:59 N 143:27:02 E DP 43:01:49 N 143:26:41 E DP 43:04:35 N 143:29:09 E DP 43:06:58 N 143:32:39 E DP 43:07:28 N 143:36:38 E DP 43:11:13 N 143:44:57 E AC G AN HK-2-7 AL GND AH 6000 FT AMSL DP 42:54:00 N 142:45:25 E DP 42:53:59 N 143:02:45 E DP 42:53.5396 N 143:2.68441 E DP 42:53:06 N 143:02:42 E V D=- V X=42:53:25 N 143:09:30 E DB 42:53:06 N 143:02:42 E,42:48:29 N 143:08:26 E DP 42:48:29 N 143:08:26 E DP 42:47:33 N 143:08:15 E DP 42:47.2218 N 143:7.8371 E V X=42:44:00 N 143:13:02 E DB 42:47.2218 N 143:7.8371 E,42:41.7741 N 143:06:57 E DP 42:41.7741 N 143:06:57 E DP 42:41:44 N 143:06:59 E DP 42:41:05 N 143:06:03 E DP 42:40:15 N 143:06:17 E DP 42:39:26 N 143:06:07 E DP 42:38:39 N 143:05:29 E DP 42:38:10 N 143:04:46 E DP 42:36:47 N 143:03:36 E DP 42:36:01 N 142:57:36 E DP 42:35:01 N 142:55:58 E DP 42:35:16 N 142:55:24 E DP 42:32:56 N 142:49:41 E DP 42:33:01 N 142:49:38 E DP 42:33:28 N 142:49:44 E DP 42:34:14 N 142:49:32 E DP 42:34:25 N 142:49:18 E DP 42:34:24 N 142:49:00 E DP 42:34:37 N 142:48:42 E DP 42:35:17 N 142:48:36 E DP 42:35:47 N 142:48:02 E DP 42:36:10 N 142:47:52 E DP 42:36:44 N 142:47:46 E DP 42:36:55 N 142:47:39 E DP 42:37:11 N 142:47:20 E DP 42:37:18 N 142:46:16 E DP 42:37:29 N 142:46:01 E DP 42:37:36 N 142:46:09 E DP 42:38:08 N 142:46:09 E DP 42:38:17 N 142:45:48 E DP 42:38:42 N 142:45:18 E DP 42:38:55 N 142:45:15 E DP 42:39:25 N 142:45:23 E DP 42:39:34 N 142:45:07 E DP 42:39:50 N 142:45:07 E DP 42:40:05 N 142:45:12 E DP 42:41:01 N 142:45:49 E DP 42:41:27 N 142:45:23 E DP 42:41:50 N 142:45:31 E DP 42:42:25 N 142:45:22 E DP 42:43:05 N 142:45:27 E DP 42:43:20 N 142:45:22 E DP 42:43:29 N 142:45:00 E DP 42:43:20 N 142:44:38 E DP 42:43:17 N 142:44:04 E DP 42:43:23 N 142:43:42 E DP 42:43:51 N 142:43:32 E DP 42:44:09 N 142:43:20 E DP 42:44:16 N 142:42:43 E DP 42:44:12 N 142:42:18 E DP 42:44:20 N 142:41:36 E DP 42:44:35 N 142:41:18 E DP 42:44:59 N 142:41:12 E DP 42:45:42 N 142:41:37 E DP 42:45:53 N 142:41:53 E DP 42:46:01 N 142:41:52 E DP 42:46:26 N 142:42:41 E DP 42:46:32 N 142:43:11 E DP 42:47:00 N 142:42:59 E DP 42:47:31 N 142:43:17 E DP 42:48:13 N 142:43:14 E DP 42:49:28 N 142:43:55 E V D=+ V X=42:49.622 N 142:45.856 E DB 42:49:37 N 142:43:47 E,42:51:04 N 142:46:18 E DP 42:51:04 N 142:46:18 E DP 42:51:34 N 142:46:52 E DP 42:51:39 N 142:47:10 E DP 42:51:48 N 142:47:17 E DP 42:52:07 N 142:47:09 E DP 42:52:21 N 142:46:13 E DP 42:53:32 N 142:45:51 E DP 42:53:51 N 142:45:23 E DP 42:54:00 N 142:45:25 E AC G AN HK-2-9 AL GND AH 4000 FT AMSL DP 42:39:21 N 143:15:30 E DP 42:33:52 N 143:18:09 E DP 42:30:00 N 143:21:35 E DP 42:27:08 N 143:24:50 E DP 42:21:21 N 143:21:04 E DP 42:18:37 N 143:19:30 E DP 42:16:31 N 143:19:03 E DP 42:14:50 N 143:18:29 E DP 42:12:06 N 143:20:06 E DP 42:09:36 N 143:19:26 E DP 42:09:00 N 143:14:19 E DP 42:24:09 N 143:07:46 E DP 42:25:42 N 142:54:25 E DP 42:27:00 N 142:53:56 E DP 42:27:00 N 142:53:37 E DP 42:27:58 N 142:52:57 E DP 42:28:06 N 142:53:07 E DP 42:28:40 N 142:53:09 E DP 42:28:49 N 142:53:22 E DP 42:29:16 N 142:53:29 E DP 42:29:50 N 142:53:10 E DP 42:29:57 N 142:52:16 E DP 42:30:25 N 142:51:56 E DP 42:30:48 N 142:51:23 E DP 42:31:12 N 142:51:25 E DP 42:31:40 N 142:51:51 E DP 42:32:29 N 142:51:50 E DP 42:32:43 N 142:51:08 E DP 42:32:41 N 142:50:43 E DP 42:32:54 N 142:49:43 E DP 42:32:56 N 142:49:41 E DP 42:35:16 N 142:55:24 E DP 42:35:01 N 142:55:58 E DP 42:36:01 N 142:57:36 E DP 42:36:47 N 143:03:36 E DP 42:38:10 N 143:04:46 E DP 42:38:39 N 143:05:29 E DP 42:39:26 N 143:06:07 E DP 42:40:15 N 143:06:17 E DP 42:41:05 N 143:06:03 E V D=- V X=42:44:00 N 143:13.0233 E DB 42:41:44 N 143:06:59 E,42:39:21 N 143:15:30 E AC G AN HK-3 AL GND AH 8000 FT AMSL DP 42:09:00 N 143:44:00 E DP 41:55:20 N 143:38:31 E DP 41:55:20 N 143:20:13 E DP 42:09:00 N 143:14:19 E DP 42:09:00 N 143:44:00 E AC G AN Hojubana GP 30FT AL GND AH 2000 FT AMSL V X=36:02:03 N 139:48:37 E DC 1 AC G AN Honda AP AL GND AH 2000 FT AMSL V X=35:58:34 N 139:31:26 E DC 2 AC G AN Iejima Civil AP AL GND AH 3000 FT AMSL V X=26:43:21 N 127:47:13 E DC 2 AC G AN Ishikawaken-Keisatsu HELI AL GND AH 2000 FT AMSL V X=36:38:38 N 136:39:57 E DC 1 AC G AN Itakura GP 57FT AL GND AH 2000 FT AMSL V X=36:15:53 N 139:37:59 E DC 1 AC G AN Iwojima AP AL GND AH 3000 FT AMSL V X=30:47:04 N 130:16:14 E DC 2 AC G AN Kakuda GP 14FT AL GND AH 2000 FT AMSL V X=38:00:37 N 140:48:10 E DC 1 AC G AN Kamigoto AP AL GND AH 3000 FT AMSL V X=33:00:49 N 129:11:33 E DC 2 AC G AN Kazo GP 56FT AL GND AH 2000 FT AMSL V X=36:09:32 N 139:40:48 E DC 1 AC G AN Kerama AP AL GND AH 3000 FT AMSL V X=26:10:06 N 127:17:36 E DC 2 AC G AN Kinugawa GP 546FT AL GND AH 3000 FT AMSL V X=36:40:53 N 139:56:35 E DC 1 AC G AN Kirigamine GP 5511FT AL GND AH 7000 FT AMSL V X=36:05:39 N 138:09:54 E DC 1 AC G AN Kisarazu CTR-1 AL GND AH 1000 FT AMSL DP 35:27:59 N 139:57:56 E DP 35:24:57 N 139:48:51 E DP 35:25.3343 N 139:48:59 E DP 35:25:45 N 139:49:11 E DP 35:25:47 N 139:49:29 E V X=35:23:42 N 139:54:47 E DB 35:28:41 N 139:54:17 E,35:28.2014 N 139:57.4546 E DP 35:28.2014 N 139:57.4546 E DP 35:27:59 N 139:57:56 E AC G AN Kisarazu CTR-1 AL GND AH 1500 FT AMSL DP 35:26:56 N 139:59:28 E DP 35:23:19 N 139:48:40 E DP 35:23.6234 N 139:48:39 E DP 35:24.0702 N 139:48:40 E DP 35:24:31 N 139:48:44 E DP 35:24:57 N 139:48:51 E DP 35:27:59 N 139:57:56 E DP 35:27:50 N 139:58:15 E DP 35:27:34 N 139:58.6863 E DP 35:27:16 N 139:59:06 E DP 35:26:56 N 139:59:28 E AC G AN Kisarazu CTR-3 AL GND AH 2000 FT AMSL V X=35:23:42 N 139:54:47 E DB 35:26:56 N 139:59:28 E,35:23:19 N 139:48:40 E DP 35:23:19 N 139:48:40 E DP 35:26:56 N 139:59:28 E AC G AN Kisogawa GP 14FT AL GND AH 2000 FT AMSL V X=35:12:40 N 136:40:43 E DC 1 AC G AN KK-1-1 AL GND AH 4000 FT AMSL DP 38:16:04 N 139:35:26 E DP 38:14:32 N 139:38:07 E V D=- V X=37:57:30 N 139:06:54 E DB 38:01:23 N 139:31.7894 E,38:07:41 N 139:28:45 E DP 38:07:41 N 139:28:45 E DP 38:16:04 N 139:35:26 E AC G AN KK-1-2 AL GND AH 3000 FT AMSL DP 38:20:59 N 139:27:15 E DP 38:16:04 N 139:35:26 E DP 38:08:04 N 139:28:26 E DP 38:08:49 N 139:27:49 E DP 38:9.54123 N 139:27:09 E DP 38:10:15 N 139:26:27 E DP 38:10:44 N 139:25:54 E DP 38:20:59 N 139:27:15 E AC G AN KK-1-3 AL GND AH 3000 FT AMSL DP 38:28:05 N 139:15:18 E DP 38:20:59 N 139:27:15 E V D=- V X=37:57.5707 N 139:6.9178 E DB 38:10:44 N 139:25:54 E,38:17:18 N 139:10:12 E DP 38:17:18 N 139:10:12 E DP 38:26:00 N 139:11:33 E DP 38:28:05 N 139:15:18 E AC G AN KK-1-4 AL GND AH 3000 FT AMSL DP 38:26:00 N 139:11:33 E V D=- V X=37:57:30 N 139:06:54 E DB 38:17:18 N 139:10:12 E,38:17:27 N 139:5.65657 E DP 38:17:27 N 139:5.65657 E DP 38:17:25 N 139:05:20 E DP 38:24:56 N 139:09:18 E DP 38:26:00 N 139:11:33 E AC G AN KK-1-5 AL GND AH 4000 FT AMSL DP 38:24:56 N 139:09:18 E DP 38:17:25 N 139:05:20 E DP 38:17:22 N 139:04:12 E DP 38:17:15 N 139:3.06894 E DP 38:17.0884 N 139:01:57 E DP 38:16:57 N 139:01:08 E DP 38:19:44 N 138:58:09 E DP 38:24:56 N 139:09:18 E AC G AN KK-1-6 AL GND AH 3000 FT AMSL DP 38:19:44 N 138:58:09 E DP 38:16:56 N 139:01:09 E DP 38:16.7243 N 139:00:03 E DP 38:16:28 N 138:58.9556 E V D=- V X=37:57:30 N 139:06:54 E DB 38:16:28 N 138:58.9556 E,38:11:07 N 138:48:21 E DP 38:11:07 N 138:48:21 E DP 38:11:57 N 138:47.9212 E DP 38:12.7581 N 138:47:27 E DP 38:13.5533 N 138:46.9239 E DP 38:14:13 N 138:46:25 E DP 38:19:44 N 138:58:09 E AC G AN KK-2-1 AL GND AH 4000 FT AMSL DP 37:49:32 N 138:51:24 E DP 37:47:20 N 139:05:38 E DP 37:46:54 N 139:20:42 E DP 37:31:29 N 139:03:25 E DP 37:33:11 N 139:02:48 E DP 37:30:58 N 139:00:55 E DP 37:35:27 N 138:44:24 E DP 37:47:11 N 138:48:41 E DP 37:49:32 N 138:51:24 E AC G AN KK-2-2 AL GND AH 4000 FT AMSL DP 37:52:52 N 138:29:52 E DP 37:49:32 N 138:51:24 E DP 37:47:11 N 138:48:41 E DP 37:35:27 N 138:44:24 E DP 37:42:48 N 138:17:59 E DP 37:52:52 N 138:29:52 E AC G AN KK-2-3 AL GND AH 3000 FT AMSL DP 37:57:32 N 138:41:35 E DP 37:56.6399 N 138:41:35 E DP 37:55:45 N 138:41.6583 E V D=- V X=37:57:30 N 139:06:54 E DB 37:55:45 N 138:41.6583 E,37:50:49 N 138:43:02 E DP 37:50:49 N 138:43:02 E DP 37:52:52 N 138:29:52 E DP 37:55:04 N 138:31:54 E DP 37:57:32 N 138:41:35 E AC G AN KK-2-4 AL GND AH 1500 FT AMSL DP 37:57:52 N 138:15:18 E DP 37:56:58 N 138:15.1916 E DP 37:56:31 N 138:15:46 E V D=- V X=38:03:57 N 138:24:35 E DB 37:56:31 N 138:15:46 E,37:53:55 N 138:22:26 E DP 37:53:55 N 138:22:26 E DP 37:52:52 N 138:29:52 E DP 37:42:48 N 138:17:59 E DP 37:45:11 N 138:09:49 E DP 37:57:52 N 138:15:18 E AC G AN KK-3-1 AL GND AH 9000 FT AMSL DP 36:10:00 N 137:55:22 E V X=36:10:00 N 137:55:22 E DB 36:8.77167 N 137:43:05 E,36:11.2074 N 138:7.65611 E DP 36:11.2074 N 138:7.65611 E DP 36:10:00 N 137:55:22 E AC G AN KK-3-2 AL GND AH 9000 FT AMSL DP 36:10:00 N 137:55:22 E V X=36:10:00 N 137:55:22 E DB 36:11.2074 N 138:7.65611 E,36:8.77167 N 137:43:05 E DP 36:8.77167 N 137:43:05 E DP 36:10:00 N 137:55:22 E AC G AN KK-4-1 AL GND AH 2000 FT AMSL DP 36:09:11 N 139:20:48 E DP 36:09:12 N 139:21:32 E DP 36:04:42 N 139:31:05 E DP 36:00:11 N 139:36:51 E DP 35:59:29 N 139:37:21 E DP 35:58:35 N 139:37:29 E DP 35:56:41 N 139:37:23 E DP 35:55:34 N 139:31:48 E DP 35:58:12 N 139:30:48 E DP 36:09:11 N 139:20:48 E AC G AN KK-4-2 AL GND AH 2000 FT AMSL DP 36:03:46 N 139:32:17 E DP 36:05:23 N 139:33:34 E DP 36:07:03 N 139:35:35 E DP 36:08:22 N 139:36:39 E DP 36:07:23 N 139:37:52 E DP 36:06:25 N 139:38:19 E DP 36:04:42 N 139:39:13 E DP 36:03:39 N 139:39:13 E DP 36:02:15 N 139:39:48 E DP 35:59:17 N 139:37:47 E DP 35:58:35 N 139:37:29 E DP 35:59:29 N 139:37:21 E DP 36:00:11 N 139:36:51 E DP 36:03:46 N 139:32:17 E AC G AN KK-4-3 AL GND AH 2000 FT AMSL DP 36:13:33 N 139:34:34 E DP 36:09:54 N 139:35:22 E DP 36:08:22 N 139:36:39 E DP 36:07:03 N 139:35:35 E DP 36:05:23 N 139:33:34 E DP 36:03:46 N 139:32:17 E DP 36:04:42 N 139:31:05 E DP 36:09:12 N 139:21:32 E DP 36:09:11 N 139:20:48 E DP 36:09:24 N 139:20:13 E DP 36:13:33 N 139:34:34 E AC G AN KK-4-4 AL GND AH 2000 FT AMSL DP 35:59:46 N 139:52:47 E DP 35:56:41 N 139:37:23 E DP 35:58:35 N 139:37:31 E DP 35:59:17 N 139:37:47 E DP 36:02:15 N 139:39:48 E DP 36:04:01 N 139:40:41 E DP 36:07:59 N 139:43:07 E DP 36:07:44 N 139:45:21 E DP 36:05:29 N 139:48:05 E DP 36:03:48 N 139:48:41 E DP 36:01:42 N 139:51:37 E DP 35:59:46 N 139:52:47 E AC G AN KK-4-5 AL GND AH 2000 FT AMSL DP 36:07:59 N 139:43:07 E DP 36:04:01 N 139:40:41 E DP 36:02:15 N 139:39:48 E DP 36:03:39 N 139:39:13 E DP 36:04:42 N 139:39:13 E DP 36:06:25 N 139:38:19 E DP 36:07:23 N 139:37:52 E DP 36:08:22 N 139:36:39 E DP 36:09:54 N 139:35:22 E DP 36:12:32 N 139:34:48 E DP 36:12:35 N 139:35:18 E DP 36:11:28 N 139:36:52 E DP 36:09:13 N 139:41:52 E DP 36:08:03 N 139:42:39 E DP 36:07:59 N 139:43:07 E AC G AN KK-4-6 AL GND AH 2000 FT AMSL DP 36:13:33 N 139:34:34 E DP 36:17:24 N 139:47:54 E DP 36:13:07 N 139:45:19 E DP 36:07:59 N 139:43:07 E DP 36:08:03 N 139:42:39 E DP 36:09:13 N 139:41:52 E DP 36:11:28 N 139:36:52 E DP 36:12:35 N 139:35:18 E DP 36:12:32 N 139:34:48 E DP 36:13:33 N 139:34:34 E AC G AN KK-4-7 AL GND AH 2000 FT AMSL DP 36:10:56 N 139:59:00 E DP 36:01:12 N 139:58:48 E DP 35:59:46 N 139:52:47 E DP 36:01:42 N 139:51:37 E DP 36:03:48 N 139:48:41 E DP 36:05:29 N 139:48:05 E DP 36:07:44 N 139:45:21 E DP 36:07:59 N 139:43:07 E DP 36:10:26 N 139:44:11 E DP 36:11:18 N 139:56:00 E DP 36:10:56 N 139:59:00 E AC G AN KK-4-8 AL GND AH 2000 FT AMSL DP 36:20:11 N 139:56:48 E DP 36:19:11 N 139:58:48 E DP 36:10:56 N 139:59:00 E DP 36:11:18 N 139:56:00 E DP 36:10:26 N 139:44:11 E DP 36:13:07 N 139:45:19 E DP 36:17:24 N 139:47:54 E DP 36:20:11 N 139:56:48 E AC G AN KK-5-1 AL GND AH 1000 FT AMSL DP 35:42:12 N 140:53:48 E V X=35:46:56 N 140:21:47 E DB 35:40:07 N 141:05:17 E,35:11:49 N 140:31:27 E DP 35:11:49 N 140:31:27 E DP 35:16:20 N 140:28:40 E DP 35:42:12 N 140:53:48 E AC G AN KK-5-2 AL GND AH 2000 FT AMSL DP 35:16:20 N 140:28:40 E DP 35:11:49 N 140:31:27 E DP 35:09:27 N 140:32:47 E DP 34:58:15 N 140:32:16 E DP 35:08:12 N 140:20:48 E DP 35:16:20 N 140:28:40 E AC G AN KK-5-3 AL GND AH 3000 FT AMSL DP 35:40:07 N 141:05:17 E DP 35:30:12 N 141:59:48 E DP 34:34:12 N 140:59:48 E DP 34:58:15 N 140:32:16 E DP 35:09:27 N 140:32:47 E V D=- V X=35:46:56 N 140:21:48 E DB 35:11:49 N 140:31:27 E,35:40:07 N 141:05:17 E AC G AN Kobe-Shobo HELI AL GND AH 2000 FT AMSL V X=34:42:27 N 135:07:08 E DC 1 AC G AN Kohnan AP AL GND AH 3000 FT AMSL V X=34:35:29 N 133:56:00 E DC 2 AC G AN KS-11-1 AL GND AH 5000 FT AMSL DP 30:50:17 N 130:31:48 E DP 30:27:13 N 130:12:52 E DP 30:51:40 N 129:27:53 E DP 31:12:14 N 129:28:23 E DP 31:07:41 N 129:54:47 E DP 31:06:19 N 129:55:11 E DP 31:4.97133 N 129:55:43 E V D=- V X=31:21:23 N 130:50:55 E DB 31:4.97133 N 129:55:43 E,30:50:15 N 130:05:15 E DP 30:50:15 N 130:05:15 E DP 30:50:17 N 130:31:48 E AC G AN KS-11-2 AL GND AH 5000 FT AMSL DP 31:07:41 N 129:54:47 E DP 30:59:46 N 130:39:38 E DP 30:50:17 N 130:31:48 E V X=31:21:23 N 130:50:55 E DB 30:50:15 N 130:05:15 E,31:06:21 N 129:55.1687 E DP 31:06:21 N 129:55.1687 E DP 31:07:41 N 129:54:47 E AC G AN KS-1-1-30 AL GND AH 3000 FT AMSL DP 32:57:47 N 130:13:25 E DP 32:56:36 N 130:22:02 E DP 32:50:16 N 130:22:41 E DP 32:49:03 N 130:21:40 E DP 32:51:22 N 130:20:25 E DP 32:57:47 N 130:13:25 E AC G AN KS-1-1-50 AL 3000 FT AMSL AH 5000 FT AMSL DP 32:57:47 N 130:13:25 E DP 32:56:36 N 130:22:02 E DP 32:50:16 N 130:22:41 E DP 32:49:03 N 130:21:40 E DP 32:51:22 N 130:20:25 E DP 32:57:47 N 130:13:25 E AC G AN KS-12 AL GND AH 4000 FT AMSL DP 31:45:03 N 130:11:22 E DP 31:44:04 N 130:26:54 E DP 31:24:59 N 130:19:24 E DP 31:24:33 N 130:06:30 E DP 31:45:03 N 130:11:22 E AC G AN KS-1-2-30 AL GND AH 3000 FT AMSL DP 32:56:36 N 130:22:02 E DP 32:56:09 N 130:25:14 E DP 32:52:55 N 130:29:27 E DP 32:50:43 N 130:28:59 E DP 32:47:06 N 130:22:44 E DP 32:49:03 N 130:21:40 E DP 32:50:16 N 130:22:41 E DP 32:56:36 N 130:22:02 E AC G AN KS-1-2-50 AL 3000 FT AMSL AH 5000 FT AMSL DP 32:56:36 N 130:22:02 E DP 32:56:09 N 130:25:14 E DP 32:52:55 N 130:29:27 E DP 32:50:43 N 130:28:59 E DP 32:47:06 N 130:22:44 E DP 32:49:03 N 130:21:40 E DP 32:50:16 N 130:22:41 E DP 32:56:36 N 130:22:02 E AC G AN KS-13-1 AL GND AH 5000 FT AMSL V X=31:47:24 N 129:47:12 E DB 31:59:46 N 129:34:52 E,31:34.7554 N 129:35.2908 E DP 31:34.7554 N 129:35.2908 E DP 31:35:03 N 129:34:54 E DP 31:59:46 N 129:34:52 E AC G AN KS-13-2 AL 5000 FT AMSL AH 10000 FT AMSL V X=31:47:24 N 129:47:12 E DB 31:59:46 N 129:34:52 E,31:34.7554 N 129:35.2908 E DP 31:34.7554 N 129:35.2908 E DP 31:35:03 N 129:34:54 E DP 31:59:46 N 129:34:52 E AC G AN KS-13-3 AL 10000 FT AMSL AH FL150 V X=31:47:24 N 129:47:12 E DB 31:59:46 N 129:34:52 E,31:34.7554 N 129:35.2908 E DP 31:34.7554 N 129:35.2908 E DP 31:35:03 N 129:34:54 E DP 31:59:46 N 129:34:52 E AC G AN KS-1-3-30 AL GND AH 3000 FT AMSL DP 32:50:43 N 130:28:59 E DP 32:39:55 N 130:26:44 E DP 32:45:18 N 130:22:30 E DP 32:47:06 N 130:22:44 E DP 32:50:43 N 130:28:59 E AC G AN KS-1-3-50 AL 3000 FT AMSL AH 5000 FT AMSL DP 32:50:43 N 130:28:59 E DP 32:39:55 N 130:26:44 E DP 32:45:18 N 130:22:30 E DP 32:47:06 N 130:22:44 E DP 32:50:43 N 130:28:59 E AC G AN KS-14-1 AL GND AH 3000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:35:12 N 129:52:52 E DP 32:10:12 N 130:05:52 E DP 32:10:12 N 129:34:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-14-2 AL 3000 FT AMSL AH 8000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:35:12 N 129:52:52 E DP 32:10:12 N 130:05:52 E DP 32:10:12 N 129:34:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-14-3 AL 8000 FT AMSL AH 12000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:35:12 N 129:52:52 E DP 32:10:12 N 130:05:52 E DP 32:10:12 N 129:34:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-1-4-30 AL GND AH 3000 FT AMSL DP 32:45:18 N 130:22:30 E DP 32:39:55 N 130:26:44 E DP 32:37:25 N 130:26:13 E DP 32:35:14 N 130:23:20 E DP 32:39:46 N 130:19:44 E DP 32:40:53 N 130:21:59 E DP 32:45:18 N 130:22:30 E AC G AN KS-14-4 AL GND AH 3000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:10:12 N 129:34:52 E DP 32:10:12 N 129:14:52 E DP 32:35:12 N 129:14:52 E DP 32:35:12 N 129:38:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-14-5 AL 3000 FT AMSL AH 8000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:10:12 N 129:34:52 E DP 32:10:12 N 129:14:52 E DP 32:35:12 N 129:14:52 E DP 32:35:12 N 129:38:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-1-4-50 AL 3000 FT AMSL AH 5000 FT AMSL DP 32:45:18 N 130:22:30 E DP 32:39:55 N 130:26:44 E DP 32:37:25 N 130:26:13 E DP 32:35:14 N 130:23:20 E DP 32:39:46 N 130:19:44 E DP 32:40:53 N 130:21:59 E DP 32:45:18 N 130:22:30 E AC G AN KS-14-6 AL 8000 FT AMSL AH 12000 FT AMSL DP 32:40:12 N 129:47:52 E DP 32:10:12 N 129:34:52 E DP 32:10:12 N 129:14:52 E DP 32:35:12 N 129:14:52 E DP 32:35:12 N 129:38:52 E DP 32:40:12 N 129:47:52 E AC G AN KS-15 AL GND AH 5000 FT AMSL DP 33:17:12 N 129:07:52 E DP 33:11:12 N 129:25:52 E DP 33:03:57 N 129:25:52 E V D=- V X=33:00:43 N 129:11:25 E DB 33:08:36 N 129:18:46 E,33:8.58596 N 129:04:03 E DP 33:8.58596 N 129:04:03 E DP 33:08:21 N 129:03:43 E DP 33:17:12 N 129:07:52 E AC G AN KS-21 AL GND AH 5000 FT AMSL DP 28:30:14 N 130:29:52 E DP 28:10:14 N 130:29:52 E DP 27:57:14 N 129:53:52 E DP 28:04:14 N 129:53:52 E DP 28:08:14 N 129:59:52 E DP 28:30:14 N 130:29:52 E AC G AN KS-2A AL GND AH 2000 FT AMSL DP 33:52:12 N 132:15:51 E DP 33:31:12 N 132:22:51 E DP 33:30:22 N 132:20:46 E DP 33:30:37 N 132:20.602 E DP 33:30:50 N 132:20.386 E V D=- V X=33:29:27 N 132:18:39 E DB 33:30:50 N 132:20.386 E,33:31:23 N 132:19:16 E V X=33:29:29 N 132:18:31 E DB 33:31:23 N 132:19:16 E,33:29:35 N 132:16.1212 E DP 33:29:35 N 132:16.1212 E DP 33:29:28 N 132:16:08 E DP 33:29.1853 N 132:16:09 E DP 33:28:55 N 132:16:13 E DP 33:28:39 N 132:16:20 E DP 33:28:36 N 132:16:21 E DP 33:25:12 N 132:07:51 E DP 33:47:12 N 132:01:51 E DP 33:52:12 N 132:15:51 E AC G AN KS-2B AL 2000 FT AMSL AH 2500 FT AMSL DP 33:30:22 N 132:20:46 E V X=33:29:26 N 132:18:29 E DB 33:28:36 N 132:16:21 E,33:29:28 N 132:16:08 E DP 33:29:28 N 132:16:08 E DP 33:29:35 N 132:16.1212 E DP 33:29:52 N 132:16:10 E V X=33:29:29 N 132:18:31 E DB 33:29:52 N 132:16:10 E,33:31:23 N 132:19:16 E V X=33:29:27 N 132:18:39 E DB 33:31:23 N 132:19:16 E,33:30:37 N 132:20.602 E DP 33:30:37 N 132:20.602 E DP 33:30:22 N 132:20:46 E AC G AN KS-3-1 AL GND AH 2500 FT AMSL DP 33:05:12 N 131:52:51 E DP 33:09:04 N 132:16:42 E DP 33:08:29 N 132:17:15 E DP 33:07:51 N 132:17:42 E V X=33:01:17 N 132:03:17 E DB 33:07:51 N 132:17:42 E,32:52:10 N 131:51:02 E DP 32:52:10 N 131:51:02 E DP 33:05:12 N 131:52:51 E AC G AN KS-3-2 AL GND AH 8000 FT AMSL DP 33:17:12 N 133:06:51 E DP 32:58:12 N 132:54:51 E DP 33:10:12 N 132:21:51 E DP 33:12:12 N 132:37:51 E DP 33:13:12 N 132:42:51 E DP 33:14:12 N 132:47:51 E DP 33:17:12 N 133:06:51 E AC G AN KS-3-3A AL GND AH 2500 FT AMSL DP 33:10:12 N 132:21:51 E DP 32:58:12 N 132:54:51 E DP 32:52:12 N 132:50:51 E DP 32:44:12 N 132:30:51 E V D=- V X=33:01:17 N 132:03:17 E DB 32:50:30 N 132:13:19 E,33:08:27 N 132:17:12 E DP 33:08:27 N 132:17:12 E DP 33:09:04 N 132:16:42 E DP 33:10:12 N 132:21:51 E AC G AN KS-3-3B AL 2500 FT AMSL AH 5000 FT AMSL DP 33:09:04 N 132:16:42 E DP 33:8.45237 N 132:17.1912 E DP 33:07:49 N 132:17:38 E V X=33:01:17 N 132:03:17 E DB 33:07:49 N 132:17:38 E,32:50:30 N 132:13:19 E DP 32:50:30 N 132:13:19 E DP 32:58:12 N 131:51:51 E DP 33:05:12 N 131:52:51 E DP 33:09:04 N 132:16:42 E AC G AN KS-3-4-10 AL 5000 FT AMSL AH 10000 FT AMSL DP 32:58:12 N 131:51:51 E DP 32:44:12 N 132:30:51 E DP 32:32:12 N 132:05:51 E DP 32:26:12 N 131:46:51 E DP 32:52:10 N 131:51:02 E DP 32:58:12 N 131:51:51 E AC G AN KS-3-4-15 AL 10000 FT AMSL AH FL150 DP 32:58:12 N 131:51:51 E DP 32:44:12 N 132:30:51 E DP 32:32:12 N 132:05:51 E DP 32:26:12 N 131:46:51 E DP 32:52:10 N 131:51:02 E DP 32:58:12 N 131:51:51 E AC G AN KS-3-4-5A AL GND AH 2500 FT AMSL DP 32:50:30 N 132:13:19 E DP 32:44:12 N 132:30:51 E DP 32:32:12 N 132:05:51 E DP 32:26:12 N 131:46:51 E V D=- V X=33:01:17 N 132:03:17 E DB 32:52:10 N 131:51:02 E,32:50:01 N 132:12.6521 E DP 32:50:01 N 132:12.6521 E DP 32:50:30 N 132:13:19 E AC G AN KS-3-4-5B AL 2500 FT AMSL AH 5000 FT AMSL DP 32:58:12 N 131:51:51 E DP 32:44:12 N 132:30:51 E DP 32:32:12 N 132:05:51 E DP 32:26:12 N 131:46:51 E DP 32:52:10 N 131:51:02 E DP 32:58:12 N 131:51:51 E AC G AN KS-4-1-60 AL 5500 FT AMSL AH 6000 FT AMSL DP 32:01:11 N 131:19:58 E DP 31:59:27 N 131:27:28 E DP 31:59:20 N 131:35:03 E DP 31:58.8743 N 131:35:34 E DP 31:58:22 N 131:36.0023 E V X=31:52.7235 N 131:26:15 E DB 31:58:22 N 131:36.0023 E,31:43:00 N 131:23:25 E DP 31:43:00 N 131:23:25 E DP 31:41:39 N 131:23:01 E DP 31:46:46 N 131:12:00 E DP 31:48:19 N 131:15:42 E DP 31:48.8864 N 131:15:23 E DP 31:49:29 N 131:15:07 E V X=31:52.7231 N 131:26:15 E DB 31:49:29 N 131:15:07 E,32:01:11 N 131:19:58 E AC G AN KS-4-1-65 AL 6000 FT AMSL AH 6500 FT AMSL DP 32:01:11 N 131:19:58 E DP 31:59:27 N 131:27:28 E DP 31:59:20 N 131:35:03 E DP 31:58.8743 N 131:35:34 E DP 31:58:22 N 131:36.0023 E V X=31:52.7235 N 131:26:15 E DB 31:58:22 N 131:36.0023 E,31:43:00 N 131:23:25 E DP 31:43:00 N 131:23:25 E DP 31:41:39 N 131:23:01 E DP 31:46:46 N 131:12:00 E DP 31:48:19 N 131:15:42 E DP 31:48.8864 N 131:15:23 E DP 31:49:29 N 131:15:07 E V X=31:52.7231 N 131:26:15 E DB 31:49:29 N 131:15:07 E,32:01:11 N 131:19:58 E AC G AN KS-4-1-70 AL 6500 FT AMSL AH 7000 FT AMSL DP 32:01:11 N 131:19:58 E DP 31:59:27 N 131:27:28 E DP 31:59:20 N 131:35:03 E DP 31:58.8743 N 131:35:34 E DP 31:58:22 N 131:36.0023 E V X=31:52.7235 N 131:26:15 E DB 31:58:22 N 131:36.0023 E,31:43:00 N 131:23:25 E DP 31:43:00 N 131:23:25 E DP 31:41:39 N 131:23:01 E DP 31:46:46 N 131:12:00 E DP 31:48:19 N 131:15:42 E DP 31:48.8864 N 131:15:23 E DP 31:49:29 N 131:15:07 E V X=31:52.7231 N 131:26:15 E DB 31:49:29 N 131:15:07 E,32:01:11 N 131:19:58 E AC G AN KS-4-2-20 AL GND AH 2000 FT AMSL DP 31:44:37 N 131:33:08 E DP 31:36:29 N 131:40:00 E DP 31:35:58 N 131:39:09 E DP 31:35.4884 N 131:38.2553 E V X=31:52.7244 N 131:26:15 E DB 31:35.4884 N 131:38.2553 E,31:33:52 N 131:34:12 E DP 31:33:52 N 131:34:12 E DP 31:35:03 N 131:34:04 E DP 31:32:23 N 131:20:20 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:43:00 N 131:23:25 E,31:44:20 N 131:32.6873 E DP 31:44:20 N 131:32.6873 E DP 31:44:37 N 131:33:08 E AC G AN KS-4-2-35 AL 2000 FT AMSL AH 3500 FT AMSL DP 31:44:37 N 131:33:08 E DP 31:36:29 N 131:40:00 E DP 31:35:58 N 131:39:09 E DP 31:35.4884 N 131:38.2553 E V X=31:52.7244 N 131:26:15 E DB 31:35.4884 N 131:38.2553 E,31:33:52 N 131:34:12 E DP 31:33:52 N 131:34:12 E DP 31:35:03 N 131:34:04 E DP 31:32:23 N 131:20:20 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:43:00 N 131:23:25 E,31:44:20 N 131:32.6873 E DP 31:44:20 N 131:32.6873 E DP 31:44:37 N 131:33:08 E AC G AN KS-4-2-50 AL 3500 FT AMSL AH 5000 FT AMSL DP 31:44:37 N 131:33:08 E DP 31:36:29 N 131:40:00 E DP 31:35:58 N 131:39:09 E DP 31:35.4884 N 131:38.2553 E V X=31:52.7244 N 131:26:15 E DB 31:35.4884 N 131:38.2553 E,31:33:52 N 131:34:12 E DP 31:33:52 N 131:34:12 E DP 31:35:03 N 131:34:04 E DP 31:32:23 N 131:20:20 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:43:00 N 131:23:25 E,31:44:20 N 131:32.6873 E DP 31:44:20 N 131:32.6873 E DP 31:44:37 N 131:33:08 E AC G AN KS-4-3-30 AL GND AH 3000 FT AMSL DP 32:04:46 N 130:59:25 E DP 32:04:38 N 131:04:22 E V D=- V X=31:52.7233 N 131:26:15 E DB 32:01:11 N 131:19:58 E,31:48:25 N 131:15:38 E DP 31:48:25 N 131:15:38 E DP 31:48:19 N 131:15:42 E DP 31:46:46 N 131:12:00 E DP 31:51:08 N 131:02:34 E DP 31:57:36 N 131:03:19 E DP 31:59:40 N 130:58:50 E DP 32:04:46 N 130:59:25 E AC G AN KS-4-3-45 AL 3000 FT AMSL AH 4500 FT AMSL DP 32:04:46 N 130:59:25 E DP 32:04:38 N 131:04:22 E V D=- V X=31:52.7233 N 131:26:15 E DB 32:01:11 N 131:19:58 E,31:48:25 N 131:15:38 E DP 31:48:25 N 131:15:38 E DP 31:48:19 N 131:15:42 E DP 31:46:46 N 131:12:00 E DP 31:51:08 N 131:02:34 E DP 31:57:36 N 131:03:19 E DP 31:59:40 N 130:58:50 E DP 32:04:46 N 130:59:25 E AC G AN KS-4-4 AL GND AH 2000 FT AMSL DP 32:01:11 N 131:19:58 E DP 32:00:48 N 131:21:37 E DP 31:59:01 N 131:22:38 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:59:01 N 131:22:38 E,31:56.1559 N 131:19:04 E DP 31:56.1559 N 131:19:04 E DP 31:56:06 N 131:19:03 E DP 31:57:34 N 131:15:58 E DP 31:58.1185 N 131:16:20 E DP 31:58.6399 N 131:16:45 E V D=+ V X=31:52.7232 N 131:26:15 E DB 31:58.6399 N 131:16:45 E,32:01:11 N 131:19:58 E AC G AN KS-4-5-30 AL GND AH 3000 FT AMSL DP 32:12:12 N 130:45:34 E DP 32:11:17 N 131:02:02 E DP 32:08:16 N 130:59:50 E DP 31:59:40 N 130:58:50 E DP 31:57:36 N 131:03:19 E DP 31:51:08 N 131:02:34 E DP 31:50:26 N 130:58:32 E DP 31:51.141 N 130:58.3711 E DP 31:51:50 N 130:58.1346 E V D=- V X=31:47:51 N 130:43:33 E DB 31:51:50 N 130:58.1346 E,32:00:50 N 130:44:38 E DP 32:00:50 N 130:44:38 E DP 32:12:12 N 130:45:34 E AC G AN KS-4-5-45 AL 3000 FT AMSL AH 4500 FT AMSL DP 32:12:12 N 130:45:34 E DP 32:11:17 N 131:02:02 E DP 32:08:16 N 130:59:50 E DP 31:59:40 N 130:58:50 E DP 31:57:36 N 131:03:19 E DP 31:51:08 N 131:02:34 E DP 31:50:26 N 130:58:32 E DP 31:51.141 N 130:58.3711 E DP 31:51:50 N 130:58.1346 E V D=- V X=31:47:51 N 130:43:33 E DB 31:51:50 N 130:58.1346 E,32:00:50 N 130:44:38 E DP 32:00:50 N 130:44:38 E DP 32:12:12 N 130:45:34 E AC G AN KS-4-5-60 AL 4500 FT AMSL AH 6000 FT AMSL DP 32:12:12 N 130:45:34 E DP 32:11:17 N 131:02:02 E DP 32:08:16 N 130:59:50 E DP 31:59:40 N 130:58:50 E DP 31:57:36 N 131:03:19 E DP 31:51:08 N 131:02:34 E DP 31:50:26 N 130:58:32 E DP 31:51.141 N 130:58.3711 E DP 31:51:50 N 130:58.1346 E V D=- V X=31:47:51 N 130:43:33 E DB 31:51:50 N 130:58.1346 E,32:00:50 N 130:44:38 E DP 32:00:50 N 130:44:38 E DP 32:12:12 N 130:45:34 E AC G AN KS-4-6 AL GND AH 2000 FT AMSL DP 31:45:07 N 130:58:29 E DP 31:38:54 N 131:10:57 E DP 31:37.9719 N 131:10:31 E DP 31:37:04 N 131:10:02 E DP 31:36.1717 N 131:09:30 E DP 31:35:18 N 131:08:56 E DP 31:35:17 N 131:08:55 E V D=- V X=31:47:51 N 130:43:33 E DB 31:41:19 N 130:56:46 E,31:44.6412 N 130:58.3687 E DP 31:44.6412 N 130:58.3687 E DP 31:45:07 N 130:58:29 E AC G AN KS-4-7-20 AL GND AH 2000 FT AMSL DP 31:51:08 N 131:02:34 E DP 31:46:22 N 131:12:51 E DP 31:45.3701 N 131:12.7727 E DP 31:44:23 N 131:12:38 E V X=31:47:51 N 130:43:33 E DB 31:44:23 N 131:12:38 E,31:38:54 N 131:10:57 E DP 31:38:54 N 131:10:57 E DP 31:45:07 N 130:58:29 E DP 31:45.8238 N 130:58:39 E DP 31:46.5383 N 130:58.7552 E V D=- V X=31:47:51 N 130:43:33 E DB 31:46.5383 N 130:58.7552 E,31:50:26 N 130:58:32 E DP 31:50:26 N 130:58:32 E DP 31:51:08 N 131:02:34 E AC G AN KS-4-7-40 AL 2000 FT AMSL AH 4000 FT AMSL DP 31:51:08 N 131:02:34 E DP 31:46:22 N 131:12:51 E DP 31:45.3701 N 131:12.7727 E DP 31:44:23 N 131:12:38 E V X=31:47:51 N 130:43:33 E DB 31:44:23 N 131:12:38 E,31:38:54 N 131:10:57 E DP 31:38:54 N 131:10:57 E DP 31:45:07 N 130:58:29 E DP 31:45.8238 N 130:58:39 E DP 31:46.5383 N 130:58.7552 E V D=- V X=31:47:51 N 130:43:33 E DB 31:46.5383 N 130:58.7552 E,31:50:26 N 130:58:32 E DP 31:50:26 N 130:58:32 E DP 31:51:08 N 131:02:34 E AC G AN KS-4-8 AL GND AH 5000 FT AMSL DP 31:46:22 N 131:12:51 E DP 31:41:39 N 131:23:01 E DP 31:32:23 N 131:20:20 E DP 31:31:35 N 131:16:19 E V D=- V X=31:47:51 N 130:43:33 E DB 31:35:17 N 131:08:55 E,31:45.668 N 131:12.818 E DP 31:45.668 N 131:12.818 E DP 31:46:22 N 131:12:51 E AC G AN Kuju GP 2625FT AL GND AH 4000 FT AMSL V X=33:02:14 N 131:13:55 E DC 1 AC G AN Kyoto-Fu HELI AL GND AH 2000 FT AMSL V X=34:53:47 N 135:45:22 E DC 1 AC G AN Kyoto-Shobo HELI AL GND AH 2000 FT AMSL V X=34:55:07 N 135:44:19 E DC 1 AC G AN Maishima HELI AL GND AH 2000 FT AMSL V X=34:40:22 N 135:24:09 E DC 1 AC G AN Makabe-Sakuragawa GP 90FT AL GND AH 3000 FT AMSL V X=36:15:55 N 140:04:15 E DC 1 AC G AN Makurazaki HELI AL GND AH 2000 FT AMSL V X=31:16:06 N 130:21:28 E DC 1 AC G AN Menuma GP 89FT AL GND AH 2000 FT AMSL V X=36:12:41 N 139:25:08 E DC 1 AC G AN Mikamo HELI AL GND AH 2000 FT AMSL V X=36:19:10 N 139:37:19 E DC 1 AC G AN Minamitorishima AP AL GND AH 3000 FT AMSL V X=24:17:23 N 153:58:45 E DC 2 AC G AN Nagano GP 1116FT AL GND AH 3000 FT AMSL V X=36:38:00 N 138:15:22 E DC 1 AC G AN Naraken HELI AL GND AH 2000 FT AMSL V X=34:39:23 N 135:53:05 E DC 1 AC G AN Nirasaki GP 1067FT AL GND AH 2000 FT AMSL V X=35:41:21 N 138:28:00 E DC 1 AC G AN Niseko HELI AL GND AH 2000 FT AMSL V X=42:49:58 N 140:40:19 E DC 1 AC G AN Nishinihon HELI AL GND AH 2000 FT AMSL V X=33:35:19 N 130:24:05 E DC 1 AC G AN Ohno GP 80FT AL GND AH 2000 FT AMSL V X=35:26:51 N 136:36:19 E DC 1 AC G AN Oitakenou AP AL GND AH 3000 FT AMSL V X=33:01:34 N 131:30:20 E DC 2 AC G AN Ojika AP AL GND AH 3000 FT AMSL V X=33:11:27 N 129:05:25 E DC 2 AC G AN Okazaki GP AL GND AH 2000 FT AMSL V X=34:56:42 N 137:08:47 E DC 1 AC G AN Okk-Hino HELI AL GND AH 2000 FT AMSL V X=35:03:25 N 136:14:48 E DC 1 AC G AN Okushiri AP AL GND AH 3000 FT AMSL V X=42:04:18 N 139:25:58 E DC 2 AC G AN Otone AP AL GND AH 1500 FT AMSL V X=35:51:36 N 140:14:20 E DC 2 AC G AN Oyamakinu GP 108FT AL GND AH 2000 FT AMSL V X=36:17:59 N 139:54:18 E DC 1 AC G AN Rebun AP AL GND AH 3000 FT AMSL V X=45:27:18 N 141:02:21 E DC 2 AC G AN Ryugasaki AP AL GND AH 1500 FT AMSL V X=35:54:22 N 140:14:29 E DC 2 AC G AN Sado AP AL GND AH 3000 FT AMSL V X=38:03:40 N 138:24:51 E DC 2 AC G AN SBS-Numazu HELI AL GND AH 2000 FT AMSL V X=35:05:46 N 138:51:29 E DC 1 AC G AN SBS-Shizuoka HELI AL GND AH 2000 FT AMSL V X=34:57:37 N 138:24:20 E DC 1 AC G AN Sekiyado GP 28FT AL GND AH 2000 FT AMSL V X=36:00:57 N 139:49:00 E DC 1 AC G AN Shibaura HELI AL GND AH 2000 FT AMSL V X=35:38:12 N 139:45:08 E DC 1 AC G AN Shikabe AP AL GND AH 3000 FT AMSL V X=42:02:42 N 140:47:36 E DC 2 AC G AN Shinshinotsu GP 40FT AL GND AH 2000 FT AMSL V X=43:16:27 N 141:39:09 E DC 1 AC G AN Shirakawa GP 10FT AL GND AH 2000 FT AMSL V X=32:46:32 N 130:38:05 E DC 1 AC G AN Shizuoka HELI AL GND AH 2000 FT AMSL V X=35:01:28 N 138:24:31 E DC 1 AC G AN Skyport-Kitami GP 609FT AL GND AH 3000 FT AMSL V X=43:46:48 N 143:43:51 E DC 1 AC G AN SM-1-1 AL 7000 FT AMSL AH FL250 DP 25:53:44 N 125:26:49 E DP 25:21:58 N 125:22:36 E DP 25:22.139 N 125:21.3029 E DP 25:22.2181 N 125:20:00 E V D=- V X=24:47:10 N 125:18:04 E DB 25:22.2181 N 125:20:00 E,25:03:02 N 124:43:33 E DP 25:03:02 N 124:43:33 E V D=+ V X=24:47:10 N 125:18:04 E DB 25:17:29 N 124:12:01 E,25:53.9234 N 125:25.3844 E DP 25:53.9234 N 125:25.3844 E DP 25:53:44 N 125:26:49 E AC G AN SM-2 AL 7000 FT AMSL AH FL200 DP 24:21:41 N 125:44:18 E DP 24:03:27 N 126:03:03 E DP 23:45:30 N 125:54:13 E DP 23:44:41 N 125:52.6239 E DP 23:43:57 N 125:50:59 E V X=24:47:10 N 125:18:04 E DB 23:43:57 N 125:50:59 E,23:40:13 N 124:55:44 E DP 23:40:13 N 124:55:44 E DP 24:13:43 N 125:06:50 E DP 24:21:41 N 125:44:18 E AC G AN Tajima AP AL GND AH 3000 FT AMSL V X=35:30:46 N 134:47:13 E DC 2 AC G AN Takasaki HELI AL GND AH 2000 FT AMSL V X=36:19:29 N 138:59:37 E DC 1 AC G AN Takikawa GP 75FT AL GND AH 2000 FT AMSL V X=43:32:58 N 141:53:39 E DC 1 AC G AN Tateyama HELI AL GND AH 2000 FT AMSL V X=34:59:15 N 139:49:55 E DC 1 AC G AN TH-11 AL GND AH 8000 FT AMSL DP 37:54:05 N 140:28:43 E DP 37:32:21 N 140:23:45 E DP 37:32.3009 N 140:22:39 E DP 37:32:09 N 140:21:34 E V D=- V X=37:13:28 N 140:26:14 E DB 37:32:09 N 140:21:34 E,37:30:05 N 140:14:31 E DP 37:30:05 N 140:14:31 E DP 37:30.9899 N 140:13:09 E DP 37:31.9417 N 140:11:50 E DP 37:32.9223 N 140:10:33 E DP 37:33:56 N 140:09:18 E DP 37:34:39 N 140:08:27 E DP 37:54:05 N 140:07:55 E DP 37:54:05 N 140:28:43 E AC G AN TH-1-1 AL GND AH 10000 FT AMSL DP 41:00:19 N 140:09:34 E DP 40:40:20 N 140:09:36 E DP 40:40:20 N 139:44:38 E DP 41:00:19 N 139:51:52 E DP 41:00:19 N 140:09:34 E AC G AN TH-1-2 AL 10000 FT AMSL AH FL150 DP 41:00:19 N 140:09:34 E DP 40:40:20 N 140:09:36 E DP 40:40:20 N 139:44:38 E DP 41:00:19 N 139:51:52 E DP 41:00:19 N 140:09:34 E AC G AN TH-12-1 AL GND AH 4000 FT AMSL DP 37:50:46 N 141:04:30 E V X=38:08:18 N 140:55:17 E DB 37:43:23 N 141:08:22 E,37:41:46 N 140:49.2188 E DP 37:41:46 N 140:49.2188 E DP 37:41:58 N 140:47:56 E V D=- V X=38:8.28877 N 140:55:17 E DB 37:49:46 N 140:50:06 E,37:50:46 N 141:04:30 E AC G AN TH-12-2 AL GND AH 4000 FT AMSL DP 37:43:23 N 141:08:22 E V X=38:08:02 N 140:55.3342 E DB 37:33:13 N 141:13:39 E,37:30:31 N 140:59:55 E DP 37:30:31 N 140:59:55 E V D=- V X=38:08:18 N 140:55:17 E DB 37:41:27 N 140:58:35 E,37:43:00 N 141:07:09 E DP 37:43:00 N 141:07:09 E DP 37:43:23 N 141:08:22 E AC G AN TH-12-3 AL GND AH 4000 FT AMSL DP 37:41:27 N 140:58:35 E V X=38:08:18 N 140:55:17 E DB 37:30:31 N 140:59:55 E,37:30:59 N 140:46.4866 E DP 37:30:59 N 140:46.4866 E DP 37:31:14 N 140:44:58 E DP 37:41:58 N 140:47:56 E DP 37:41.9188 N 140:48:09 E DP 37:41.722 N 140:49:26 E V D=- V X=38:08:18 N 140:55:17 E DB 37:41.722 N 140:49:26 E,37:41:27 N 140:58:35 E AC G AN TH-1-3 AL FL150 AH FL200 DP 41:00:19 N 140:09:34 E DP 40:40:20 N 140:09:36 E DP 40:40:20 N 139:44:38 E DP 41:00:19 N 139:51:52 E DP 41:00:19 N 140:09:34 E AC G AN TH-13-1A AL GND AH 4000 FT AMSL DP 37:16:53 N 141:01:10 E DP 37:06:30 N 141:00:00 E V X=37:08:57 N 140:58.5243 E DB 36:58:53 N 140:58:15 E,37:18:14 N 140:53:45 E DP 37:18:14 N 140:53:45 E DP 37:18.2189 N 140:55.5042 E DP 37:18:15 N 140:57:17 E DP 37:18:26 N 140:59:03 E DP 37:18:16 N 140:59.1019 E DP 37:18:00 N 140:59:14 E V D=- V X=37:18:52 N 141:01:30 E DB 37:18:00 N 140:59:14 E,37:16:53 N 141:01:10 E AC G AN TH-13-1B AL 2000 FT AMSL AH 4000 FT AMSL DP 37:18:35 N 141:01:29 E V X=37:18:52 N 141:01:30 E DB 37:16:53 N 141:01:10 E,37:18:10 N 140:59:09 E DP 37:18:10 N 140:59:09 E DP 37:18:26 N 140:59:03 E DP 37:18:28 N 140:59:43 E DP 37:18:35 N 141:01:29 E AC G AN TH-13-2A AL GND AH 4000 FT AMSL DP 36:58:53 N 140:58:15 E DP 37:06:30 N 141:00:00 E DP 37:16:53 N 141:01:10 E DP 37:16:53 N 141:1.20683 E DP 37:16:52 N 141:01:34 E V D=- V X=37:18:52 N 141:01:30 E DB 37:16:52 N 141:01:34 E,37:18:53 N 141:04:01 E DP 37:18:53 N 141:04:01 E DP 37:19:01 N 141:04:02 E DP 37:23:47 N 141:10:18 E DP 37:08:26 N 141:11:04 E DP 37:8.12052 N 141:11.1028 E DP 37:7.49078 N 141:11:01 E V D=+ V X=37:08:56 N 140:58:32 E DB 37:7.49078 N 141:11:01 E,36:58:53 N 140:58:15 E AC G AN TH-13-2B AL 2000 FT AMSL AH 4000 FT AMSL V X=37:18:52 N 141:01:30 E DB 37:18:49 N 141:04:01 E,37:16:53 N 141:01:10 E DP 37:16:53 N 141:01:10 E DP 37:18:35 N 141:01:29 E DP 37:18:39 N 141:2.25354 E DP 37:18:49 N 141:04:01 E AC G AN TH-13-3 AL GND AH FL140 DP 37:53:59 N 141:48:23 E DP 37:45:47 N 141:58:41 E DP 37:08:26 N 141:11:04 E DP 37:23:47 N 141:10:18 E DP 37:53:59 N 141:48:23 E AC G AN TH-2-1 AL GND AH 3500 FT AMSL DP 40:30:10 N 140:29:48 E V D=- V X=40:11:54 N 140:21:42 E DB 40:24:27 N 140:29:48 E,40:10:20 N 140:3.50629 E DP 40:10:20 N 140:3.50629 E DP 40:10:10 N 140:03:32 E DP 40:10:10 N 139:39:48 E DP 40:30:10 N 139:49:48 E DP 40:30:10 N 140:29:48 E AC G AN TH-2-2 AL GND AH 3500 FT AMSL DP 39:59:21 N 140:29:48 E DP 39:42:10 N 140:29:48 E DP 39:42:10 N 139:39:48 E DP 40:10:10 N 139:39:48 E DP 40:10:10 N 140:03:32 E DP 40:09:26 N 140:3.66966 E DP 40:08:42 N 140:3.86988 E V D=- V X=40:11:54 N 140:21:42 E DB 40:08:42 N 140:3.86988 E,39:59:21 N 140:29:48 E AC G AN TH-2-3 AL GND AH 3500 FT AMSL DP 39:42:10 N 140:29:48 E DP 39:20:10 N 140:29:48 E DP 39:20:10 N 139:39:48 E DP 39:42:10 N 139:39:48 E DP 39:42:10 N 140:13:11 E V D=- V X=39:36:56 N 140:13:07 E DB 39:41:56 N 140:13:11 E,39:41:56 N 140:13.3396 E DP 39:41:56 N 140:13.3396 E DP 39:41:56 N 140:13.1909 E DP 39:42:10 N 140:13.1872 E DP 39:42:10 N 140:29:48 E AC G AN TH-2-4 AL GND AH 3500 FT AMSL DP 40:24:27 N 140:29:48 E V X=40:11:54 N 140:21:42 E DB 39:59:21 N 140:29:48 E,40:24.7703 N 140:28:55 E DP 40:24.7703 N 140:28:55 E DP 40:24:27 N 140:29:48 E AC G AN TH-2-5 AL GND AH 3500 FT AMSL DP 40:30:12 N 139:40:54 E DP 40:30:10 N 139:49:48 E DP 40:10:10 N 139:39:48 E DP 39:20:10 N 139:39:48 E DP 39:20:51 N 138:59:48 E DP 40:17:28 N 139:36:25 E DP 40:30:12 N 139:40:54 E AC G AN TH-3-1 AL GND AH 5000 FT AMSL DP 39:26:00 N 141:08:01 E V X=39:26:00 N 141:08:01 E DB 39:25.9731 N 140:48:37 E,39:25.9731 N 141:27.4244 E DP 39:25.9731 N 141:27.4244 E DP 39:26:00 N 141:08:01 E AC G AN TH-3-2 AL GND AH 5000 FT AMSL DP 39:26:00 N 141:08:01 E V X=39:26:00 N 141:08:01 E DB 39:25.9731 N 141:27.4244 E,39:25.9731 N 140:48:37 E DP 39:25.9731 N 140:48:37 E DP 39:26:00 N 141:08:01 E AC G AN Tochigi HELI AL GND AH 2000 FT AMSL V X=36:33:35 N 140:00:22 E DC 1 AC G AN Tohma GP 560FT AL GND AH 2000 FT AMSL V X=43:52:31 N 142:30:42 E DC 1 AC G AN Tokyo-Asahi HELI AL GND AH 2000 FT AMSL V X=35:39:51 N 139:45:59 E DC 1 AC G AN Toyotomi HELI AL GND AH 2000 FT AMSL V X=45:06:02 N 141:45:32 E DC 1 AC G AN Tsukuba HELI AL GND AH 2000 FT AMSL V X=36:07:03 N 140:07:52 E DC 1 AC G AN Tsushi-Isewan HELI AL GND AH 2000 FT AMSL V X=34:40:22 N 136:33:21 E DC 1 AC G AN Urayasu HELI AL GND AH 2000 FT AMSL V X=35:37:26 N 139:53:40 E DC 1 AC G AN Wakasa HELI AL GND AH 2000 FT AMSL V X=35:29:25 N 135:47:08 E DC 1 AC G AN Yamanashiken-Keisatsu HELI AL GND AH 2000 FT AMSL V X=35:32:02 N 138:27:51 E DC 1 AC G AN Yokohama HELI AL GND AH 2000 FT AMSL V X=35:20:32 N 139:39:23 E DC 1 AC G AN Yonezawa HELI AL GND AH 2000 FT AMSL V X=37:54:47 N 140:09:58 E DC 1 AC Q AN JSDF 1 AL GND AH 5000 FT AMSL DP 36:40:11 N 140:35:48 E DP 37:02:11 N 141:08:48 E DP 36:40:11 N 141:04:48 E DP 36:40:11 N 140:35:48 E AC Q AN JSDF 2 AL GND AH 8000 FT AMSL DP 37:59:11 N 140:07:48 E DP 37:12:11 N 140:08:48 E DP 37:51:11 N 139:27:48 E DP 37:59:11 N 140:07:48 E AC Q AN JSDF 3-1 AL GND AH 10000 FT AMSL DP 37:19:11 N 139:29:48 E DP 36:56:11 N 139:53:48 E DP 36:41:11 N 139:51:48 E DP 36:09:11 N 138:45:49 E DP 36:20:11 N 138:24:49 E DP 37:19:11 N 139:29:48 E AC Q AN JSDF 3-2 AL GND AH 8000 FT AMSL DP 36:41:11 N 139:51:48 E DP 36:56:11 N 139:53:48 E DP 36:47:11 N 140:03:48 E DP 36:41:11 N 139:51:48 E AC Q AN JSDF 4-1 AL GND AH 11000 FT AMSL DP 35:08:12 N 138:34:49 E DP 34:56:12 N 137:46:49 E DP 35:03:02 N 137:41:13 E DP 35:3.90152 N 137:41.5703 E DP 35:05:07 N 137:42:01 E DP 35:06:20 N 137:42:25 E DP 35:08:12 N 138:34:49 E AC Q AN JSDF 4-2 AL GND AH 7000 FT AMSL DP 34:58:35 N 137:38:58 E DP 34:59:31 N 137:39.5031 E DP 35:0.66993 N 137:40.1193 E DP 35:01:51 N 137:40.6906 E DP 35:03:02 N 137:41:13 E DP 34:56:12 N 137:46:49 E DP 34:55:19 N 137:43:20 E DP 34:58:35 N 137:38:58 E AC Q AN JSDF 4-3 AL GND AH 6000 FT AMSL V X=35:15:55 N 136:54.9015 E DB 35:04:49 N 137:41:55 E,35:00:01 N 137:39:47 E DP 35:00:01 N 137:39:47 E DP 34:58:52 N 137:39:08 E V X=34:44:57 N 137:42.5862 E DB 35:03:54 N 137:35:16 E,35:04:49 N 137:41:55 E AC Q AN JSDF 4-4 AL GND AH 6000 FT AMSL DP 35:09:12 N 138:59:49 E DP 34:52:12 N 138:59:49 E DP 34:54:12 N 137:44:49 E DP 34:55:19 N 137:43:20 E DP 34:56:12 N 137:46:49 E DP 35:08:12 N 138:34:49 E DP 35:09:12 N 138:59:49 E AC Q AN JSDF 4-5 AL GND AH 4000 FT AMSL DP 35:03:54 N 137:35:16 E DP 34:58:52 N 137:39:08 E DP 34:58:35 N 137:38:58 E DP 35:03:10 N 137:32:50 E DP 35:03:18 N 137:33:13 E DP 35:3.62496 N 137:34:14 E DP 35:03:54 N 137:35:16 E AC Q AN JSDF 5A AL GND AH 10000 FT AMSL DP 35:56:45 N 136:06:14 E DP 35:43:08 N 136:18:54 E DP 35:42:12 N 136:17.8582 E DP 35:41.2245 N 136:16.858 E V D=- V X=35:15:55 N 136:54:54 E DB 35:41.2245 N 136:16.858 E,35:35:13 N 136:11:54 E DP 35:35:13 N 136:11:54 E DP 35:36:11 N 135:37:50 E DP 35:56:45 N 136:06:14 E AC Q AN JSDF 5B AL 2000 FT AMSL AH 10000 FT AMSL DP 35:44:08 N 135:56:51 E DP 35:44:25 N 135:56.8194 E DP 35:44:42 N 135:56:51 E V X=35:44:25 N 135:59:17 E DB 35:44:42 N 135:56:51 E,35:46:24 N 135:58:58 E V X=35:45:15 N 136:00:59 E DB 35:46:24 N 135:58:58 E,35:46.5238 N 136:02:53 E DP 35:46.5238 N 136:02:53 E DP 35:46:28 N 136:02:56 E DP 35:46:16 N 136:03:07 E DP 35:46.0371 N 136:3.31925 E DP 35:45:47 N 136:3.47211 E V X=35:45:02 N 136:01:11 E DB 35:45:47 N 136:3.47211 E,35:43:02 N 136:01:03 E DP 35:43:02 N 136:01:03 E DP 35:42.8358 N 136:0.801601 E DP 35:42:41 N 136:00:31 E DP 35:42.5549 N 136:00:12 E DP 35:42:33 N 136:00:11 E DP 35:42.2719 N 136:00:15 E DP 35:41.9891 N 136:00:15 E V X=35:42:07 N 135:57:47 E DB 35:41.9891 N 136:00:15 E,35:40:16 N 135:56:50 E DP 35:40:16 N 135:56:50 E DP 35:40.3881 N 135:56.5188 E DP 35:40:33 N 135:56:14 E DP 35:40:43 N 135:56:00 E DP 35:40:55 N 135:55.7526 E V X=35:42:14 N 135:57:36 E DB 35:40:55 N 135:55.7526 E,35:44.135 N 135:56:51 E DP 35:44.135 N 135:56:51 E DP 35:44:08 N 135:56:51 E AC Q AN JSDF 6 AL GND AH FL150 DP 36:20:11 N 135:04:50 E DP 36:04:36 N 135:02:58 E DP 35:55:11 N 134:33:13 E DP 35:55:11 N 133:39:50 E DP 36:31:56 N 133:39:50 E DP 36:25:36 N 133:51:48 E DP 36:20:11 N 133:59:50 E DP 36:20:11 N 135:04:50 E AC Q AN JSDF 7 AL GND AH 11000 FT AMSL DP 35:06:11 N 132:35:51 E DP 34:24:12 N 132:07:51 E DP 34:32:56 N 131:52:35 E DP 34:33:16 N 131:53:12 E DP 34:33:38 N 131:53.7711 E V D=- V X=34:40:34 N 131:46:47 E DB 34:33:38 N 131:53.7711 E,34:36:15 N 131:56:24 E DP 34:36:15 N 131:56:24 E DP 34:57:22 N 132:10:31 E DP 35:06:11 N 132:35:51 E AC Q AN JSDF 8-1 AL GND AH 11000 FT AMSL DP 34:08:12 N 130:39:51 E DP 34:20:11 N 130:39:51 E DP 34:41:11 N 130:52:51 E DP 34:21:12 N 131:28:51 E DP 34:08:12 N 130:39:51 E AC Q AN JSDF 8-2 AL GND AH 3000 FT AMSL DP 34:06:12 N 130:39:51 E DP 34:08:12 N 130:39:51 E DP 34:21:12 N 131:28:51 E DP 34:20:12 N 131:29:51 E DP 34:15:12 N 131:25:51 E DP 34:06:12 N 130:39:51 E AC Q AN JSDF 9-1 AL GND AH 9000 FT AMSL DP 34:43:22 N 131:21:57 E V D=- V X=34:43:52 N 131:31:31 E DB 34:42:42 N 131:20:40 E,34:35:10 N 131:28:44 E DP 34:35:10 N 131:28:44 E DP 34:34:55 N 131:29:54 E DP 34:25:11 N 131:21:42 E DP 34:41:11 N 130:52:51 E DP 34:43:22 N 131:21:57 E AC Q AN JSDF 9-2 AL GND AH 11000 FT AMSL DP 34:34:55 N 131:29:54 E DP 34:31:52 N 131:44:01 E DP 34:31.7247 N 131:44.7238 E DP 34:31:38 N 131:45:27 E V D=- V X=34:40:34 N 131:46:47 E DB 34:31:38 N 131:45:27 E,34:32:56 N 131:52:35 E DP 34:32:56 N 131:52:35 E DP 34:24:12 N 132:07:51 E DP 34:15:12 N 131:25:51 E DP 34:20:12 N 131:29:51 E DP 34:21:12 N 131:28:51 E DP 34:25:11 N 131:21:42 E DP 34:34:55 N 131:29:54 E AC Q AN JSDF B-1 AL GND AH FL999 DP 42:26:09 N 142:09:46 E DP 42:24:09 N 143:07:46 E DP 41:33:10 N 143:29:46 E DP 40:53:10 N 143:13:46 E DP 40:16:10 N 142:21:47 E DP 40:12:10 N 142:13:47 E DP 42:15:09 N 142:02:46 E DP 42:26:09 N 142:09:46 E AC Q AN JSDF B-2 AL 11000 FT AMSL AH FL999 DP 42:24:09 N 143:07:46 E DP 42:23:09 N 143:49:46 E DP 41:33:10 N 143:29:46 E DP 42:24:09 N 143:07:46 E AC Q AN JSDF B-3 AL GND AH FL999 DP 40:53:10 N 143:13:46 E DP 40:09:10 N 142:56:47 E DP 40:00:10 N 142:34:47 E DP 39:48:10 N 142:10:47 E DP 40:00:10 N 142:14:47 E DP 40:12:10 N 142:13:47 E DP 40:16:10 N 142:21:47 E DP 40:53:10 N 143:13:46 E AC Q AN JSDF C-1A AL GND AH FL999 DP 44:42:07 N 139:07:19 E DP 45:00:08 N 139:22:12 E DP 45:00:08 N 141:21:43 E DP 44:54:28 N 141:29:23 E DP 44:00:08 N 141:25:46 E DP 43:10:09 N 140:39:47 E DP 43:0.723571 N 140:36.3082 E DP 43:1.5735 N 140:33.3364 E DP 43:1.61827 N 140:33.3543 E DP 43:1.83668 N 140:33:27 E V D=- V X=43:02:17 N 140:30:47 E DB 43:1.83668 N 140:33:27 E,43:01:34 N 140:33:20 E DP 43:01:34 N 140:33:20 E DP 43:0.722176 N 140:36.3082 E DP 40:17:28 N 139:36:25 E DP 38:48:01 N 138:39:04 E DP 39:14:58 N 138:05:37 E DP 40:22:43 N 138:31:39 E DP 44:42:07 N 139:07:19 E AC Q AN JSDF C-1B AL 2000 FT AMSL AH FL999 V X=43:02:17 N 140:30:47 E DC 2 AC Q AN JSDF C-2 AL GND AH FL150 DP 42:02:52 N 140:15:06 E DP 41:46:06 N 140:09:23 E V X=42:4.21817 N 139:26.6042 E DB 41:52:32 N 139:39:13 E,42:9.74095 N 139:45:23 E DP 42:9.74095 N 139:45:23 E DP 42:09:10 N 139:45:38 E DP 42:02:52 N 140:15:06 E AC Q AN JSDF D-1 AL GND AH FL200 DP 40:32:10 N 143:53:46 E DP 40:00:10 N 143:46:46 E DP 39:08:11 N 142:55:47 E DP 39:06:39 N 142:54:08 E DP 38:44:51 N 142:30:50 E DP 38:51:11 N 142:21:47 E DP 38:28:11 N 141:59:47 E DP 38:22:53 N 142:07:21 E DP 38:10:11 N 141:53:47 E DP 38:10:11 N 141:49:47 E DP 38:37:48 N 141:55:39 E DP 39:10:20 N 142:02:37 E DP 39:48:10 N 142:10:47 E DP 40:00:10 N 142:34:47 E DP 40:09:10 N 142:56:47 E DP 40:31:37 N 143:52:25 E DP 40:32:10 N 143:53:46 E AC Q AN JSDF E-1A AL GND AH FL800 DP 36:05:00 N 141:20:48 E DP 36:38:48 N 141:20:48 E DP 36:40:43 N 142:10:46 E DP 36:09:59 N 141:59:52 E DP 36:05:00 N 141:46:04 E DP 36:05:00 N 141:20:48 E AC Q AN JSDF E-2-1A AL GND AH FL800 DP 36:38:48 N 141:20:48 E DP 36:40:11 N 141:20:48 E DP 36:40:11 N 141:04:48 E DP 36:44:06 N 141:05:27 E DP 36:59:46 N 141:20:48 E DP 37:06:49 N 142:20:12 E DP 36:40:43 N 142:10:46 E DP 36:38:48 N 141:20:48 E AC Q AN JSDF E-2-2 AL GND AH 13000 FT AMSL DP 36:44:06 N 141:05:27 E DP 36:58:11 N 141:07:48 E DP 36:59:46 N 141:20:48 E DP 36:44:06 N 141:05:27 E AC Q AN JSDF E-3-1 AL GND AH FL800 DP 36:50:31 N 141:11:43 E DP 36:59:46 N 141:20:48 E DP 37:27:30 N 141:40:00 E DP 37:41:11 N 141:57:47 E DP 37:49:57 N 142:10:38 E DP 37:47:24 N 142:35:06 E DP 37:06:49 N 142:20:12 E DP 37:05:11 N 142:06:47 E DP 36:50:31 N 141:11:43 E AC Q AN JSDF E-3-2 AL GND AH 13000 FT AMSL DP 36:49:11 N 141:06:48 E DP 37:03:11 N 141:08:48 E DP 37:27:30 N 141:40:00 E DP 36:59:46 N 141:20:48 E DP 36:50:31 N 141:11:43 E DP 36:49:11 N 141:06:48 E AC Q AN JSDF E-4 AL GND AH FL800 DP 36:09:59 N 141:59:52 E DP 36:40:43 N 142:10:46 E DP 37:06:49 N 142:20:12 E DP 37:47:24 N 142:35:06 E DP 37:46:46 N 142:41:14 E DP 37:09:23 N 142:41:14 E DP 36:09:59 N 141:59:52 E AC Q AN JSDF G-1-1 AL GND AH FL999 DP 40:00:09 N 135:59:47 E DP 39:50:09 N 135:59:48 E DP 39:03:09 N 136:59:49 E DP 39:00:10 N 136:59:49 E DP 38:55:11 N 137:09:48 E DP 38:41:20 N 137:28:26 E DP 38:11:45 N 137:59:49 E DP 38:04:11 N 137:59:49 E DP 36:23:46 N 134:27:01 E DP 36:25:36 N 133:51:48 E DP 36:50:01 N 133:05:16 E DP 36:57:00 N 133:04:40 E DP 37:53:04 N 132:59:50 E DP 38:00:10 N 132:59:50 E DP 40:00:09 N 135:19:34 E DP 40:00:09 N 135:59:47 E AC Q AN JSDF G-1-2 AL GND AH FL250 DP 36:23:46 N 134:27:01 E DP 36:20:11 N 134:19:50 E DP 36:20:11 N 133:59:50 E DP 36:25:36 N 133:51:48 E DP 36:23:46 N 134:27:01 E AC Q AN JSDF G-2 AL GND AH FL999 DP 40:00:10 N 136:59:49 E DP 39:03:09 N 136:59:49 E DP 39:50:09 N 135:59:48 E DP 40:00:09 N 135:59:47 E DP 40:00:10 N 136:59:49 E AC Q AN JSDF G-3 AL GND AH FL999 DP 38:55:11 N 137:09:48 E DP 38:30:10 N 137:59:48 E DP 38:11:45 N 137:59:49 E DP 38:41:20 N 137:28:26 E DP 38:55:11 N 137:09:48 E AC Q AN JSDF G-4 AL GND AH FL250 DP 37:23:11 N 136:29:49 E DP 36:49:11 N 136:29:49 E DP 36:20:11 N 135:28:50 E DP 36:20:11 N 134:19:50 E DP 37:23:11 N 136:29:49 E AC Q AN JSDF H-1A AL GND AH FL230 DP 37:33:11 N 139:02:48 E DP 37:04:09 N 139:13:14 E DP 36:20:11 N 138:24:49 E DP 36:09:11 N 138:45:49 E DP 36:02:11 N 138:17:49 E DP 36:33:18 N 138:17:49 E DP 37:03:50 N 138:38:00 E DP 37:33:11 N 139:02:48 E AC Q AN JSDF H-1B AL 10000 FT AMSL AH FL230 DP 36:09:11 N 138:45:49 E DP 36:20:11 N 138:24:49 E DP 37:04:09 N 139:13:14 E DP 36:29:11 N 139:25:48 E DP 36:09:11 N 138:45:49 E AC Q AN JSDF J-1 AL GND AH FL140 DP 35:47:11 N 136:53:49 E DP 36:21:11 N 136:39:49 E DP 36:25:11 N 136:47:49 E DP 36:24:11 N 136:51:49 E DP 36:13:11 N 137:16:49 E DP 35:47:11 N 136:53:49 E AC Q AN JSDF J-2 AL FL160 AH FL190 DP 36:25:11 N 136:47:49 E DP 36:57:11 N 137:41:49 E DP 36:30:11 N 137:20:49 E DP 36:24:11 N 136:51:49 E DP 36:25:11 N 136:47:49 E AC Q AN JSDF J-3 AL GND AH FL190 DP 36:24:11 N 136:51:49 E DP 36:30:11 N 137:20:49 E DP 36:57:11 N 137:41:49 E DP 36:41:11 N 137:41:49 E DP 36:13:11 N 137:16:49 E DP 36:24:11 N 136:51:49 E AC Q AN JSDF K-1-1 AL GND AH FL310 DP 34:23:24 N 137:10:26 E DP 34:23:38 N 137:36:11 E DP 34:16:57 N 137:49:55 E DP 34:07:46 N 137:45:50 E DP 33:50:29 N 136:39:49 E DP 34:23:24 N 137:10:26 E AC Q AN JSDF K-1-2 AL GND AH FL250 DP 34:23:23 N 137:09:16 E DP 34:23:24 N 137:10:26 E DP 33:50:29 N 136:39:49 E DP 33:49:45 N 136:37:03 E DP 33:56:27 N 136:34:01 E DP 34:22:50 N 137:08:09 E DP 34:23:23 N 137:09:16 E AC Q AN JSDF K-2 AL GND AH FL240 DP 34:16:57 N 137:49:55 E DP 34:13:54 N 137:56:09 E DP 33:18:16 N 138:20:06 E DP 32:52:48 N 137:02:26 E DP 33:49:45 N 136:37:03 E DP 33:50:29 N 136:39:49 E DP 34:07:46 N 137:45:50 E DP 34:16:57 N 137:49:55 E AC Q AN JSDF L-1 AL GND AH FL999 DP 32:09:13 N 132:53:51 E DP 32:15:12 N 133:18:51 E DP 32:37:12 N 134:02:51 E DP 32:46:49 N 134:32:00 E DP 32:53:53 N 135:00:50 E DP 32:33:13 N 135:00:50 E DP 30:48:13 N 132:22:51 E DP 31:04:13 N 132:07:51 E DP 31:42:13 N 133:29:51 E DP 32:02:13 N 133:29:51 E DP 31:48:13 N 132:59:51 E DP 32:09:13 N 132:59:51 E DP 32:06:07 N 132:50:45 E DP 32:09:13 N 132:53:51 E AC Q AN JSDF L-2 AL GND AH FL200 DP 32:09:13 N 132:53:51 E DP 32:37:12 N 134:02:51 E DP 32:15:12 N 133:18:51 E DP 32:09:13 N 132:53:51 E AC Q AN JSDF L-3 AL GND AH FL200 DP 32:46:49 N 134:32:00 E DP 32:56:12 N 135:00:50 E DP 33:03:12 N 135:21:50 E DP 32:53:12 N 135:29:50 E DP 32:33:13 N 135:00:50 E DP 32:53:53 N 135:00:50 E DP 32:46:49 N 134:32:00 E AC Q AN JSDF L-3 AL GND AH FL150 DP 33:03:12 N 135:21:50 E DP 33:07:12 N 135:33:50 E DP 32:57:12 N 135:36:50 E DP 32:53:12 N 135:29:50 E DP 33:03:12 N 135:21:50 E AC Q AN JSDF N-1 AL GND AH FL999 DP 35:04:11 N 129:51:52 E DP 34:46:11 N 130:31:51 E DP 34:17:11 N 130:12:52 E DP 34:25:11 N 129:55:52 E DP 34:25:11 N 129:55:12 E DP 34:30:10 N 129:51:46 E DP 34:40:11 N 129:39:52 E DP 34:53:21 N 129:27:02 E DP 35:03:11 N 129:39:52 E DP 35:04:11 N 129:51:52 E AC Q AN JSDF N-21 AL GND AH FL800 DP 35:33:19 N 130:20:04 E DP 35:31:48 N 130:33:21 E DP 35:05:03 N 130:37:24 E DP 35:04:11 N 129:56:16 E DP 35:04:11 N 129:51:52 E DP 35:03:11 N 129:39:52 E DP 35:33:19 N 130:20:04 E AC Q AN JSDF N-22F AL GND AH FL800 DP 35:31:48 N 130:33:21 E DP 35:20:11 N 132:14:51 E DP 35:18:05 N 132:18:50 E DP 35:17:26 N 132:12:01 E DP 35:05:43 N 131:04:51 E DP 35:05:33 N 131:00:51 E DP 35:16:49 N 130:35:36 E DP 35:31:48 N 130:33:21 E AC Q AN JSDF N-22S AL GND AH FL800 DP 35:16:49 N 130:35:36 E DP 35:05:33 N 131:00:51 E DP 35:05:03 N 130:37:24 E DP 35:16:49 N 130:35:36 E AC Q AN JSDF N-23F AL GND AH FL800 DP 35:12:37 N 131:44:21 E V D=- V X=34:40:34 N 131:46:47 E DB 35:02:07 N 131:41:29 E,34:54:32 N 131:26.1047 E DP 34:54:32 N 131:26.1047 E DP 34:54:09 N 131:25:45 E DP 35:05:33 N 131:00:51 E DP 35:05:43 N 131:04:51 E DP 35:12:37 N 131:44:21 E AC Q AN JSDF N-24F AL GND AH FL800 DP 35:05:33 N 131:00:51 E V D=- V X=34:40:34 N 131:46:47 E DB 34:54:09 N 131:25:45 E,34:43.9398 N 131:20.3702 E DP 34:43.9398 N 131:20.3702 E DP 34:43:15 N 131:20:18 E DP 34:41:11 N 130:52:51 E DP 34:26:19 N 130:43:38 E DP 34:24:54 N 130:39:41 E DP 34:43:31 N 130:52:01 E DP 34:51:11 N 130:35:06 E DP 34:46:11 N 130:31:51 E DP 35:04:11 N 129:51:52 E DP 35:04:11 N 129:56:16 E DP 35:05:03 N 130:37:24 E DP 35:05:33 N 131:00:51 E AC Q AN JSDF P-1 AL GND AH FL999 DP 32:00:12 N 129:34:52 E DP 31:18:13 N 129:34:52 E DP 30:22:13 N 127:59:53 E DP 32:30:12 N 127:11:53 E DP 32:30:12 N 127:29:53 E DP 34:00:11 N 128:37:52 E DP 34:00:11 N 128:59:52 E DP 33:50:12 N 129:21:52 E DP 33:10:12 N 128:59:52 E DP 33:00:12 N 128:29:52 E DP 32:19:12 N 128:29:52 E DP 32:14:31 N 128:45:52 E DP 31:47:12 N 128:45:52 E DP 31:47:12 N 129:09:52 E DP 32:07:30 N 129:09:52 E DP 32:00:12 N 129:34:52 E AC Q AN JSDF P-2 AL 13000 FT AMSL AH FL999 DP 32:00:12 N 129:34:52 E DP 32:07:30 N 129:09:52 E DP 32:18:46 N 129:09:52 E DP 32:40:12 N 129:34:52 E DP 32:40:12 N 129:49:52 E DP 32:20:12 N 129:49:52 E DP 32:00:12 N 129:34:52 E AC Q AN JSDF Q-1 AL 11000 FT AMSL AH FL230 DP 35:06:11 N 132:35:51 E DP 34:24:12 N 132:07:51 E DP 34:32:56 N 131:52:35 E DP 34:32.624 N 131:51:58 E DP 34:32.3583 N 131:51.306 E V X=34:40:34 N 131:46:47 E DB 34:32.3583 N 131:51.306 E,34:36:15 N 131:56:24 E DP 34:36:15 N 131:56:24 E DP 34:57:22 N 132:10:31 E DP 35:06:11 N 132:35:51 E AC Q AN JSDF Q-2 AL FL140 AH FL230 DP 34:57:22 N 132:10:31 E V X=34:40:34 N 131:46:47 E DB 34:36:15 N 131:56:24 E,34:33.1557 N 131:53:01 E DP 34:33.1557 N 131:53:01 E DP 34:32:56 N 131:52:35 E DP 34:44:11 N 131:32:51 E DP 34:57:22 N 132:10:31 E AC Q AN JSDF S-1 AL GND AH FL800 DP 28:00:38 N 140:20:36 E DP 25:37:21 N 140:53:58 E DP 25:36.7686 N 140:52.4511 E DP 25:36.103 N 140:50:59 E V D=- V X=24:47:05 N 141:18:57 E DB 25:36.103 N 140:50:59 E,23:51:55 N 141:18:31 E DP 23:51:55 N 141:18:31 E DP 21:50:03 N 141:46:53 E DP 21:50:03 N 139:36:40 E DP 21:51:23 N 139:33:59 E DP 21:52.7415 N 139:31.3053 E DP 21:54.1385 N 139:28.6545 E DP 21:55.5694 N 139:26.0244 E DP 21:57:02 N 139:23:25 E DP 21:58:32 N 139:20:50 E DP 22:00:04 N 139:18:16 E DP 22:01:38 N 139:15.7198 E DP 22:3.22175 N 139:13:12 E DP 22:04:51 N 139:10.7041 E DP 22:06:31 N 139:08:14 E DP 22:8.20109 N 139:5.78459 E DP 22:9.92369 N 139:03:22 E DP 22:11:41 N 139:00:58 E DP 22:13:28 N 138:58:36 E DP 22:15:17 N 138:56:15 E DP 22:17.1195 N 138:53:56 E DP 22:19:00 N 138:51.6409 E DP 22:20:54 N 138:49:23 E DP 22:22:50 N 138:47:09 E DP 22:24.7875 N 138:44.9375 E DP 22:26:47 N 138:42:46 E DP 22:28.7914 N 138:40:37 E DP 22:30.8345 N 138:38:30 E DP 22:32.9046 N 138:36:25 E DP 22:35.0012 N 138:34.3522 E DP 22:37.1239 N 138:32:20 E DP 22:39.2723 N 138:30:20 E DP 22:41:27 N 138:28.3718 E DP 22:43:39 N 138:26:27 E DP 22:45.868 N 138:24:33 E DP 22:48:07 N 138:22:41 E DP 22:50.3861 N 138:20.8529 E DP 22:52:41 N 138:19.057 E DP 22:55:00 N 138:17:18 E DP 22:57.3364 N 138:15.5684 E DP 22:59:42 N 138:13:53 E DP 23:02:05 N 138:12.2198 E DP 23:04:29 N 138:10:36 E DP 23:6.90768 N 138:09:01 E DP 23:9.35181 N 138:07:28 E DP 23:11:49 N 138:5.95349 E DP 23:14:18 N 138:04:29 E DP 23:16:48 N 138:3.04116 E DP 23:19.3195 N 138:1.6413 E DP 23:21.8568 N 138:00:17 E DP 23:24:15 N 137:59:53 E DP 26:16:51 N 138:01:14 E DP 26:19.7231 N 138:01:52 E DP 26:22.2392 N 138:3.30502 E DP 26:24.7365 N 138:4.78937 E DP 26:27:13 N 138:06:19 E DP 26:29.6729 N 138:07:53 E DP 26:32:07 N 138:09:29 E DP 26:34:32 N 138:11:08 E DP 26:36.9241 N 138:12:49 E DP 26:39:18 N 138:14:32 E DP 26:41:39 N 138:16.2906 E DP 26:43:59 N 138:18.0888 E DP 26:46.285 N 138:19.9247 E DP 26:48:34 N 138:21:48 E DP 26:50.825 N 138:23:43 E DP 26:53.0581 N 138:25.656 E DP 26:55:16 N 138:27.6396 E DP 26:57:27 N 138:29:40 E DP 26:59.6048 N 138:31:43 E DP 27:1.73451 N 138:33.8051 E DP 27:3.83726 N 138:35:56 E DP 27:05:55 N 138:38.0902 E DP 27:07:58 N 138:40:17 E DP 27:09:59 N 138:42:31 E DP 27:11.9695 N 138:44.7715 E DP 27:13:56 N 138:47:04 E DP 27:15:52 N 138:49.3897 E DP 27:17:46 N 138:51:45 E DP 27:19.6353 N 138:54.1349 E DP 27:21:29 N 138:56.5539 E DP 27:23.2852 N 138:59.0033 E DP 27:25:04 N 139:01:29 E DP 27:26:49 N 139:3.99082 E DP 27:28.5222 N 139:06:32 E DP 27:30.203 N 139:09:06 E DP 27:31:51 N 139:11.6868 E DP 27:33:28 N 139:14.3073 E DP 27:35:03 N 139:16.9544 E DP 27:36:36 N 139:19:38 E DP 27:38.1044 N 139:22:20 E DP 27:39:35 N 139:25:03 E DP 27:41.0241 N 139:27:48 E DP 27:42:26 N 139:30.571 E DP 27:43.8024 N 139:33:22 E DP 27:45.1377 N 139:36.1847 E DP 27:46.4367 N 139:39:02 E DP 27:47:42 N 139:41.887 E DP 27:48.925 N 139:44.7697 E DP 27:50:07 N 139:47.6729 E DP 27:51:16 N 139:50:36 E DP 27:52:23 N 139:53.5375 E DP 27:53.4546 N 139:56:30 E DP 27:54:30 N 139:59:29 E DP 27:55:30 N 140:2.47138 E DP 27:56.4531 N 140:05:29 E DP 27:57:23 N 140:08:31 E DP 27:58:16 N 140:11.5541 E DP 27:59.1033 N 140:14:37 E DP 27:59:55 N 140:17:41 E DP 28:00:38 N 140:20:36 E AC Q AN JSDF S-2 AL GND AH FL200 DP 27:11:26 N 140:32:03 E DP 27:12.1229 N 140:34:22 E DP 27:12:46 N 140:37.0231 E V X=24:47:05 N 141:18:57 E DB 27:12:46 N 140:37.0231 E,22:17:54 N 141:40:24 E DP 22:17:54 N 141:40:24 E V D=- V X=24:47:05 N 141:18:57 E DB 23:51:55 N 141:18:31 E,25:37.9908 N 140:55.4526 E DP 25:37.9908 N 140:55.4526 E DP 25:37:21 N 140:53:58 E DP 27:11:26 N 140:32:03 E AC Q AN JSDF U AL GND AH FL250 DP 36:32:11 N 131:38:51 E DP 36:45:11 N 131:59:51 E DP 37:00:10 N 132:30:51 E DP 36:15:54 N 132:45:48 E DP 35:52:47 N 132:50:22 E DP 35:52:11 N 132:49:51 E DP 36:32:11 N 131:38:51 E AC Q AN NUC Aso 100KW AL GND AH 1000 FT AMSL V X=35:34:56 N 139:31:32 E DC 0.5 AC Q AN NUC Fukushima Daiichi 3300MW AL GND AH 2000 FT AMSL V X=37:25:28 N 141:01:59 E DC 2.3 AC Q AN NUC Fukushima Daini 3300MW AL GND AH 2000 FT AMSL V X=37:18:52 N 141:01:30 E DC 2 AC Q AN NUC Genkai 3430MW AL GND AH 2000 FT AMSL DP 33:32:31 N 129:48:23 E DP 33:32:42 N 129:48:39 E DP 33:32.8416 N 129:48.9363 E V X=33:31:03 N 129:50:01 E DB 33:32.8416 N 129:48.9363 E,33:32:50 N 129:51:07 E V X=33:30:58 N 129:50:14 E DB 33:32:50 N 129:51:07 E,33:30.0063 N 129:52:21 E DP 33:30.0063 N 129:52:21 E DP 33:29:58 N 129:52:18 E DP 33:29:44 N 129:52.1249 E V X=33:30:55 N 129:50:12 E DB 33:29:44 N 129:52.1249 E,33:29:06 N 129:49:12 E V X=33:31:00 N 129:49:57 E DB 33:29:06 N 129:49:12 E,33:32:31 N 129:48:23 E AC Q AN NUC Hamaoka 3930MW AL GND AH 2000 FT AMSL V X=34:37.4216 N 138:8.52157 E DB 34:35:49 N 138:07:03 E,34:38:41 N 138:10:24 E V X=34:37:05 N 138:08:56 E DB 34:38:41 N 138:10:24 E,34:35:49 N 138:07:03 E AC Q AN NUC Higashidori 3300MW AL GND AH 2000 FT AMSL V X=41:11:18 N 141:23:24 E DC 2 AC Q AN NUC HigashiOsaka 1W AL GND AH 1000 FT AMSL V X=34:38:57 N 135:35:14 E DC 0.2 AC Q AN NUC Ikata 2670MW AL GND AH 2000 FT AMSL V X=33:29:27 N 132:18.6531 E DB 33:31:23 N 132:19:16 E,33:27:28 N 132:18:56 E V X=33:29:26 N 132:18:31 E DB 33:27:28 N 132:18:56 E,33:29.1849 N 132:16.1406 E DP 33:29.1849 N 132:16.1406 E DP 33:29:28 N 132:16:08 E DP 33:29:35 N 132:16.1212 E V X=33:29:29 N 132:18:31 E DB 33:29:35 N 132:16.1212 E,33:31:23 N 132:19:16 E AC Q AN NUC Kagamino AL GND AH 2000 FT AMSL V X=35:19:00 N 133:56:25 E DC 2 AC Q AN NUC Kashima 3930MW AL GND AH 2000 FT AMSL V X=35:32:29 N 132:59:48 E DB 35:31:07 N 132:58:00 E,35:33:41 N 133:1.77141 E DP 35:33:41 N 133:1.77141 E DP 35:33:39 N 133:01:48 E DP 35:33:26 N 133:2.01859 E V X=35:32:17 N 133:00:00 E DB 35:33:26 N 133:2.01859 E,35:31:05 N 132:58:02 E DP 35:31:05 N 132:58:02 E DP 35:31:07 N 132:58:00 E AC Q AN NUC Kashiwazaki-Kariwa 3930MW AL GND AH 2000 FT AMSL V X=37:25:45 N 138:35:44 E DB 37:25:05 N 138:38:06 E,37:26:38 N 138:33:29 E DP 37:26:38 N 138:33:29 E DP 37:26:50 N 138:33:38 E DP 37:27:06 N 138:33:46 E V X=37:26:11 N 138:36:00 E DB 37:27:06 N 138:33:46 E,37:25:05 N 138:38:06 E AC Q AN NUC Kumatori AL GND AH 2000 FT AMSL V X=34:23.3567 N 135:20:41 E DB 34:25:16 N 135:19:56 E,34:22:38 N 135:18:25 E DP 34:22:38 N 135:18:25 E V D=- V X=34:26:03 N 135:13:58 E DB 34:22:40 N 135:18:25 E,34:25.0201 N 135:19.8892 E DP 34:25.0201 N 135:19.8892 E DP 34:25:16 N 135:19:56 E AC Q AN NUC Oarai 140MW AL GND AH 2000 FT AMSL V X=36:16:04 N 140:32:58 E DC 2.15 AC Q AN NUC Ohi-cho 3430MW AL GND AH 2000 FT AMSL V X=35:32.5523 N 135:39:18 E DB 35:34:05 N 135:37:43 E,35:30:53 N 135:40:40 E V X=35:32:25 N 135:39.0843 E DB 35:30:53 N 135:40:40 E,35:34:05 N 135:37:43 E AC Q AN NUC Onagawa 2440MW AL GND AH 2000 FT AMSL V X=38:23:59 N 141:30:07 E DC 2 AC Q AN NUC Rokkasho-1 AL GND AH 1000 FT AMSL V X=40:58:33 N 141:21:11 E DC 0.2 AC Q AN NUC Rokkasho-2 AL GND AH 1000 FT AMSL V X=40:57:48 N 141:19:28 E DC 0.2 AC Q AN NUC Sendai 2660MW AL GND AH 2000 FT AMSL V X=31:49:59 N 130:11:25 E DC 2 AC Q AN NUC Shika 3930MW AL GND AH 2000 FT AMSL V X=37:03:39 N 136:43:37 E DC 2 AC Q AN NUC Takahama 2660MW AL GND AH 2000 FT AMSL V X=35:31:21 N 135:30:01 E DB 35:29:21 N 135:30:05 E,35:33:20 N 135:30:21 E V X=35:31.3358 N 135:30:25 E DB 35:33:20 N 135:30:21 E,35:29:21 N 135:30:05 E AC Q AN NUC Tokai 3300MW AL GND AH 2000 FT AMSL V X=36:27.9518 N 140:36:24 E DB 36:28:23 N 140:33:59 E,36:26:51 N 140:38:28 E V X=36:27:17 N 140:36.0536 E DB 36:26:51 N 140:38:28 E,36:28:23 N 140:33:59 E AC Q AN NUC Tokai MNF AL GND AH 1000 FT AMSL V X=36:28:25 N 140:32:41 E DC 0.5 AC Q AN NUC Tomari 2660MW AL GND AH 2000 FT AMSL V X=43:02:17 N 140:30:47 E DC 2 AC Q AN NUC Yokosuka-1 AL GND AH 1000 FT AMSL V X=35:13:21 N 139:37:12 E DC 0.5 AC Q AN NUC Yokosuka-2 AL GND AH 1000 FT AMSL V X=35:14:12 N 139:41:43 E DC 0.2 AC Q AN PARA Fujioka AL GND AH FL150 V X=36:15:06 N 139:40:42 E DC 1.5 AC Q AN PARA Okegawa AL GND AH FL150 V X=35:58:39 N 139:31:16 E DC 1.5 AC Q AN Tajima AP AL GND AH FL150 V X=35:30:46 N 134:47:13 E DC 1.5 AC R AN Camp Courtney Area AL GND AH 1000 FT AMSL DP 26:23:48 N 127:51:34 E DP 26:23:16 N 127:52:06 E DP 26:22:44 N 127:52:00 E DP 26:22:49 N 127:51:44 E DP 26:23:17 N 127:51:40 E DP 26:23:18 N 127:51:28 E DP 26:23:00 N 127:51:11 E DP 26:23:05 N 127:51:01 E DP 26:23:48 N 127:51:34 E AC R AN Camp Schwab AL GND AH 2000 FT AMSL DP 26:31:46 N 127:59:39 E DP 26:33:47 N 128:02:09 E DP 26:32:52 N 128:03:02 E DP 26:30:59 N 128:03:31 E DP 26:30:28 N 128:01:15 E DP 26:30:49 N 128:00:29 E DP 26:31:46 N 127:59:39 E AC R AN Central Training Area AL GND AH 1000 FT AMSL DP 26:33:42 N 127:59:59 E DP 26:32:34 N 128:00:54 E DP 26:31:59 N 128:02:39 E DP 26:31:04 N 128:02:51 E DP 26:31:27 N 128:01:56 E DP 26:31:19 N 127:59:53 E DP 26:30:53 N 127:59:14 E DP 26:29:32 N 127:58:46 E DP 26:28:58 N 127:56:18 E DP 26:27:20 N 127:55:33 E DP 26:27:53 N 127:51:26 E DP 26:29:18 N 127:51:17 E DP 26:29:58 N 127:52:23 E DP 26:28:35 N 127:55:02 E DP 26:30:03 N 127:55:27 E DP 26:31:32 N 127:58:37 E DP 26:33:42 N 127:59:59 E AC R AN Chubu Conical Surface AL GND AH FL999 DP 35:00:05 N 136:51:12 E DP 34:52:15 N 136:50:47 E DP 34:52.1566 N 136:50.8396 E DP 34:51.8705 N 136:50.9246 E DP 34:51:35 N 136:50:58 E DP 34:51:17 N 136:50:57 E V X=34:51:30 N 136:48:19 E DB 34:44:22 N 136:54:49 E,35:00:14 N 136:50:30 E DP 35:00:14 N 136:50:30 E DP 35:00:05 N 136:51:12 E AC R AN Chubu Outer Horizontal Surface AL 978 FT AMSL AH FL999 DP 35:04:16 N 136:51:25 E DP 35:00:05 N 136:51:12 E DP 35:00:10 N 136:50:51 E DP 35:00:17 N 136:50:08 E V D=- V X=34:51:30 N 136:48:19 E DB 35:00:17 N 136:50:08 E,34:44:22 N 136:54:49 E DP 34:44:22 N 136:54:49 E DP 34:40:36 N 136:56:55 E DP 34:40.3402 N 136:56.4735 E DP 34:39.9866 N 136:55:43 E V D=+ V X=34:51:30 N 136:48:19 E DB 34:39.9866 N 136:55:43 E,35:04:16 N 136:51:25 E AC R AN Fukuoka Conical Surface AL GND AH FL999 DP 33:42:26 N 130:33:07 E DP 33:30:40 N 130:36:23 E DP 33:30:09 N 130:36:02 E DP 33:29:40 N 130:35:37 E V X=33:35:04 N 130:27:06 E DB 33:29:40 N 130:35:37 E,33:26:12 N 130:25:55 E DP 33:26:12 N 130:25:55 E DP 33:31:44 N 130:17:12 E DP 33:32.2897 N 130:16:57 E DP 33:32:52 N 130:16.7416 E V X=33:35:04 N 130:27:06 E DB 33:32:52 N 130:16.7416 E,33:42:26 N 130:33:07 E AC R AN Fukuoka Outer Horizontal Surface-1 AL 1000 FT AMSL AH FL999 DP 33:47:28 N 130:31:43 E V D=- V X=33:35:04 N 130:27:06 E DB 33:42:26 N 130:33:07 E,33:31.7709 N 130:17.1688 E DP 33:31.7709 N 130:17.1688 E DP 33:31:44 N 130:17:12 E DP 33:33:09 N 130:11:45 E DP 33:33.8576 N 130:11.587 E DP 33:34:35 N 130:11:32 E V D=+ V X=33:35:04 N 130:27:06 E DB 33:34:35 N 130:11:32 E,33:47:28 N 130:31:43 E AC R AN Fukuoka Outer Horizontal Surface-2 AL 1000 FT AMSL AH FL999 DP 33:28:03 N 130:33:41 E DP 33:24:51 N 130:36:40 E DP 33:24:25 N 130:35.9849 E DP 33:24:01 N 130:35:16 E V X=33:35.0681 N 130:27:06 E DB 33:24:01 N 130:35:16 E,33:22:58 N 130:32:44 E DP 33:22:58 N 130:32:44 E V D=- V X=33:35:04 N 130:27:06 E DB 33:26:45 N 130:30:59 E,33:27.9016 N 130:33:29 E DP 33:27.9016 N 130:33:29 E DP 33:28:03 N 130:33:41 E AC R AN Hakodate Outer Horizontal Surface AL 1100 FT AMSL AH FL999 DP 41:43:00 N 141:00:26 E V X=41:46:12 N 140:49:19 E DB 41:40:30 N 141:04:52 E,41:54.0069 N 140:35:29 E DP 41:54.0069 N 140:35:29 E DP 41:54:08 N 140:35:37 E V D=- V X=41:46:12 N 140:49:19 E DB 41:52:15 N 140:40:34 E,41:42.6915 N 141:0.271377 E DP 41:42.6915 N 141:0.271377 E DP 41:43:00 N 141:00:26 E AC R AN Hakodate Outer Horizontal Surface AL GND AH FL999 DP 41:48:09 N 140:51:20 E DP 41:43:00 N 141:00:26 E DP 41:42:27 N 141:00:08 E DP 41:41.9182 N 140:59:46 E V X=41:46:12 N 140:49:19 E DB 41:41.9182 N 140:59:46 E,41:52:15 N 140:40:34 E DP 41:52:15 N 140:40:34 E DP 41:48:09 N 140:51:20 E AC R AN Kagoshima Conical Surface AL GND AH FL999 DP 31:57:01 N 130:44:47 E DP 31:57:01 N 130:44:48 E DP 31:56.9224 N 130:45:24 E V X=31:48.205 N 130:43:10 E DB 31:56.9224 N 130:45:24 E,31:57:01 N 130:44:47 E AC R AN Kagoshima Outer Horizontal Surface AL 1900 FT AMSL AH FL999 DP 32:01:08 N 130:44:30 E V D=- V X=31:48:12 N 130:43:10 E DB 31:57:01 N 130:44:47 E,31:44:52 N 130:52.9028 E DP 31:44:52 N 130:52.9028 E DP 31:45:01 N 130:52:56 E DP 31:42:35 N 130:56:53 E DP 31:41:56 N 130:56:32 E DP 31:41.3068 N 130:56.1039 E V D=+ V X=31:48:12 N 130:43:10 E DB 31:41.3068 N 130:56.1039 E,32:01:08 N 130:44:30 E AC R AN Kansai Conical Surface AL GND AH FL999 DP 34:28:39 N 135:24:17 E DP 34:25:17 N 135:18:26 E DP 34:23:26 N 135:16:29 E DP 34:22:02 N 135:13:19 E V X=34:26:03 N 135:13:58 E DB 34:17:58 N 135:09:23 E,34:28:54 N 135:24:14 E DP 34:28:54 N 135:24:14 E DP 34:28:39 N 135:24:17 E AC R AN Kansai Outer Horizontal Surface AL 1000 FT AMSL AH FL999 DP 34:31:03 N 135:28:26 E DP 34:28:39 N 135:24:17 E DP 34:29.2238 N 135:24:05 E DP 34:29.7747 N 135:23.8039 E V D=- V X=34:26:03 N 135:13:58 E DB 34:29.7747 N 135:23.8039 E,34:17:58 N 135:09:23 E DP 34:17:58 N 135:09:23 E DP 34:16:41 N 135:08:08 E DP 34:15:06 N 135:05:34 E V D=+ V X=34:26:03 N 135:13:58 E DB 34:15:06 N 135:05:34 E,34:31:24 N 135:28.2912 E DP 34:31:24 N 135:28.2912 E DP 34:31:03 N 135:28:26 E AC R AN Kumamoto Conical Surface AL GND AH FL999 DP 32:46:23 N 130:54:33 E V X=32:50:14 N 130:51:19 E DB 32:41:42 N 130:54:26 E,32:48.3725 N 131:1.70579 E DP 32:48.3725 N 131:1.70579 E DP 32:48:00 N 131:01:34 E DP 32:46:23 N 130:54:33 E AC R AN Kumamoto Outer Horizontal Surface AL 1600 FT AMSL AH FL999 DP 33:03:10 N 130:52:37 E DP 32:59:07 N 130:52:16 E DP 32:59.1578 N 130:51.5566 E DP 32:59.1512 N 130:50:51 E V D=- V X=32:50:14 N 130:51:19 E DB 32:59.1512 N 130:50:51 E,32:41:42 N 130:54:26 E DP 32:41:42 N 130:54:26 E V D=+ V X=32:50:14 N 130:51:19 E DB 32:37:30 N 130:54:20 E,33:3.20318 N 130:52:02 E DP 33:3.20318 N 130:52:02 E DP 33:03:10 N 130:52:37 E AC R AN Kushiro Conical Surface AL GND AH FL999 DP 43:05:37 N 144:22:56 E DP 43:00:00 N 144:18:28 E V X=43:02:27 N 144:11:35 E DB 42:57:05 N 144:21:17 E,43:5.96783 N 144:22.768 E DP 43:5.96783 N 144:22.768 E DP 43:05:37 N 144:22:56 E AC R AN Kushiro Outer Horizontal Surface-1 AL 1300 FT AMSL AH FL999 DP 43:09:44 N 144:26:13 E DP 43:05:37 N 144:22:56 E DP 43:6.17404 N 144:22:39 E DP 43:6.70719 N 144:22:17 E V D=- V X=43:02:27 N 144:11:35 E DB 43:6.70719 N 144:22:17 E,43:08:26 N 144:02:34 E DP 43:08:26 N 144:02:34 E V D=+ V X=43:2.45688 N 144:11:36 E DB 43:12:24 N 144:00:16 E,43:09:44 N 144:26:13 E AC R AN Kushiro Outer Horizontal Surface-2 AL 1300 FT AMSL AH FL999 DP 43:08:04 N 144:02:09 E DP 43:07:36 N 144:01:39 E DP 43:07:06 N 144:01:12 E V D=- V X=43:02:27 N 144:11:35 E DB 43:07:06 N 144:01:12 E,42:57:05 N 144:21:17 E DP 42:57:05 N 144:21:17 E V D=+ V X=43:02:27 N 144:11:35 E DB 42:53:40 N 144:24:35 E,43:7.90527 N 143:55.5055 E DP 43:7.90527 N 143:55.5055 E DP 43:08:20 N 143:55:50 E DP 43:08:04 N 144:02:09 E AC R AN Matsuyama Conical Surface AL GND AH FL999 DP 33:58:28 N 132:40:25 E DP 33:45:18 N 132:47:34 E DP 33:40:52 N 132:40:01 E DP 33:40.9852 N 132:39:19 E DP 33:41.1528 N 132:38.6244 E V X=33:49:38 N 132:41:59 E DB 33:41.1528 N 132:38.6244 E,33:58:28 N 132:40:25 E AC R AN Matsuyama Outer Horizontal Surface AL 1000 FT AMSL AH FL999 DP 34:02:15 N 132:38:21 E V D=- V X=33:49:38 N 132:41:59 E DB 33:58:28 N 132:40:25 E,33:40.9866 N 132:39.3068 E DP 33:40.9866 N 132:39.3068 E DP 33:40.8387 N 132:39.9887 E V D=+ V X=33:49:38 N 132:41:59 E DB 33:38:00 N 132:35:05 E,34:02:15 N 132:38:21 E AC R AN Miyazaki Conical Surface AL GND AH FL999 DP 32:00:12 N 131:21:22 E DP 32:00:12 N 131:32:28 E DP 31:59.8737 N 131:33.0559 E DP 31:59:31 N 131:33:37 E V X=31:52:38 N 131:26:55 E DB 31:59:31 N 131:33:37 E,31:45:28 N 131:33:10 E DP 31:45:28 N 131:33:10 E DP 31:50:13 N 131:19:59 E DP 31:50:17 N 131:16:49 E DP 31:50:52 N 131:16:38 E DP 31:51:27 N 131:16:31 E V X=31:52:38 N 131:26:55 E DB 31:51:27 N 131:16:31 E,32:00:12 N 131:21:22 E AC R AN Miyazaki Outer Horizontal Surface-1 AL 1000 FT AMSL AH FL999 DP 32:00:12 N 131:14:33 E V D=- V X=31:52:38 N 131:26:55 E DB 32:00:12 N 131:21:22 E,31:50.3525 N 131:16.7726 E DP 31:50.3525 N 131:16.7726 E DP 31:50:17 N 131:16:49 E DP 31:50:19 N 131:15:44 E DP 31:50:14 N 131:15.2563 E V D=+ V X=31:54:28 N 131:14:29 E DB 31:50:14 N 131:15.2563 E,31:50.7539 N 131:11:58 E DP 31:50.7539 N 131:11:58 E DP 31:50:49 N 131:11:51 E DP 31:51:32 N 131:11.7382 E DP 31:52:15 N 131:11.6884 E V X=31:52:38 N 131:26:55 E DB 31:52:15 N 131:11.6884 E,32:00:12 N 131:14:33 E AC R AN Miyazaki Outer Horizontal Surface-1 AL 1000 FT AMSL AH FL999 DP 32:00:12 N 131:32:28 E DP 32:00:12 N 131:39:17 E DP 31:59:37 N 131:39.7698 E DP 31:59:00 N 131:40.2061 E V X=31:52:38 N 131:26:55 E DB 31:59:00 N 131:40.2061 E,31:43:44 N 131:37:59 E DP 31:43:44 N 131:37:59 E V D=- V X=31:52:38 N 131:26:55 E DB 31:45:28 N 131:33:10 E,32:00:11 N 131:32.5213 E DP 32:00:11 N 131:32.5213 E DP 32:00:12 N 131:32:28 E AC R AN Nagasaki Outer Horizontal Surface-1 AL 1000 FT AMSL AH FL999 DP 33:07:57 N 129:53:30 E V D=- V X=32:55.0069 N 129:54:49 E DB 33:03:42 N 129:57:16 E,32:46:55 N 129:50:22 E DP 32:46:55 N 129:50:22 E DP 32:44:23 N 129:46:00 E DP 32:44:48 N 129:45:18 E DP 32:45.2529 N 129:44.6369 E V D=+ V X=32:55:01 N 129:54:49 E DB 32:45.2529 N 129:44.6369 E,33:07:57 N 129:53:30 E AC R AN Nagasaki Outer Horizontal Surface-2 AL 1000 FT AMSL AH FL999 DP 32:53:12 N 130:05:11 E DP 32:48:39 N 130:08:14 E DP 32:48:01 N 130:07:50 E DP 32:47.4201 N 130:07:21 E V X=32:55:01 N 129:54:49 E DB 32:47.4201 N 130:07:21 E,32:42:13 N 129:57:23 E DP 32:42:13 N 129:57:23 E V D=- V X=32:55:01 N 129:54:49 E DB 32:46:06 N 129:54:20 E,32:53.1405 N 130:05:13 E DP 32:53.1405 N 130:05:13 E DP 32:53:12 N 130:05:11 E AC R AN Naha Conical Surface AL GND AH FL999 DP 26:19:56 N 127:41:57 E DP 26:14:34 N 127:40:34 E V X=26:11:45 N 127:38:45 E DB 26:05:50 N 127:45:57 E,26:20:10 N 127:41.4872 E DP 26:20:10 N 127:41.4872 E DP 26:19:56 N 127:41:57 E AC R AN Naha Outer Horizontal Surface AL 1000 FT AMSL AH FL999 DP 26:23:55 N 127:42:59 E DP 26:19:56 N 127:41:57 E DP 26:20:12 N 127:41.3534 E DP 26:20:20 N 127:40:43 E V D=- V X=26:11:45 N 127:38:45 E DB 26:20:20 N 127:40:43 E,26:05:50 N 127:45:57 E DP 26:05:50 N 127:45:57 E V D=+ V X=26:11:45 N 127:38:45 E DB 26:02:08 N 127:48:15 E,26:24:11 N 127:42.4237 E DP 26:24:11 N 127:42.4237 E DP 26:23:55 N 127:42:59 E AC R AN Narita Conical Surface AL GND AH FL999 V X=35:45:55 N 140:23:08 E DC 8.91 AC R AN Narita Outer Horizontal Surface AL 1100 FT AMSL AH FL999 V X=35:45:55 N 140:23:08 E DC 13 AC R AN Northern Training Area AL GND AH 2000 FT AMSL DP 26:46:36 N 128:17:30 E DP 26:45:51 N 128:19:12 E DP 26:45:18 N 128:18:58 E DP 26:45:34 N 128:17:56 E DP 26:45:14 N 128:17:02 E DP 26:43:47 N 128:17:42 E DP 26:41:07 N 128:15:13 E DP 26:41:07 N 128:16:42 E DP 26:40:02 N 128:16:09 E DP 26:40:34 N 128:14:42 E DP 26:37:58 N 128:14:00 E DP 26:39:31 N 128:10:55 E DP 26:41:58 N 128:14:13 E DP 26:45:24 N 128:15:33 E DP 26:46:36 N 128:17:30 E AC R AN Oita Conical Surface AL GND AH FL999 V X=33:28:46 N 131:44:14 E DB 33:37:21 N 131:41:16 E,33:21.3527 N 131:38:16 E DP 33:21.3527 N 131:38:16 E DP 33:21:42 N 131:37:43 E DP 33:27:27 N 131:40:27 E DP 33:29:43 N 131:41:16 E DP 33:37:21 N 131:41:16 E AC R AN Oita Outer Horizontal Surface AL 1000 FT AMSL AH FL999 V X=33:28:46 N 131:44:14 E DB 33:41:31 N 131:41:16 E,33:17:42 N 131:36.1014 E DP 33:17:42 N 131:36.1014 E DP 33:17:55 N 131:35:42 E DP 33:21:42 N 131:37:43 E DP 33:21.3401 N 131:38.2872 E DP 33:21:02 N 131:38:54 E V D=- V X=33:28:46 N 131:44:14 E DB 33:21:02 N 131:38:54 E,33:37:21 N 131:41:16 E DP 33:37:21 N 131:41:16 E DP 33:41:31 N 131:41:16 E AC R AN Osaka Conical Surface AL GND AH FL999 V X=34:47:04 N 135:26:21 E DB 34:42:04 N 135:35:19 E,34:42:31 N 135:17.0372 E DP 34:42:31 N 135:17.0372 E DP 34:42:54 N 135:16:48 E DP 34:43:01 N 135:17:20 E DP 34:45:19 N 135:20:16 E DP 34:45.6408 N 135:20:05 E DP 34:45:59 N 135:19.9384 E V X=34:46:50 N 135:23:45 E DB 34:45:59 N 135:19.9384 E,34:50:03 N 135:24:16 E V X=34:48.0203 N 135:25.1868 E DB 34:50:03 N 135:24:16 E,34:49:33 N 135:27:03 E DP 34:49:33 N 135:27:03 E DP 34:44:46 N 135:32:50 E DP 34:42:30 N 135:34:29 E DP 34:42:04 N 135:35:19 E AC R AN Osaka Outer Horizontal Surface AL 1000 FT AMSL AH FL999 DP 34:42:04 N 135:35:19 E DP 34:39:56 N 135:39:29 E DP 34:39.3212 N 135:39.0218 E DP 34:38.7559 N 135:38:29 E V X=34:47:04 N 135:26:21 E DB 34:38.7559 N 135:38:29 E,34:35:01 N 135:32:13 E DP 34:35:01 N 135:32:13 E DP 34:35:07 N 135:32:06 E V D=- V X=34:47:04 N 135:26:21 E DB 34:39:17 N 135:31:38 E,34:41:36 N 135:34:55 E DP 34:41:36 N 135:34:55 E DP 34:42:04 N 135:35:19 E AC R AN R-101 (by NOTAM) AL GND AH 12000 FT AMSL DP 35:24:31 N 135:55:56 E DP 35:24:27 N 136:01:52 E DP 35:21:45 N 136:01:49 E DP 35:21:49 N 135:55:55 E DP 35:24:31 N 135:55:56 E AC R AN R-104 AL GND AH 20000 FT AMSL DP 33:35:12 N 128:24:52 E DP 33:56:12 N 128:55:52 E DP 33:42:12 N 129:09:52 E DP 33:21:12 N 128:38:52 E DP 33:35:12 N 128:24:52 E AC R AN R-105 AL GND AH FL999 DP 32:20:12 N 128:45:52 E DP 32:20:12 N 129:09:52 E DP 31:47:12 N 129:09:52 E DP 31:47:12 N 128:45:52 E DP 32:20:12 N 128:45:52 E AC R AN R-108 (by NOTAM) AL GND AH 12000 FT AMSL DP 32:47:55 N 131:00:02 E DP 32:44:40 N 131:00:02 E DP 32:43:39 N 130:54:28 E DP 32:46:23 N 130:54:32 E DP 32:47:55 N 131:00:02 E AC R AN R-109 AL GND AH FL999 DP 32:01:43 N 132:37:51 E DP 32:09:13 N 132:59:51 E DP 31:48:13 N 132:59:51 E DP 32:02:13 N 133:29:51 E DP 31:42:13 N 133:29:51 E DP 31:04:13 N 132:07:51 E DP 31:25:13 N 132:07:51 E DP 31:38:13 N 132:37:51 E DP 32:01:43 N 132:37:51 E AC R AN R-114 Fuji AL GND AH 14000 FT AMSL DP 35:27:04 N 138:45:44 E DP 35:27:10 N 138:53:00 E DP 35:16:58 N 138:53:10 E DP 35:16:58 N 138:55:19 E DP 35:13:04 N 138:55:27 E DP 35:13:14 N 138:46:08 E DP 35:27:04 N 138:45:44 E AC R AN R-116-1 AL GND AH 9000 FT AMSL DP 34:35:00 N 140:17:00 E DP 34:33:07 N 140:20:12 E DP 34:22:07 N 140:10:51 E DP 34:31:00 N 140:08:00 E DP 34:35:00 N 140:17:00 E AC R AN R-116-2 AL GND AH 12000 FT AMSL DP 34:33:07 N 140:20:12 E DP 34:20:48 N 140:40:48 E DP 33:55:35 N 140:19:20 E DP 34:22:07 N 140:10:51 E DP 34:33:07 N 140:20:12 E AC R AN R-116-3 AL GND AH FL999 DP 34:20:48 N 140:40:48 E DP 34:08:00 N 141:02:00 E DP 33:44:00 N 140:23:00 E DP 33:55:35 N 140:19:20 E DP 34:20:48 N 140:40:48 E AC R AN R-119 (by NOTAM) AL GND AH 6000 FT AMSL DP 36:25:11 N 138:56:08 E DP 36:26:41 N 138:54:58 E DP 36:27:26 N 138:55:18 E DP 36:26:26 N 138:57:08 E DP 36:25:11 N 138:56:08 E AC R AN R-121 AL GND AH 35000 FT AMSL DP 36:40:11 N 141:04:48 E DP 36:40:11 N 141:20:48 E DP 36:05:00 N 141:20:48 E DP 36:05:00 N 141:04:48 E DP 36:40:11 N 141:04:48 E AC R AN R-127 (by NOTAM) AL GND AH 25000 FT AMSL DP 38:31:10 N 140:40:47 E DP 38:31:10 N 140:51:47 E DP 38:28:10 N 140:51:47 E DP 38:28:10 N 140:40:47 E DP 38:31:10 N 140:40:47 E AC R AN R-129 AL GND AH 35000 FT AMSL DP 40:50:10 N 142:10:47 E DP 40:50:10 N 142:59:46 E DP 40:44:10 N 142:59:46 E DP 40:24:10 N 142:32:47 E DP 40:24:10 N 142:13:47 E DP 40:50:10 N 142:10:47 E AC R AN R-130 AL GND AH 23000 FT AMSL DP 40:52:37 N 141:24:01 E V X=40:52:09 N 141:23:02 E DB 40:54:27 N 141:27:54 E,40:50.8076 N 141:28.4861 E DP 40:50.8076 N 141:28.4861 E V X=40:52:09 N 141:23:02 E DB 40:51:53 N 141:24:08 E,40:52:37 N 141:24:01 E AC R AN R-131 AL GND AH FL999 DP 42:04:09 N 142:16:46 E DP 41:44:09 N 142:57:46 E DP 41:27:10 N 142:42:46 E DP 41:45:39 N 142:05:17 E DP 41:59:09 N 142:03:47 E DP 42:04:09 N 142:16:46 E AC R AN R-134 AL GND AH 35000 FT AMSL DP 34:51:11 N 130:35:06 E DP 34:43:31 N 130:52:01 E DP 34:08:52 N 130:29:01 E DP 34:16:57 N 130:12:37 E DP 34:51:11 N 130:35:06 E AC R AN R-138 (by NOTAM) AL GND AH 9000 FT AMSL DP 42:54:01 N 141:27:07 E DP 42:54:01 N 141:27:33 E DP 42:53:51 N 141:28:13 E DP 42:53:57 N 141:29:15 E DP 42:55:04 N 141:32:29 E DP 42:52:00 N 141:32:01 E DP 42:51:34 N 141:30:59 E DP 42:51:15 N 141:29:27 E DP 42:51:16 N 141:26:13 E DP 42:54:05 N 141:25:52 E DP 42:53:48 N 141:26:36 E DP 42:54:01 N 141:27:07 E AC R AN R-177 AL GND AH 3000 FT AMSL DP 26:27:14 N 127:53.8867 E DP 26:29:14 N 127:51.8867 E DP 26:32:14 N 127:58.885 E DP 26:31:14 N 127:58.885 E DP 26:30:14 N 127:57.885 E DP 26:27:14 N 127:53.8867 E AC R AN R-183 AL GND AH FL999 V X=24:28.2549 N 131:10:52 E DC 3 AC R AN R-521 (by NOTAM) AL GND AH 23000 FT AMSL V X=41:04:03 N 141:23:12 E DB 41:11.9364 N 141:32:59 E,40:56:41 N 141:33:39 E DP 40:56:41 N 141:33:39 E DP 41:04:03 N 141:23:12 E DP 41:11.9364 N 141:32:59 E AC R AN R-532 (by NOTAM) AL GND AH 39370 FT AMSL DP 38:51:11 N 142:21:47 E DP 38:44:11 N 142:31:47 E DP 38:21:11 N 142:09:47 E DP 38:28:11 N 141:59:47 E DP 38:51:11 N 142:21:47 E AC R AN R-533 (by NOTAM) AL GND AH FL999 DP 32:00:13 N 132:34:51 E DP 32:03:13 N 132:37:51 E DP 31:38:13 N 132:37:51 E DP 31:25:13 N 132:07:51 E DP 31:30:43 N 132:09:21 E DP 32:00:13 N 132:34:51 E AC R AN R-91 (by NOTAM) AL GND AH 12000 FT AMSL DP 33:20:10 N 131:13:16 E DP 33:20:03 N 131:21:03 E DP 33:16:24 N 131:20:56 E DP 33:16:14 N 131:13:16 E DP 33:20:10 N 131:13:16 E AC R AN R-92 (by NOTAM) AL GND AH 6000 FT AMSL DP 33:19:40 N 131:25:06 E DP 33:21:56 N 131:25:06 E DP 33:21:56 N 131:26:43 E DP 33:19:40 N 131:26:43 E DP 33:19:40 N 131:25:06 E AC R AN R-96 (by NOTAM) AL GND AH 12000 FT AMSL DP 35:10:15 N 134:09:40 E DP 35:08:53 N 134:12:05 E DP 35:05:39 N 134:09:23 E DP 35:06:57 N 134:07:02 E DP 35:10:15 N 134:09:40 E AC R AN RJR1 AL GND AH FL190 DP 41:01:21 N 140:19:30 E V X=40:58:06 N 140:19:30 E DB 40:54:51 N 140:19:30 E,41:01:21 N 140:19:30 E AC R AN RJR3 AL GND AH FL190 DP 35:45:53 N 135:07:45 E V X=35:45:53 N 135:11:45 E DB 35:45:53 N 135:15:45 E,35:45:53 N 135:07:45 E AC R AN Sendai Conical Surface AL GND AH FL999 DP 38:10:13 N 140:50:52 E DP 38:13:33 N 141:04:14 E DP 38:13.0569 N 141:04:40 E DP 38:12.5386 N 141:5.0362 E V X=38:08:23 N 140:55:01 E DB 38:12.5386 N 141:5.0362 E,38:02:25 N 140:46:37 E DP 38:02:25 N 140:46:37 E DP 38:10:13 N 140:50:52 E AC R AN Sendai Outer Horizontal Surface AL 1000 FT AMSL AH FL999 DP 38:13:33 N 141:04:14 E DP 38:14:49 N 141:09:18 E DP 38:14.1916 N 141:9.75329 E DP 38:13.5392 N 141:10.1399 E V X=38:08:23 N 140:55:01 E DB 38:13.5392 N 141:10.1399 E,37:58:27 N 140:44:27 E DP 37:58:27 N 140:44:27 E V D=- V X=38:08:23 N 140:55:01 E DB 38:02:25 N 140:46:37 E,38:13.4559 N 141:04:20 E DP 38:13.4559 N 141:04:20 E DP 38:13:33 N 141:04:14 E AC R AN TMP Iwakuni ITRA-N2 till 31-Mar-2020 AL GND AH FL800 DP 35:19:37 N 132:15:55 E DP 35:18:05 N 132:18:50 E DP 35:17:31 N 132:20:14 E V D=- V X=34:08:27 N 132:13:57 E DB 35:02:15 N 131:59:23 E,34:44.0518 N 131:22:56 E DP 34:44.0518 N 131:22:56 E DP 34:43:25 N 131:22:37 E DP 34:41:11 N 130:52:51 E DP 34:43:31 N 130:52:01 E DP 34:51:11 N 130:35:06 E DP 34:46:11 N 130:31:51 E DP 34:59:43 N 130:01:52 E DP 35:06:59 N 130:11:21 E DP 35:19:37 N 132:15:55 E AC R AN TMP JSDF Kinkazan 31-Mar-19 AL 50 FT AMSL AH 10000 FT AMSL DP 38:16:41 N 141:34:47 E V X=38:16:41 N 141:34:47 E DB 38:26:41 N 141:34:47 E,38:09:37 N 141:25:48 E DP 38:09:37 N 141:25:48 E DP 38:16:41 N 141:34:47 E AC R AN TMP JSDF X-12-2 till 31-Mar-19 AL GND AH GND DP 36:23:04 N 133:39:50 E DP 36:12:24 N 133:39:50 E DP 35:52:47 N 132:50:22 E DP 36:15:54 N 132:45:48 E DP 36:31:14 N 132:40:39 E DP 36:23:04 N 133:39:50 E AC R AN TMP JSDF X-16 till 31-Mar-19 AL GND AH GND DP 34:25:11 N 129:55:12 E DP 33:50:12 N 129:21:52 E DP 34:00:11 N 128:59:52 E DP 34:33:01 N 129:48:12 E DP 34:30:10 N 129:51:46 E DP 34:25:11 N 129:55:12 E AC R AN TMP JSDF X-20 till 31-Mar-19 AL GND AH GND DP 33:07:12 N 135:33:50 E DP 32:37:12 N 134:02:51 E DP 32:09:13 N 132:53:51 E DP 32:06:07 N 132:50:44 E DP 32:01:43 N 132:37:51 E DP 32:03:13 N 132:37:51 E DP 32:00:13 N 132:34:51 E DP 31:55:40 N 132:30:54 E DP 31:57:09 N 132:30:50 E DP 31:58.6247 N 132:30.6749 E V D=- V X=31:52.7233 N 131:26:15 E DB 31:58.6247 N 132:30.6749 E,32:30:09 N 132:13:52 E DP 32:30:09 N 132:13:52 E DP 32:47:29 N 132:52:58 E DP 33:07:12 N 135:33:50 E AC R AN TMP Shizuhara till 12-SEP-18 AL 6000 FT AMSL AH 11000 FT AMSL DP 35:08:28 N 138:41:31 E DP 34:52:36 N 138:46:49 E DP 34:50:30 N 138:46:49 E DP 34:52:07 N 138:22:52 E DP 34:55:52 N 138:15:55 E DP 35:03:06 N 138:14:14 E DP 35:08:12 N 138:34:49 E DP 35:08:28 N 138:41:31 E AC R AN Tokyo INTL Conical Surface AL GND AH FL999 DP 35:42:06 N 139:47:27 E DP 35:42:07 N 139:47.5198 E DP 35:42:04 N 139:48.2523 E V X=35:33:12 N 139:46:52 E DB 35:42:04 N 139:48.2523 E,35:29:24 N 139:36:56 E DP 35:29:24 N 139:36:56 E DP 35:29:24 N 139:36:55 E DP 35:32:03 N 139:41:34 E DP 35:33:04 N 139:41:25 E DP 35:34:03 N 139:41:36 E V X=35:36:24 N 139:46.5189 E DB 35:34:03 N 139:41:36 E,35:40:08 N 139:43:08 E DP 35:40:08 N 139:43:08 E DP 35:40:41 N 139:44:14 E DP 35:40:57 N 139:45:46 E DP 35:41:00 N 139:47:04 E DP 35:42:06 N 139:47:27 E AC R AN Tokyo INTL Horizontal Surface AL 1000 FT AMSL AH FL999 V X=35:33:12 N 139:46:52 E DB 35:46:01 N 139:49:25 E,35:21.5561 N 139:39:49 E DP 35:21.5561 N 139:39:49 E DP 35:21:43 N 139:39:32 E V D=- V X=35:33:12 N 139:46:52 E DB 35:25:25 N 139:41:29 E,35:41.8695 N 139:49:31 E DP 35:41.8695 N 139:49:31 E DP 35:41:52 N 139:49:29 E DP 35:45:39 N 139:49:07 E DP 35:46:01 N 139:49:25 E AC R AN UNKNOWN AL GND AH FL150 DP 26:27:14 N 126:47.8917 E DP 26:17.235 N 126:55.8883 E DP 26:12.24 N 126:55.8867 E DP 26:12:14 N 126:47.8917 E DP 26:27:14 N 126:47.8917 E AC R AN W-172 AL GND AH FL999 DP 25:14:15 N 127:34:53 E DP 25:14:14 N 128:29:53 E DP 25:04:45 N 128:39:53 E DP 24:16:45 N 128:39:53 E DP 24:16:45 N 127:34:53 E DP 25:14:15 N 127:34:53 E AC R AN W-173 AL GND AH FL999 DP 26:23:14 N 128:19:53 E DP 27:06:14 N 129:09:52 E DP 27:06:14 N 130:59:52 E DP 26:10:15 N 130:59:52 E DP 26:23:14 N 128:19:53 E AC R AN W-173A AL 3000 FT AMSL AH FL600 DP 26:53:14 N 128:54:53 E DP 27:24:14 N 129:14:52 E DP 27:29:14 N 129:34:52 E DP 27:33:14 N 129:59:52 E DP 27:06:14 N 130:14:52 E DP 27:06:14 N 129:09:52 E DP 26:53:14 N 128:54:53 E AC R AN W-174 AL GND AH 15000 FT AMSL DP 26:27.235 N 126:55.8883 E DP 26:27:14 N 127:6.89 E DP 26:12:14 N 127:6.89 E DP 26:12:14 N 126:55.8867 E DP 26:27.235 N 126:55.8883 E AC R AN W-175 AL GND AH 4000 FT AMSL V X=25:56:00 N 123:41:00 E DC 1 AC R AN W-176 AL GND AH 15000 FT AMSL V X=26:36.2383 N 126:49.8867 E DC 5 AC R AN W-178 AL GND AH 15000 FT AMSL V X=26:44:14 N 127:45.8867 E DC 5 AC R AN W-178A AL GND AH 13000 FT AMSL DP 26:53.6033 N 127:32:45 E V X=26:44:14 N 127:45.8867 E DB 26:59:12 N 127:47:07 E,26:52.303 N 128:00:04 E DP 26:52.303 N 128:00:04 E DP 26:52:10 N 128:0.135 E DP 26:48:49 N 127:57.2517 E DP 26:40.2383 N 127:35:53 E DP 26:51.2367 N 127:30:53 E DP 26:51:55 N 127:31.3061 E DP 26:52:35 N 127:31.7676 E DP 26:53:13 N 127:32:16 E DP 26:53.6033 N 127:32:45 E AC R AN W-179 AL GND AH FL999 DP 27:04:45 N 126:39:05 E DP 27:30:14 N 125:56:53 E DP 27:32.2059 N 125:58:01 E DP 27:33.9878 N 125:59:27 E V X=26:22:14 N 127:47:53 E DB 27:33.9878 N 125:59:27 E,28:17:14 N 127:07:53 E DP 28:17:14 N 127:07:53 E V D=- V X=26:22:14 N 127:47:53 E DB 27:32:02 N 127:25:35 E,27:6.55679 N 126:43:32 E DP 27:6.55679 N 126:43:32 E DP 27:05:26 N 126:42:59 E DP 27:04:45 N 126:39:05 E AC R AN W-181 (by NOTAM) AL GND AH FL999 DP 25:41:15 N 130:44:52 E DP 25:26:15 N 131:41:52 E DP 24:23:15 N 130:47:52 E DP 24:53:15 N 130:03:52 E DP 25:41:15 N 130:44:52 E AC R AN W-182 AL GND AH 4000 FT AMSL V X=25:54.2399 N 124:33:53 E DC 5 AC R AN W-183A AL GND AH FL999 V X=24:28.255 N 131:10:52 E DC 5 AC R AN W-184 AL GND AH FL999 DP 24:23:15 N 130:47:52 E DP 25:26:15 N 131:41:52 E DP 25:13:15 N 132:30:52 E DP 24:00:16 N 132:59:52 E DP 24:00:15 N 131:22:38 E DP 24:07:33 N 131:10:25 E DP 24:23:15 N 130:47:52 E AC R AN W-185 AL GND AH FL999 DP 25:41:15 N 128:51:53 E DP 25:48:37 N 129:02:19 E DP 25:44:15 N 129:25:52 E DP 25:44:15 N 130:10:52 E DP 25:43:24 N 130:35:52 E DP 25:41:15 N 130:44:52 E DP 24:53:15 N 130:03:52 E DP 25:41:15 N 128:51:53 E AC R AN White Beach Area AL GND AH 1000 FT AMSL DP 26:18:13 N 127:54:36 E DP 26:18:09 N 127:54:56 E DP 26:17:52 N 127:55:07 E DP 26:17:44 N 127:55:26 E DP 26:17:27 N 127:55:19 E DP 26:17:30 N 127:54:24 E DP 26:18:13 N 127:54:36 E AC R AN Yausubetsu (by NOTAM) AL GND AH 36000 FT AMSL DP 43:20:29 N 144:42:25 E DP 43:19:41 N 144:54:05 E DP 43:18:09 N 145:01:50 E DP 43:13:49 N 145:01:57 E DP 43:13:18 N 144:52:15 E DP 43:17:34 N 144:40:10 E DP 43:20:29 N 144:42:25 E